• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. I

    Is Open Access abstractive or does it genuinely plug gaps?

    Who said anything about Virgin? Hull Trains are far from the only operator running between Selby and Doncaster. Both Northern and LNER operate over this section of line. In fact that is an interesting point. We always hear about the costs of withdrawing services over a section of track, but...
  2. I

    Is Open Access abstractive or does it genuinely plug gaps?

    Of course if you wanted to be an MP pushing in the same direction as the government (and hence have a chance of success) you'd table an amendment to amend the Not Primarily Abstractive measure. When you think about it, £0.30 for every £1 income is pretty poor. If Open Access is really what it...
  3. I

    Dft tender £350m for advice and consultancy etc

    We'll know renationalisation is making itself felt with Department for Transport Operator makes a bit for a contract like this.
  4. I

    Incident at Dalcross Station (25/10/25)

    Interesting that the defence made the argument that the defendant shouldn't have been put on the train by the police.
  5. I

    GBR Business Units - Thameslink and WMR

    The IBUs you're looking for are: West Midlands Railway Chiltern Railways NR's Central Route London North Western Railway Avanti West Coast NR's West Coast South route Not sure what Thameslink have to do with that?
  6. I

    GBR Business Units - Thameslink and WMR

    Thameslink's Intergrated Business Unit will be, TSGNL and Network Rail's Sussex Route. Most if not all IBUs will have certain train services which extend onto infrastructure managed by a different IBU. Think of Sectorisation - there was never a ruling that Intercity didn't run onto Regional...
  7. I

    Collision with tractor near Leominster (22/05/25)

    This is quite interesting actually - there are examples of gate boxes where examining the block indicator is the method used to determine whether it is safe to cross or not. So assuming it is relatively normal to insert another repeater block instrument into the block circuit then you could add...
  8. I

    Transpennine Route Upgrade and Electrification updates

    I believe the programme included closure of them all, but that Copmanthorpe is still outstanding.
  9. I

    Collision with tractor near Leominster (22/05/25)

    I suspect you may be falling into Confirmation Bias here, if the vehicle driver is at fault there will rarely be an RAIB investigation, whereas if the railway is at fault there will usually be one.
  10. I

    Northern Unit Refurbishments and depot allocations.

    A significant factor always seemed to be the 4 car 150 workings that terminate at Knaresborough and therefore could require a change of ends on Knaresborough viaduct. That doesn't seem to be a thing anymore so perhaps that has significantly changed the outlook? The 150/1s are not exactly...
  11. I

    Unusual deployment of resources within marginal time (Trivia)

    Arguably LNER's 1N00 0808 Darlington to Newcastle is an example of this, the set then goes on to work a Newcastle to Kings Cross service, and in the original timetable plan it simply came off Heaton later to work that service.
  12. I

    ECML major disruption | 91107 fails at Knebworth (25/04)

    Sounds like you did actually travel but were delayed? In that case Trainpal are right because you are not entitled to a refund. You may be entitled to Delay Repay compensation, which is claimed from the operator of the train you were delayed on.
  13. I

    Trivia: Northern’s shortest end-to-end services?

    Heres another that matches it: 2R93 0712 Doncaster to Adwick, again with one intermediate stop (Bentley), 7 minutes.
  14. I

    "Object caught on the overhead wires"

    Of course these kinds of incidents typically occur in high winds, so when an item is caught by the catenary wire or a dropper for instance, there can be a significant risk that when the wind speed reduces the item ceases to be caught by the wind, swings down and does impact the contact wire.
  15. I

    Weaver Network colours appearing on Trans Pennine route

    Just someone being London (Overground) centric.
  16. I

    Lumo Services through Darlington

    Given the nature of the service and its calling patterns its not that unusual to find Lumo services running early. Holding an on time train calling at Darlington for a non stop train running early, which then delays the train calling at the station which was otherwise on time starts to get a bit...
  17. I

    (08/03/26) West Hampstead - Staff Member Asleep before station opening

    Safety Critical is defined in The Railways and Other Guided Transport Systems (Safety) Regulations 2006 which gives the following definition of Safety Critical (and then defines Safety Critical Work as doing these things. https://www.legislation.gov.uk/uksi/2006/599/part/4
  18. I

    Trivia: Which station has the latest first train or earliest last train?

    On a slightly different note, I would have thought if you wanted the station with the worst combination then Brigg must be in with a shout - first train at 11:04, last train at 13:53.
  19. I

    Fatal Accident at Ickenham station (28/03/2025)

    The stand out issue for me about this report is the fact it adds to a long list of reports regarding similar incidents involving LUL and TfL. While explanations can always be found for specific cases, the sheer number of these compared to the mainline railway gives a strong indication that there...
  20. I

    [FI] The demise of open rail data in Finland

    I suppose if you really wanted to resolve that risk it would be time for a full recast of the timetable...

Top