Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
looks like somebody mixed up time zones
got a Avanti Train too Manchester later today and found the website shows the time of 15:53 but the email i got yesterday shows it as 16:53 instead
Website
(image shows 15:53 - 18:06 Euston to Manchester)
Email
(image shows 16:53 - 19:06 Euston to...
Swansea Station suffers from similar issues to Stuttgart has in being a terminus station that is midway along a few mainlines, so needs longer dwell times to reverse trains.
Another more Swansea-centric issue is the sharp curve at Neath that slows trains down to 40mph as well as its lack of...
Recently helping various members on my Family Travel to Heathrow from the West of England/South Wales I have realised just how much of a hassle it is compared to traveling from London itself
While I have the Elizibeth Line/Picadilly Line/ Heathrow express all as direct Trains to the Airport if...
so looking at the southampton area on google maps to check distance from the main station to one of the cruise terminals for an upcomming cruise and realised not only to a few of the terminals still habe tracks next to them/near but the QE2 terminal still has its platform (albiet barriered off)...
so watching this video that covers mainland europes Strategic steam train reserves
essentally if you wanted a train for rebuilding the country post nuclear war and EMP blast not much better than a steam train as no pantograph or fuseplug/glowplugs aka no electrics
lets say the army wanted a...
so with france looking into higher voltage DC OHLE to replace its 1.5Kv system wonder if it would make sence for converting parts of the southen region to OHLE?
being DC would make it less complex to dual electrify existing 750v third rail systems so rollout could cheaper and let existing stock...
as a hypothetical if a for some reason a full 16 car rake such as the low/highlander needed diesel haulage what could so do
assuming using a class 92 or 73 as a translator could a single 66/67/68 manage or would you need to double up?
so in 2 weeks in on NJ470 that due to engineering work terminates short at hannover at 6am, my onwards connection to hamburg isnt till 8am so wondered how long after arrival can you stay onboard before they turf you out to take the train to the depo?
so NJ and many of the new EN trains have proved very popular to the point many are solid booked weeks in advanced and just adding more coaches wont be possible beyond a extent
would any make sence to run 2 trains split by a hour or two?, e.j. run NJ470 Zurich to Hamburg as it is now 21:00-8:10...
so realised this the other day, do any european railways in europe apart from the UK use half cabs with the ability for thru coridors like we have on the class 350, 730, 158, 442 etc?
i know DSB IC3's have thru corridors but they have a full cab that moves out of the way to link up
with how effectly all freight that covers the southen region being diesel hauled is it time to think about a modern replacement for the 73's?
would some kind of battery bi/tri mode work that runs on third rail but with a battery to act as a buffer for power draw needed would outstrip what the...
kind of a split off from https://www.railforums.co.uk/threads/how-would-br-have-handled-the-intercity-express-programme
expanding the idea of the IEP would the concept of a centalised Design with contracted out manafacture ecosystem work these days?
a modern BREL develop the standardised...
Planning travel from Malmo to Berlin last weekend of July but finding neither of the sleeper trains are running due to planned track work for a few days
anybody know where the track work is planned as know alot of people who will be needing the Oresund bridge crossing for a event during this time?
So traveling with Avanti tomorrow and get a "your traveling with us tomorrow" reminder email and it comes with this absolutely terrible to read block of text regarding Euston platform timings, seriously who chose this to be yellow on white when literally nothing else is that colour in the email?
does anybody know if DSB have released tickets yet for after the winter timetable change?
most notibly the hamburg to copenhagen trains and if they are running the overnight one in winter anymore?
if steam production had stayed into the modern day how might have designs changed with this times?
Mechanical Stokers?, modernised Diesel like controls from cabs either end?, in cab signalling etc
after nearly 30 years in service what upgrades/alterations could be made to improve the Channel Tunnel?
one thing i would suggest would be addition cross passeges to allow shorter unit length of passenger trains so 2x200m operation could be done without needing special arrangments
and any way...
simple question, 320km/h is the current "high speed" spec on new lines but stuff like HS2 and some lines in China are being built for 360km/h and some trains designed for up to 400km/h and test runs reaching far above that
as i dont think supersonic trains are gonna be a thing, whats prob the...
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.