• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. T

    Class 701 'Aventra' trains for South Western Railway: progress updates

    They're permitted both routes, but cannot call at Ash or Wanborough if diverted via Guildford.
  2. T

    Class 701 'Aventra' trains for South Western Railway: progress updates

    After working 2S18, 0802 Weybridge to Waterloo rather than going to depot the 701 works 2S23, 0952 Waterloo to Weybridge, and sticks on that diagram for the rest of the day, which after the Weybridge is 3 round trips to Reading before the 2352 to Hounslow. 458/4 diagrams are down to 7 pairs as...
  3. T

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Remains at 45 diagrams this week. AFAIK it should remain at roughly one new diagram every week until 50 diagrams are reached, but that doesn't necessarily mean a new one each week. I think some diagrams go in as pairs after a week's break.
  4. T

    Class 701 'Aventra' trains for South Western Railway: progress updates

    It's 45 701 diagrams next week.
  5. T

    Marseilles trip

    Booking via phone for SNCF is much easier. The number is on the RSTL website. Booking at a ticket office seems to produce mixed results if using a coupon. It's not an issue getting the FIP discounted fare but getting just the reservation fee seems to be much more difficult.
  6. T

    Introduction of European Entry-Exit Scheme (EES)

    Appeared to be the same as before on Wednesday, just without the stamping. The EES kiosks before going through security are all switched off still. I used an E Gate and was pretty much straight through. I assume if you use a manned booth you will have fingerprints and photo done.
  7. T

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Next week's new 701 diagrams replaces a pair of 458/4s on Windsor services all day.
  8. T

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Another main suburban diagram is introduced. The effective additional diagram starts and ends at Guildford, although it swaps at Waterloo after the first train with a current diagram to cycle units around.
  9. T

    Class 701 'Aventra' trains for South Western Railway: progress updates

    That makes sense. There are 120 450 diagrams and 4 of those are booked stabled at depots; 1 at Fratton and 3 at Wimbledon Park.
  10. T

    Class 701 'Aventra' trains for South Western Railway: progress updates

    There's another 701 diagram starting next week, although not one from the LTPs. It's a main suburban diagram starting and ending at Guildford Up Carriage Sidings.
  11. T

    Class 701 'Aventra' trains for South Western Railway: progress updates

    I believe this is the main issue. They can go a while without the tanks being emptied, but not so long without the water being topped up. And of course the 455s they largely replaced did not require that, so there's plenty of stabling locations without the ability to top up the fresh water.
  12. T

    Class 701 'Aventra' trains for South Western Railway: progress updates

    There is a new diagram next week. It's a bit confusing though as part of the diagram has been 701 this week, with part of what was previously a 701 diagram being a 450 this week instead. Both diagrams are 701 from next week. It's a main Suburban diagram.
  13. T

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Well, it's actually an STP fudge to another issue. The unit off 1N95 should go empty to Farnham Depot from Aldershot, with the unit off 2D51 going empty to Clapham Yard. They should swap back round in May when the issue is resolved.
  14. T

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Still 39 diagrams next week, but at least one is a bit different to this week.
  15. T

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Next week's new 701 diagram: 2C12 0609 Reading to London Waterloo 2S15 0752 London Waterloo to Weybridge 2S24 0933 Weybridge to London Waterloo 2C29 1120 London Waterloo to Reading 2C40 1309 Reading to London Waterloo 2C43 1450 London Waterloo to Reading 2C54 1639 Reading to London...
  16. T

    Class 701 'Aventra' trains for South Western Railway: progress updates

    I understand that some of those were ahead of schedule too which explains the current gap. There have been no issues covering diagrams recently either.
  17. T

    SWR 455 twilight diagrams/workings

    Likely a fault that required the train to be taken out of service, but was then able subsequently to be rectified by fitters at Waterloo. Generally on SWR the priority is clearing the line, which may mean isolating safety systems requiring the train to come out of service, then moving it...
  18. T

    Class 701 'Aventra' trains for South Western Railway: progress updates

    It's 37 701 diagrams this week, and I think 38 have been in service most days with an extra covering for 458/4s.

Top