The Balgray station project is scheduled to be completed by October. Engineering management were unsure as yet as to whether Scotrail would stop trains from then or it would be delayed to the timetable change.
As the gentleman told me at the end of last year the above issues needed ironed out before new trains could be ordered. I was inquiring as to whether this had moved on since December and the 5 car sets had been cleared.
With reference to that mentioned above the proposed depot to the south of...
It was the 5 car suburban units that were giving concern to Transport Scotland and their potential clearance issues. As I was told a while back it had to be proved they would fit all platforms and locations.
Did the study of the 6 car verses 5 longer car vehicles come to a conclusion. The main issue I believe was the centre and end throw of the longer vehicles on platforms particularly at the platform ends, turnouts and the kinematic envelope between passing trains and lineside structures. I think...
I would imagine when Birmingham to Old Oak/Euston services get up and running and the public find out how wonderful HS2 is the pressure will be on to get it to Manchester and beyond. The capacity problems from Handsacre to Preston aren't going away and will still need delt with.
Thank you for the information. I wasn't aware that there had been a 7bn annual cap given to the project. It makes sense that they should progress the central section and have something to show for their efforts as soon as possible. Getting passengers on the trains will change everything although...
A quick look on Google Earth shows that the construction compounds north of Delta Junction to Handsacre, bar those mentioned above, appear to have been abandoned some time ago. Could it be that some contracts have been delayed to meet treasury demands. Have there been any signs of a slowing of...
The centre section of the train shed roof over new platforms 2 and 3 still requires attention. Will they be erecting the scaffolding before this week ends I wonder.
At Huddersfield is there a single track bridge span still to go in over John William's St for the platform 6 turn back for the Leeds services. I've yet to catch it on any of the terrific pictures and videos posted by our intrepid enthusiasts who are recording this engineering feat for posterity.
I notice from the latest Sarah Bell YouTube vid that the new alignment of Platform 2 curves in a little at the Manchester end I presume the former Platform 4 will do likewise when trimmed back allowing access to the new platforms on the north side. Is the train shed getting extended at the Leeds...
There's a shot of Flying Scotsman and it's footplate crew on Dulnain bridge at the head of steel and the crew standing in front of the loco shortly before it's return to Aviemore on that fateful day on the Strathspey Railway unofficial Facebook site.
I was talking to one of the NR engineers recently and he was saying that the track under the Clarkson Road bridge was to be lowered by 200mm to gain clearance.