• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. H

    Avanti dispatchers not wearing high vis jackets

    IIRC an incident occurred trackside some years ago where the people concerned were unable to be identified, therefore all Hiviz jackets, vests etc were changed to show the wearers employer on the back. That still stands so wearing a Hiviz serves several purposes not just as PPE
  2. H

    Transpennine Route Upgrade and Electrification updates

    Aren't wooden sleepers used for a transition between concrete and steel sleepers ? Seem to remember my old track mate telling me something along those lines as well as wooden sleepers having a right way up.
  3. H

    Possible electrification schemes in the pipeline?

    And if course the WSM extension will need resignalling.
  4. H

    NR fined £3.75m for Margam incident

    I would suggest that in that case the Hi Viz is used as a means of identification and not in its role of PPE.
  5. H

    Cable theft at Bolton 28 December 2024

    All newer signalling, telecom and D and P cables are marked with Network Rail and the type of cable. A few years ago I was helping BTP with a "sting" operation and we did find older but still marked cable in a scrap yard. So no, not a fragmentation issue.
  6. H

    Closure of Thameslink services Harpenden to London over Festive Period

    I should have written protect instead of waterproof but it is a bit early for me and rational thought. :D
  7. H

    Closure of Thameslink services Harpenden to London over Festive Period

    I'm wondering whether EPS blocks will be used for the back fill and the sheeting is for waterproofing those blocks. It was certainly the way we did it at a similar bridge in the Bristol area a couple of years ago.
  8. H

    Tfw Fibre

    Does TFW have a SCADA system installed? I know that SCADA system I've seen has its own dedicated 48 fibre cables. That might prove better for spare fibre capacity than the FTN or at least offer diversity.
  9. H

    Public perception of railways

    Perhaps the question should be the "Publics expectation of the Railway" In most cases the expectation and the reality don't match up.
  10. H

    Strange New Lineside Sensors

    I believe trials are being undertaken using optical fiber cables to monitor earth movements, they may even be in use now. Optical fibres are great at reacting to acoustic changes. There's a common piece of test equipment which is used for identifying fibre cables, attach a lead to a fibre at...
  11. H

    Blue Trackside Fencing

    It's called Vortok fencing and provides a barrier between the staff working and the track. A fenced green zone. Each of the arms has a strong magnet which attaches to the web of the rail, the blue fiberglass poles clip on to the arms.
  12. H

    UK rail minister got engineer sacked for raising safety concerns

    When I was working for NR I was actively involved on a high profile project which was very much in the public eye. We were actually being watched by passengers as the work was going on. We were told that any questions asked by the public were to be directed to the comms team. Not easy when small...
  13. H

    The simple pleasures in life

    The peace you feel in hidden away country churches. The sound of sky larks. That wonderful time just before dusk when everything goes quiet, known by us anglers as last knockings.
  14. H

    trivia songs that mention trains/ railways

    Mean old train. Papa Lightfoot. Great blues bopper. If you're in to blues boppin of course.
  15. H

    trivia songs that mention trains/ railways

    Lonesome train. Johnny Brunette This train. Big Bill Broonzy Freight train boogie. Louvin Brothers. Freight train. Larry Hart Love train. Jackie Wilson
  16. H

    Now Playing....

    The Quintet of the Hot Club of France. Minor Swing.
  17. H

    The Health & Safety at Work Act is 50

    When people got more stupid.
  18. H

    Deliberate arson attacks on SNCF's network

    Fibre is easy to joint and test nowadays. Back in the day an 8 fibre cable could take up to 12 hours to repair if you were lucky. I suspect the French jointers will enjoy the overtime.
  19. H

    Dawlish seawall in the news again

    Just a couple of thoughts. If the wall has to have a barrier installed as instructed by a judge then will it have to be closed until said barrier is fitted as it's been deemed to be unsafe in its present condition ? Again if the barrier gets damaged then again will the walkway have to be closed...
  20. H

    Future of the GWR electrification

    Iirc the canopies needed to be cut back to allow clearance for the ole but as that wasn't allowed the platforms had to be extended instead.

Top