• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. Harsig

    The Green belt and the Underground

    Had the original Northern Line extension plans been fully realised the Alexandra Palace line would not have been a branch from the current Northern Line at Highgate, rather it would have remained a branch from the original route to High Barnet & Edgware which ran from Finsbury Park (where...
  2. Harsig

    Hammersmith OZ Auto working

    My best guess as to the possible intended function of No. 23 lever would be to allow shunts to and from No. 24 road via OZ17 and OZ24. In this scenario I would imagine that reversing No. 23 lever would allow Nos. 17 & 24 signal levers to be reversed simultaneously (with 22 points lever normal)...
  3. Harsig

    Underground signal boxes circa 1945

    The film 'All that Mighty Heart' has a few shots inside the line controllers offices. Although filmed in the 1960s, I believe the offices depicted dated from just before the period you are interested in. In the clip below the control offices can be seen at 3mins 34secs and again from 10mins...
  4. Harsig

    Co-Acting signals

    Co-acting signals of this configuration were first installed at Chalfont (JT25 & JT25 Co-Acting) and Chesham (JV17 & JV17 Co-Acting) in April 1949. This was in connection with the continuous track circuiting of the Chesham branch, which allowed the existing electric train tablet installation to...
  5. Harsig

    S Stock Update

    There were indeed S8-1s used for testing infrastructure changes on the Hammersmith & City and Circle lines before any genuine S7s were available. As far as I know the S8-1s never ran in passenger service before reverting to full length S8s.
  6. Harsig

    Uxbridge station


Top