• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. D

    CLC Route Upgrade Study

    From what I've read battery trains are good for about 30 miles between recharging. High charge short overhead rails in certain stations en-route might work.
  2. D

    CLC Route Upgrade Study

    No problem. Thought others might be interested in it. So sad that it didn't even get off the ground as a project before being grounded. Hopefully it'll get resurrected sometime, here's hoping BTW I've added a link to the full PowerPoint presentation used in the video in my thread starter
  3. D

    CLC Route Upgrade Study

    Interesting PWI presentation on the CLC Line of Route Upgrade (posted on You Tube on 28 November 2025 on the Permanent Way Institute (PWI) channel), which was recently concluded by a joint group involving Matt McDonald and WSP, which looked at all the options for upgrading the route between...
  4. D

    GBRf Class 99 - 30 locomotives now ordered

    Out of curiosity, does anyone know whether any consideration was given to adding 3rd rail capability at any time, or would the system be unlikely to cope with the additional energy requirements?
  5. D

    Class 93 vs Class 99

    The Class 93 are essentially a derivative of the Class 88 but with a larger diesel engine and some batteries. This format allows them to be used in a very similar fashion to the 88s, allowing them to shunt wagons or coaches into non-electrified sidings etc. which are just off the mainline or...
  6. D

    Article about Siemen's Rail Proposals

    Part of an article from the Telegraph https://www.telegraph.co.uk/business/2025/01/05/german-giant-siemens-pitch-make-britains-trains-run-time/
  7. D

    Fatal train crossing crash in Texas (20/12)

    Shouldn't it be mandatory to contact the railway control centre before crossing with such a load. I can't understand why they wouldn't have done so otherwise anyway! Absolutely unbelievable attitude.
  8. D

    Crewe Resignalling (Crewe South & Basford Hall)

    There's a quite comprehensive IRSE webinar on this topic at: https://vimeo.com/502110052
  9. D

    What defines an EMU or DMU? Is an e300 Eurostar unit (2 x 373s) and EMU?

    So that motorised axle on the leading passenger car at each end is what renders them as an EMU rather than LHCS?
  10. D

    What defines an EMU or DMU? Is an e300 Eurostar unit (2 x 373s) and EMU?

    But these are only one axle of each end passenger vehicle.
  11. D

    What defines an EMU or DMU? Is an e300 Eurostar unit (2 x 373s) and EMU?

    I'm sorry if this has been discussed previously, but, of course, when you try and search using the title you get hundreds of possible threads, none of which seem to fit the bill. My question arises from a discussion I was having on a Facebook group, where it was asserted that a Eurostar e300...
  12. D

    Publication of Integrated Rail Plan for the North and Midlands

    No I mean a further 4 platforms under New Street, as was done in Antwerp when the Dutch high speed line was built, on in Zurich.
  13. D

    Publication of Integrated Rail Plan for the North and Midlands

    Would have been better with a through station under New Street with 4 platforms. All trains could have gone through with trains heading north east from an underground junction north of New Street. Curzon Street wasn't the best idea.
  14. D

    Publication of Integrated Rail Plan for the North and Midlands

    But whether they live in Runcorn or Widnes, the Wirral or towards Chester, at least they don't have to travel to Warrington as I would strongly suspect they won't stop in Widnes. Warrington already gets a good service North and South
  15. D

    Publication of Integrated Rail Plan for the North and Midlands

    HS2 trains from Liverpool south running from Ditton Junction passed Fidler's Ferry through Warrington Bank Quay Low Level and on to the new HS2 line sounds, well, completely bonkers, just to serve Warrington. Can't see how it could possibly be quicker than going via Runcorn. Not sure that will...
  16. D

    Does renewal work at Crewe ignore government commitments?

    I guess the most odd thing for me is the complete lack of any thought of moving to ECTS in all this. Surely that would get rid of a lot of lineside signalling renewals in one big go. It's got to happen sooner or later. What is it with this country and moving ahead. If the Swiss can do it...

Top