• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. D

    Northern Unit Refurbishments and depot allocations.

    Because there is an unused cupboard at the intermediate end of one vehicle that now houses all the stuff (it's locked via security key).
  2. D

    Northern Unit Refurbishments and depot allocations.

    The large blue cabinets contain all the electronic bits for the digital train. There's quite a bit in there!
  3. D

    Northern Unit Refurbishments and depot allocations.

    Now cited to be the 31st Jan but I wouldn't count much into it.
  4. D

    Updates On The Ex WM 323s at Northern

    Should be 323219 but depends on this storm if it runs.
  5. D

    Updates On The Ex WM 323s at Northern

    A 323 can be recovered using a 769.
  6. D

    Northern Unit Refurbishments and depot allocations.

    156907 (which would have become 407 if Northern had taken it) never got started. It's currently used to shunt other items around Long Marston that have BSI couplers. It will be a donor unit for others, just not sure of the timeline (but probably this year).
  7. D

    Northern Unit Refurbishments and depot allocations.

    Just a move for Tyre Turning.
  8. D

    Porterbrook Cl.769 'Flex' trains from 319s, initially for Northern

    Policy is that as long as the graffiti is not offensive or dangerous to sight lines it can run in service until opportunity arises to get it cleaned off. 1737547127 Actually turns out that the fault lies with the loco (more specifically the adaptor that's used to convert Class 37 brake signals...
  9. D

    Northern Unit Refurbishments and depot allocations.

    Yes, expected to go for C6 middle of Feb.
  10. D

    TfW withdrawals (Now just 150/158s to go)

    After 150253 it will be 150229 on the 7th March followed by 150240 on the 21st April.
  11. D

    TfW withdrawals (Now just 150/158s to go)

    150253 is expected to be withdrawn on the 4th Feb.
  12. D

    Northern Unit Refurbishments and depot allocations.

    Yes, but expected to be released 25th Jan.
  13. D

    Porterbrook Cl.769 'Flex' trains from 319s, initially for Northern

    So, 25kV supplies is a long used railway term for the overhead wires. The overheads don't actually run "at" 25kV, they fluctuate. Recent standards when renewing AC overhead equipment (EN50163 is the standard - this is for trackside equipment) allow for higher transient voltages than previously...
  14. D

    Porterbrook Cl.769 'Flex' trains from 319s, initially for Northern

    769's cannot operate on overhead lines outside of their current operating area without further modification. The upgrade works in the Liverpool area has meant that the software that controls the traction package is a modified software for just these units. To travel further North would mean...
  15. D

    Porterbrook Cl.769 'Flex' trains from 319s, initially for Northern

    Having worked on 319's since their introduction to Selhurst in 1988 and throughout my career "down south" the traction motors (GEC G315BZ's) have always been a source of failure and I've always found not as good as the EE507's, which were definitely easier to maintain. Imagine my delight (sic)...
  16. D

    Porterbrook Cl.769 'Flex' trains from 319s, initially for Northern

    769431 being hauled by 37884 (currently).
  17. D

    Why have 350110, 350111 and 350115 been denamed?

    It is common to remove decals and names from units when they are due to be handed back to the owning company.
  18. D

    Porterbrook Cl.769 'Flex' trains from 319s, initially for Northern

    It takes about 120 days to take apart, fix and put back together a 150. So roughly 4 months per unit. The ex-TfW units are not financially viable to repair anymore because TfW are getting new units. If Northern were to take on the ex-TfW 150's then they'd have to wait 4 months before the first...
  19. D

    Updates On The Ex WM 323s at Northern

    Short answer is the refresh work could start soon (it has to be completed before Jan 26) along with some other stuff but I'm unaware of full scope. 323207 should be going back in.

Top