Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Those limits existed in the very early days of the HST, but modifications have long since been made to the braking and even 2 + 1 ould be permitted at 125
Which defeats the point of using non-standard height couplers that exclude pretty much all other traction. But yeah, they need very high ETS that already removes most locos from hauling, so maybe it's not such a huge disaster.
OBB nightjet Downsized to UK loading gauge. The mk5 is so annoying with it's dellners and at the wrong height at that, but still manual cables.... so unnecessary
Remember, most people are very casually interested in the hobby, and as they now look so different to their other networker cousins, its maybe even good that they have a nickname for people to use, and I'd stil say better than nothing at all.
I'm too young to remember BR, but reading about their multitude of (often repeated) plans.... I certainly admire the optimism many of their plans had, given the continual lack of funds.
https://twitter.com/HiPa1973/status/1251035069961179139?s=19
Interesting 91 load 7 +DVT, anyone know anything about the reasoning for shortening the train? just reduced demand? or is something planned for shortening the trains?
Think you've misunderstood, that's referring to unlocked doors. Obviously slam doors have operated much later than that, HSTs were operating and still are with locking slam doors.
Virgin was pushing for a franchise extension in return for ordering extra pendos, but the Dft overrode them and just ordered the pendos themselves. What number were VTWC planning to order? the same number? or more? had they been planning to get more, XC could have gotten a couple of extra 221s...
I seriously doubt they are going to sell 4 or 5 car 60 mph diesel units. Having an extra type complicates things and it's the diesel generators that are usually the limiting factor rather than a lack of motors. The Island Line is only getting 2 car trains, and I doubt anywhere else will really...
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.