• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. F

    £33.4 million for next batch of ticket gates

    So the redevelopment plans for Witham have been announced including ticket gates both sides https://www.greateranglia.co.uk/about-us/news-desk/news-articles/witham-customers-set-benefit-station-redevelopment "Witham customers are set to benefit from a major redevelopment of the station. The...
  2. F

    Transpennine Route Upgrade and Electrification updates

    Thanks for that. Well that will a busy month!
  3. F

    Transpennine Route Upgrade and Electrification updates

    Another OntrackwithTim YouTube video released this morning. As well as showing the completed Calder Road and Colne Bridge Road layouts from the air, it has a complete drone fly past from the start of the Baker Viaduct, over the new grade separation structure to the Calder Road bridge. Do we...
  4. F

    Transpennine Route Upgrade and Electrification updates

    Another YouTube video showing the demolition in progress of both the old Calder Road and the Colne Bridge road bridges from OntrackwithTim from Saturday. Once again with informative comments underneath. Also a video from Sarah Bell showing the final parapet works on the new Colne Bridge Road...
  5. F

    Transpennine Route Upgrade and Electrification updates

    Yes, we have been spoiled as to how quickly a video recording of work carried out has regularly appeared on YouTube. I am sometimes amazed at the effort to edit, produce and then upload a video done in less than 24 hours, so a few days is quite understandable sometimes. I appreciate it anyway...
  6. F

    Transpennine Route Upgrade and Electrification updates

    The latest On Track with Tim video on YouTube shows the surfacing in progress on the A62 bridge plus a video of a drive over the realignment. Video also shows progress at Huddersfield station with work on the new subway and roof.
  7. F

    Transpennine Route Upgrade and Electrification updates

    Apologies to those that can't access this, but Network Rail have posted a video on Facebook showing that the last girders of the Baker viaduct over the river have been lifted into place. It's part of a general promotional video for the Transpennine Route Upgrade programme, so nothing else is new...
  8. F

    £33.4 million for next batch of ticket gates

    There were plans to build new entrance building and ticket office on the car park, allowing the current ticket office on the footbridge entrance to be removed and make space for a gate line. I can't see how there's space unless they do that.
  9. F

    Cambridge South new station opening

    Long time since I was called speedy!
  10. F

    Cambridge South new station opening

    First YouTube video from this morning has been uploaded
  11. F

    Transpennine Route Upgrade and Electrification updates

    The research was in the context of bus services, but also applies to high frequency train services. Of course some routes don't get that level of frequency because of demand. It's more the human perception of 'turn up and go'.
  12. F

    Transpennine Route Upgrade and Electrification updates

    TfL research shows that at 12 minute frequency (5 services an hour) people perceive a service as truly 'turn up and go'. In other words that don't worry about any timetable and simply rely on the service.
  13. F

    East-West Rail (EWR): Consultation updates [not speculation]

    There's also a story in the construction trade press about running the delivery packages in parallel to reduce overall costs and risks. https://www.constructionenquirer.com/2026/04/14/east-west-rail-reset-plan-to-speed-up-construction/
  14. F

    Redevelopment Plans for Liverpool Street - Development Policy Going Backwards

    Because the listed bit isn't being touched. They are redeveloping the faux Victorian 1990's built bit, that just looks Victorian.
  15. F

    Redevelopment Plans for Liverpool Street - Development Policy Going Backwards

    Well they have planning permission now and since the Chancellor did a photo op on the concourse about the development, there's no way it's going to be called in. We can but hope the lighting design is a good one.
  16. F

    Redevelopment Plans for Liverpool Street - Development Policy Going Backwards

    I think that you will find it's one L shaped block, with the main entrance where the McDonald's building currently is. The two existing entrance squares will be covered by the brick effect arches and the concourse will have fake steel arches to largely match the 1990's arches/canopy. I assume...
  17. F

    Expanded stations

    I would say Stratford is the obvious answer. I remember using it in the 1980's when practically only the only traffic was interchange between the Central line and the Shenfield line. Now a massive station.
  18. F

    Greater Anglia Class 755s (Regional Trains)

    Well as I get off at Colchester, I would buy before boarding if I wanted a drink or as a cheapskate, wait until I got home!
  19. F

    Greater Anglia Class 755s (Regional Trains)

    Oh yes, always worth walking to the first unit ( or first two cars of a 745). I am too old to stand to Colchester now
  20. F

    Greater Anglia Class 755s (Regional Trains)

    Thanks. It seemed the logical explanation for 11 cars. Of course if a /3 isn't available it means a short formed 8 car formation, as I have personally experienced in the past. That was cosy from the Street

Top