• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    It’s always amusing how often the phrase “loss-making branch line” crops up, especially when people refer to the supposed “basket case” that Okehampton was meant to be (and no, let’s not reopen the debate about whether Okehampton was a ‘proper’ reopening). The reality is that ground...
  2. X

    Former Intercity CrossCountry routing, rolling stock, stopping pattern variations

    Subsidence on the Cudworth route was rectified with significant investment but closed shortly after to reduce InterCity sector costs.
  3. X

    Former Intercity CrossCountry routing, rolling stock, stopping pattern variations

    It was one of several closures driven by accountants aiming to make InterCity profitable as costs for the route were allocated to that sector. The subsidence excuse was convenient and had been resolved recently through an investment programme involving some resignalling. Today the route would...
  4. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    I agree there will be trips to/from Okehampton that were previously to/from Tiverton Parkway (and Exeter too). However, given that Tiverton Parkway usage is 33% above its pre-Covid (and Okehampton reopening) peak, any significant abstraction would be difficult to prove.
  5. X

    Class 175s to GWR

    I hope so! Passengers struggled to board a packed 2-car 150 departing Marsh Barton at 1105 today.
  6. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    ? 1764450360 Or how inefficient in terms of capacity and journey time roads are in urban areas.
  7. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    And Vehicle Excise Durty is £8bn per year. Good maths, yes the average would be about £50m per mile - it’s the current industry benchmark. 1764445542 Correct but that doesn’t change the facts as stated. 1764445544 Correct but that doesn’t change the facts as stated.
  8. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    For those who consistently argue against rail investment on these forums, it’s worth noting that it would take approximately 100 years of fuel duty and vehicle excise receipts to pay back the cost of building the UK’s classified road network from scratch, without any contribution to maintenance...
  9. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    Only 70 spaces at Okehampton—a new station will open next year to service this market—but the lack of spaces at the existing station has not stopped the reopening being an overwhelming success. Many customers do not have access to a car and walk to the station. One remark about the location of...
  10. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    You could say that location or contours aren’t that great for Okehampton.
  11. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    I’m not sure there’s any operation on the whole network that would return a profit if all NR costs were appropriately allocated. There were very few ‘profitable’ operations even before the direct NR grants were introduced and most of those were only because the track access charge for a mile...
  12. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    It’s a public service (like NHS, schools, police, MoJ) and won’t directly recover the capital cost. Neither is it the basket case many predicted.
  13. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    There‘s a DfT report in the public domain, written by Systra I recall. Operating costs are covered which is better than many people anticipated.
  14. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    Sounds just like the Okehampton ‘subsidy’ predictions that haven’t materialised. As for journey times, it would be considerably quicker than the current peak-time bus service (see earlier posts) and probably 10-20 mins faster than an Express bus if introduced. 1763495634 Yes, takes far too...
  15. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    £11bn (38% of GDP) in 1963 and £1.3trn in 2024 (44%). Prices have increased by 20.5 times over the same period and (after adjusting for inflation) the economy is c 4.6 times the size in 1963 today. The population has also increased by c 30%. 1763494173 Indeed, the DCO for Portishead was...
  16. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    Welfare spending was 19% of total government spending in 1960 rising steadily to 34% in 2015. From 2020 (post-pandemic) it’s c 25% - not a welfare cash reduction but a reflection of the increased total spending.
  17. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    I was referring to the distance. I’m sure everyone appreciates that no two reinstatements will be the exactly same.
  18. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    Govt funding of the railway is 0.93% of total government spending today and was 1.3% in 1963. Good value I’d say considering the tax receipts from railway operations, never mind other economic activity (and tax receipts) enabled by the railway.
  19. X

    Tavistock - Bere Alston Feasibility Study in jeopardy. But what could be done if the money was available?

    The 3 miles Pill to Portishead is hardly existing infrastructure. Not materially different than the 5 miles from Bere Alston to Tavistock in fact.

Top