• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. GraphitProjekt

    Enduring anachronisms

    Perhaps similarly, large parts of the London Borough of Bexley use Dartford postcodes despite being in zone 4
  2. GraphitProjekt

    The Bedford collision, recovery process discussion.

    As promised, a mock up ROC (rigid overhead conductor)! Although, it's not visible in any streetview after 2020, instead it looks like the have a normal SI to work on I'm surprised that there's only 2 MDUs in East Mids and that neither are especially close to London. I think there are overhead...
  3. GraphitProjekt

    The Bedford collision, recovery process discussion.

    Interesting. Makes sense as Bedford is an MDU for NR East Mids, at least they're not too far away from the site. I suppose once upon a time it was destined for Derby (which I think is the only other MDU in East Mids) to have an OLE depot too
  4. GraphitProjekt

    The Bedford collision, recovery process discussion.

    I'm impressed with how quick the OLE went back up, as far as I'm aware headspans have extra complications compared to to other structures. Where's the OLE depot based for MML? Exactly, it's great to have a story of upmost competence from the modern rail industry, especially Network Rail who are...
  5. GraphitProjekt

    Enduring anachronisms

    I think a DSLAM is the kind of equipment we're talking about for sure: for seperating analogue voice from broadband data, modulating the data onto a different medium and presumably doing some kind of packet routing. But I'm more curious about the scale of physical infrastructure belonging to...
  6. GraphitProjekt

    Enduring anachronisms

    How does this work? Did those providers have to install their own equipment within and alongside BT stuff in every exchange throughout the country?
  7. GraphitProjekt

    Enduring anachronisms

    And maybe also I would apply this to the Docklands Light Railway who seem to operate at least some services with train drivers, especially in peak times. I'm told this is to do with the risk of people falling on the tracks on busy platforms though there's a chance that's all made up and it's...
  8. GraphitProjekt

    Signal berth codes?

    perhaps a hot axle box detector?
  9. GraphitProjekt

    Incident at Sheffield - 24/06/2026

    there was some implication that 195s were designed with their direction controllers on backwards, is that true?
  10. GraphitProjekt

    Report of collision Bedford (Elstow) - 19/06/26

    We do know it must have been ahead of WH154's overlap as the RAIB mention 1H46 passed the signal protecting Bedford S junction at yellow (that's WH356)
  11. GraphitProjekt

    Electrical Control Rooms

    I see they had marked SI at Mitre Bridge which seems to suggest they were looking ahead to when a neutral section would be put there (apparently fed 2011) to split up the two Acton Lane supplies. Interesting that Primrose Hill TSL was not present in 2008 (although naming one of the Camden...
  12. GraphitProjekt

    The Bedford collision, recovery process discussion.

    Who did the rail crane belong to and where does it normally live?
  13. GraphitProjekt

    The Bedford collision, recovery process discussion.

    I suppose we can witness a rare and unusual benefit of Headspan electrification structures as the entire OLE support structure can effectively be disappeared. With an OLE type using MIR (and so requiring portals or TTCs) there is another complication to this kind of operation. As above pictures...
  14. GraphitProjekt

    Electrical Control Rooms

    Thank you very much these are fascinating. I like that Harlesden TSL was on its own little cabinet, I imagine it was late addition related to the Railnet terminal. This must have been a good 8 or so years after it closed. I presume it's demolished now, whereabouts was the building? There's a...
  15. GraphitProjekt

    HS2 Construction Updates - Birmingham Area

    The IET replacement for Voyagers feels pretty inevitable. Even with MML and Derby-Birmingham wired, they still have to run deep into the west country or negotiate power supply weaknesses on ECML and around Manchester.
  16. GraphitProjekt

    HS2 Construction Updates - Birmingham Area

    I wonder if any useful freight electrification could be enabled taking wires further to Nuneaton. Also I find it surprising no actual intention has ever been made to think about electrifying Birmingham - Derby, one of the last 125mph areas with no electrification
  17. GraphitProjekt

    Transpennine Route Upgrade and Electrification updates

    Yeah they definitely should and would not be altering the platforms to fit the old standard train height. It would be out of gauge with container freight anyway I think
  18. GraphitProjekt

    Transpennine Route Upgrade and Electrification updates

    According to the ELR numbers it's just over 42 miles from Victoria to Leeds. (I'm going off MDL2 which ends at Whitehall West Jnc at 42m 25c, datum is listed as Victoria via Huddersfield)
  19. GraphitProjekt

    OLE configuration on Fen Line

    Indeed they do not, some quite impressively long feeding distances in this area though.
  20. GraphitProjekt

    OLE configuration on Fen Line

    Can't think of any other line with a similar arrangement. Then again, significant lengths of electrified single track line are a bit rare. Maybe the lines to Largs or Wemyss Bay have it?

Top