• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. J

    GWR fleet procurement

    At no point did I say that a battery set would be more likely to fail. I was suggesting that a very busy section of double track main line - which should of course have been electrified almost a decade ago, had Network Rail done proper advance planning and kept its costs under control - may not...
  2. J

    Future of the GWR electrification

    The only planned changes to the track layout at Oxford are those needed for the new platform 5. Details of all recent and ongoing Network Rail projects in the Oxford area can be found at this link https://www.networkrail.co.uk/running-the-railway/our-routes/western/oxfordshire/
  3. J

    GWR fleet procurement

    Where did I say it would be worse? Any failure between Oxford and Didcot causes an almighty mess, due to the frequency of trains. As opposed to the consequences of a battery set failing on the Henley branch, for example. Installation of 25kv overhead there is a no brainer, both to eliminate...
  4. J

    GWR fleet procurement

    The IETs that work morning peak trains to London after spending the night at Hereford or Worcester usually go straight to North Pole depot after reaching Paddington. Foregate Street is just a no-no for anything other than 9-car sets with SDO - you can't put a platform extension out over the...
  5. J

    GWR fleet procurement

    If only there was the neat and tidy binary divide in passenger numbers beyond Oxford that you imply. What does peak even mean these days? Weekend loadings both days west of Oxford can put pressure on 5-car sets, which partly explains why GWR increased the number of 9-car sets in use on...
  6. J

    Two trains on single track

    No, it doesn't. Once a train has passed the home signal just to the west of Wolvercote North Junction, as it is now named, no other train can enter the section until the first train has entered the double track section at Charlbury.
  7. J

    Class 165 on service to Great Malvern

    166s were in regular use until 2017 on Oxford and Cotswold Line services (including, as noted above, runs to Hereford every bit as long as Cardiff-Portsmouth) despite not being up to the job long before that - yet some people posting on this forum apparently seem to think that there was no need...
  8. J

    Class 165 on service to Great Malvern

    Why can't you believe it? GWR's shortage of rolling stock is well known, as is the ditching of the plan to put 769s on Reading-Gatwick to release more Turbos to Bristol, that would have meant GWR might actually be able to reliably provide the five-car Turbo formations that are supposed to...
  9. J

    GWR Waterloo and Euston

    The odds are that Cotswold Line trains will run to and from Reading - this has been the practice for a long time now when there is no access to Paddington. It gives passengers to/from London the obvious option of changing at Oxford to/from Chiltern, which avoids mixing them up with other GWR...
  10. J

    Opportunity Cost of Poor BR decisions.

    Hindsight is a wonderful thing, isn't it? The order for Mk3 sleepers was placed in 1979, when there were a lot more overnight trains operating. The Timetable World site has the 1982-1983 Great Britain Timetable available, in which the section listing stations where you could use a sleeper...
  11. J

    Avanti West Coast Withdraws Shrewsbury Service From June 2024

    Yes, off-peak services are still provided - and Shrewsbury had them back in the 1980s - in part because of the reason I noted about keeping the post-2019 timetable's hourly service between Paddington and Worcester balanced. If the couple of trains that go to Hereford off-peak did not do that...
  12. J

    Avanti West Coast Withdraws Shrewsbury Service From June 2024

    You do realise that the early morning peak service from Hereford towards London has been reduced from three trains down to one, don't you? And four evening arrivals is now two. Hardly suggestive of great demand there either, is it? The survival of that one morning service to London probably has...
  13. J

    Class 810 for East Midlands Railway Construction/Introduction Updates

    If the moderators would allow me just a tiny bit of leeway to clarify the question of formation lengths, the DfT's Intercity Express Programme specification for what became the 80x series of trains set a maximum permitted length for a formation at 312 metres - ie a 12-car formation of 26m...
  14. J

    GWR Class 230 Information, Movements & Discussion.

    There are some photos of 230001 taken by Martin Loader at Moreton-in-Marsh on Monday on his website http://www.hondawanderer.com/Recent_Additions.htm
  15. J

    Wrexham, Shropshire & Midlands Railway updates

    Which really should not have come as a surprise, as that was the basis on which BR had reshaped the timetable when it replaced the dmus to/from Wolverhampton, plus a few extensions of London-Wolverhampton InterCity services to Shrewsbury. The switch to having 158s operating to/from Birmingham...
  16. J

    Extensions of East-West Rail Past Oxford

    Sorry, but there is an area of land to the south side of the station at Hanborough, set aside by developer that built the new housing there, specifically for provision of more car parking spaces (I recall that 400 was the figure mentioned during the planning process), and a station building - or...
  17. J

    Extensions of East-West Rail Past Oxford

    From the point at which this project began to take shape it was talked of in terms of attracting people heading to south Oxford and Cowley out of their cars, whether they were changing in Oxford or arriving on direct services from the Bicester direction coming off the Chiltern route or EWR, or...
  18. J

    Extensions of East-West Rail Past Oxford

    Has it occurred to you that there might be demand TO South Oxford, from Bicester in particular, should trains on the branch be extensions of the Chiltern service? There are a lot of businesses in that part of Oxford, not just the BMW Mini plant and - big clue - the proposed stations would be...
  19. J

    Hereford Platform 4?

    The siding at the east side of the station is used six nights a week to stable a GWR IET that works the early morning service to Paddington. Prior to the introduction of IETs, an HST was stabled there from 2008, when FGW had the shore line equipment repaired following a series of cases when...
  20. J

    Hereford Platform 4?

    Thanks - I thought that was the case.

Top