• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. T

    Kings Cross ‘uncrossed’ Layout/Remodelling - Information and Updates

    News Outlets started publishing about closure in 2 Weeks: https://www.railadvent.co.uk/2020/06/do-not-travel-warning-ahead-of-next-stage-of-london-kings-cross-upgrade.html
  2. T

    Possible Fleet classification of the Avanti AT300s

    This is silly a different TOPS for different operators why couldn't it just be 802 for bi-modes and 803 for electric it would mean that the fleet is more equal.
  3. T

    Stevenage platform 5

    https://www.railforums.co.uk/threads/kings-cross-‘uncrossed’-layout-remodelling-information-and-updates.201659/
  4. T

    Ex LNER (and Grand Central) Mark 4 sets for TfW

    https://www.sell2wales.gov.wales/search/show/search_view.aspx?ID=MAY334182
  5. T

    Ex-Northern 321/9 and 322 for Greater Anglia

    Looks like there was to be another move for Greater Anglia. Anyone know which numbers they were meant to be.
  6. T

    Which company would you think will takeover the Liverpool-Nottingham Section of EMR Regional's Liverpool-Manchester-Nottingham-Norwich Route?

    TransPennine Express as the will have excess Class 185's coming off lease soon. So they can use those to save another TOC taking on extra traction and to keep Class 185 in house at TPE.
  7. T

    Northern Unit Refurbishments and depot allocations.

    That was only because a path set up got cancelled.
  8. T

    EMR Class 170 updates

    See thread https://www.railforums.co.uk/threads/east-midlands-railway-livery-and-station-branding.187931/
  9. T

    EMR Class 170 updates

    170416 has now been reliveried.
  10. T

    Possible Fleet classification of the Avanti AT300s

    803 for electric 802 for bi-mode
  11. T

    DLR B23 Stock (CAF Inneo)

    Bombardier aren't the only manufacture of trains in this country. CAF have excellent products on the market and have made plenty of trains and built a factory here in the UK. A operator also doesn't need to stick with a company to build rolling stock for them. It was as a fair tender and CAF...
  12. T

    Kings Cross ‘uncrossed’ Layout/Remodelling - Information and Updates

    Made all the changes Thanks for the feedback
  13. T

    Kings Cross ‘uncrossed’ Layout/Remodelling - Information and Updates

    Looking at Real Time Trains for when London Kings Cross is closed on the weekend of 20th and 21st June 2020 it look like trains will run: Great Northern Stevenage to Gordon Hill (every 30mins Sat/Sun)- Reverse empty at Gordon Hill from Platform 3 to Platform 2 using south crossovers...
  14. T

    Ex-Northern 321/9 and 322 for Greater Anglia

    With 321 901 and 321 902 transferred to Clacton. I thought it were best to drag the conversation away from the Northern 321/322 withdrawal thread over to this one.
  15. T

    Stevenage platform 5

    Why is this I thought Thameslink go in the way.
  16. T

    Class 710 LO

    Have any of the 5 car units been delivered?

Top