• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. L

    Reduced service on the Metropolitan Line from Monday 11 April 2022

    That's be about normal for the Met then!
  2. L

    Why no platform indicators at High Street Kensington on platforms 3 and 4?

    Well, I know this may come as a shock, but between Stamford Brook and Earls Court, the onboard train displays and announcements and possibly driver announcement at Earls Court would all have told you where the train was going. Yes High Street Kensington is probably missing a fair few indicator...
  3. L

    Remaining Northern Line Bank upgrades following major blockade

    Would be useful, but the Central line is VERY short of drivers, so no guarantees on that. W&C will open fully only if the Central has sufficient drivers to do so.
  4. L

    District Line distribution

    The basic base service on the District at the moment is:- 6tph Wimbledon - Edgware Road 6tph Wimbledon - Tower Hill/Barking/Upminster depending on time of day / day of the week 6tph Richmond - Upminster 6tph Ealing Broadway - Upminster This is supplemented with 6tph Circle and 6tph Hammersmith...
  5. L

    When might night tube reopen?

    It was indeed, but the line is still in the midst of complex duty rostering to ensure all drivers become familiar with the Battersea extension, and not just one depot's drivers. The Bank blockade plus this ongoing training make rostering Night Tube at the current time impracticable. Therefore...
  6. L

    When might night tube reopen?

    Bank = yes. Picc has South Harrow Sidings expansion works, and several other ongoing works related to Picc Line Upgrade that need to be completed prior to Night Tube restarting.
  7. L

    When might night tube reopen?

    Central, Vic and Jub are the end of this month (November). Pic and Northern are postponed until major track work is complete.
  8. L

    Northern Line

    Which is why Mill Hill branch was a shuttle, but we need the rolling stock to provide the Battersea service.
  9. L

    Harlow Local Plan - proposed Central Line extension

    I doubt it would pass the cost benefit ratio analysis, that was the cause of the Met extension to Watford Jcn failing, when it transpired that the actual costs associated with the project were at least double the original estimate, it failed the cost benefit ratio analysis too.
  10. L

    District and Circle Lines work 4-12 August 2021

    TfL rail replacement bus policy is not to provide rail replacement bus services across Zone 1. Hence District replacement buses starting at Tower Hill and heading east via Canning Town (as low bridge precludes West Ham being served) towards Barking. On days when the District does not reach Tower...
  11. L

    Why is the Circle line so slow in the evenings?

    This does not seem to make much sense. Presumably you were at Paddington Suburban platform, rather than the Circle/District platform. Then why did you have to wait for a Circle, what's wrong with a H&C train. And yes you could also have taken the Moorgate train and changed anywhere after Baker...
  12. L

    District and Circle Lines work 4-12 August 2021

    S8's are only driven by Met drivers. No Met drivers are qualified for routes east of Liverpool Street.
  13. L

    District and Circle Lines work 4-12 August 2021

    All trains have H&C/Circle numbers and will be called H&C on the train.
  14. L

    Sub Surface Disruption (11/6/21)

    We do at Embankment. 1624894557 The Tower Hill bay platform was supposed to be made accessible at the east end to both east and west main running lines. For some reason this plan was abandoned and the points that were in removed.
  15. L

    District and Circle Lines work 4-12 August 2021

    Probably worth pointing out that District won't be running services at the east end of the closure, the whole service between Aldgate East and Upminster will be provided by the H&C/District combi-service with driver changes at Barking. The service pattern has previously operated on some weekends...
  16. L

    Sub Surface Disruption (11/6/21)

    The District would not have been able to reverse at Tower Hill, whilst the traction current was off for Aldgate East points repair, as that whole junction area is all on one big switch, sub-switch'ing of sections during planned engineering works is possible, but not in this instance of emergency...
  17. L

    Will the Waterloo & City line ever reopen? (Update: now open!)

    Yes, W&C re-opening has been brought forward. 3 trains peak-hours only service starts sometime this week.
  18. L

    Bakerloo line timetable changes

    Yes, if you have just missed a Harrow train anywhere south of Queens Park - the advice is to get the first train to Queens Park and join the Overground there, which will be running pretty much exactly half-way out of phase with the LU's to Harrow.
  19. L

    Bakerloo line timetable changes

    When the LO ran 3tph north of Queens Park (NR code: QPW; LU code: QUP), and LU ran 9tph (of which 6tph to Harrow) it was all pretty even. The LO was a clockface 20 mins, the LU Harrow's were clockface 10 mins and the 3 to STP were even with themselves every 20 mins, exactly 10 mins apart from...
  20. L

    LU advertises for Schedule Compilers

    Not necessarily. Sorry to be cryptic but nothing confirmed yet.

Top