• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. G

    GWR timetable cut back

    Looks to be same again today, and nothing showing on Journeycheck, although showing as cancelled on National Rail JP.
  2. G

    Class 175s to GWR

    The update from Modern Railways states that it's Penzance-Exeter runs and each unit is expected to take around a week to complete this...
  3. G

    Great British Railways - First Train in New Livery

    It's also a tiny, tiny cost compared with the overall cost of running the railways. People who have absolutely no idea of how much it costs to run buses have the same obsession with the cost of repainting buses.
  4. G

    Southeastern metro fleet replacement/improvement

    Oops, I meant Class 745! We know the Adessia will be low floor. The Stadlers fit the definition of low floor because they allow level boarding. Just like low floor buses are those with step-free access even though there's usually a large step up towards the rear to accommodate the engine etc...
  5. G

    Southeastern metro fleet replacement/improvement

    It's not as if we don't already have low floor trains though, eg, Classes 345, 777 and LU S Stock. Plus the Alstom Adessia (successor to Aventra) and the various Stadler designs are only offered in low floor format.
  6. G

    GWR timetable cut back

    The sandwiches were always so hit and miss as not to be relied upon anyway. Hopwood clearly doesn't believe in catering on trains. His one visible contribution in his brief tenure at SWR was to abolish the last of the catering.
  7. G

    GWR timetable cut back

    Lack of a national rolling stock strategy and dithering and stalling by the DfT and Treasury.
  8. G

    GWR timetable cut back

    And of course removing trains from the timetable rather than showing them as cancelled means Delay Repay can't be claimed.
  9. G

    Southeastern metro fleet replacement/improvement

    I would expect a 700/701-type metro interior.
  10. G

    Wrong Ticket Sold on board Greater Anglia train?

    What's the civil service got to with anything?
  11. G

    Southeastern metro fleet replacement/improvement

    From the current issue of Modern Railways (printed edition): There's no other details about the trains in the article.
  12. G

    TfL wheelchair priority

    I'm trying to bring a bit of additional perspective to this thread from my own personal experience. That's all.
  13. G

    TfL wheelchair priority

    Exactly my thoughts as well.
  14. G

    GWR timetable cut back

    Yes, it is. Here's the full text from the email sent to stakeholders by GWR outlining the issues and what's being done to sort it all out:
  15. G

    TfL wheelchair priority

    Just to add a bit of balance to things... I use London's buses regularly. I'd say around 1 in 10 of my trips has a wheelchair on board. In the last 3-4 years I've only seen one wheelchair user unable to board - and that was because there was already a wheelchair on board. What I have seen...
  16. G

    Class 175s to GWR

    An email has been sent to stakeholders updating on the latest Class 175 position. There are timetable reductions from 7th September while the issues with the 175s are sorted out before they enter / re-enter service. Email text below. I don't have a source link but on this occasion this has been...
  17. G

    GWR timetable cut back

    Nothing on journey planners yet that I can see. Seems to be all the fashion for operators to tell us they're "temporarily removing services from the timetable" but not actually provide us with the most useful information, ie which services.
  18. G

    Stopgap options to cover for delays to introduction of Class 175 for GWR?

    You've answered your point in your first sentence!
  19. G

    Stopgap options to cover for delays to introduction of Class 175 for GWR?

    As GWR are temporarily reducing their Penzance - Plymouth/Exeter timetable from 7 September to account for the ongoing 175 issues that won't be needed.
  20. G

    Southeastern metro fleet replacement/improvement

    Stadler needs to be in there somewhere given that it's one of the shortlisted bidders. :)

Top