• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Rail Freight Flows and News UK

EastWest

Member
Joined
25 Jan 2024
Messages
18
Location
Cheltenham
The photo of Immingham Sorting Sidings states they have been “sold and now owned by ABP”. Does anybody know if this is for rail use, or redevelopment?

On an entirely different subject, there was an unusual MoD working this week : Kineton - Fairwater Yard -Mossend Euroterminal - Kineton (presumably loaded Fairwater to Mossend). Does anybody know what this was conveying, and where the load originated and was destined for?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

matt99001

Member
Joined
19 May 2026
Messages
33
Location
bristol
Yes - I'm told that they will be (temporarily?) taking over the flow in October to enable GBRf
to free up resources for RHTT work.
Yep, starting on Monday, looks like its back to their previously scheduled STP a year ago. With GBRf running this usual schedule too.

I assume its a gradual phasing out for GBRf this RHTT until March?
 
Last edited:

JKF

Established Member
Joined
29 May 2019
Messages
1,313
Paths in for DB cargo for Portbury steel trains from Monday:


These run earlier than the GBRF ones did, similar to when the service started.

Last GBRF one ran on 8th September, there’s often quite a gap between batches of services (often due to when boats arrive) so possible the DB services won’t run immediately.

DB route learners ran Tuesday-Thursday last week. If anyone knows what ran on Wednesday 16th (0Z56) please let me know as I’ve asked twice in the TOPS request thread! Thanks.
 

marty56110

Member
Joined
16 Nov 2019
Messages
52
Location
North East
Paths in for DB cargo for Portbury steel trains from Monday:


These run earlier than the GBRF ones did, similar to when the service started.

Last GBRF one ran on 8th September, there’s often quite a gap between batches of services (often due to when boats arrive) so possible the DB services won’t run immediately.

DB route learners ran Tuesday-Thursday last week. If anyone knows what ran on Wednesday 16th (0Z56) please let me know as I’ve asked twice in the TOPS request thread! Thanks.
GBRf service is booked to run Wednesday to Friday this week too.
 

JKF

Established Member
Joined
29 May 2019
Messages
1,313
GBRf service is booked to run Wednesday to Friday this week too.
DB train ran this morning with 66185. The DB service runs a bit early for me to see it, although was about an hour late on the return leg so I was able to pop down into the gorge for it.

I preferred it when DB had the contract and they ran two trains a day, crossing paths at Ashton Junction at lunchtime, and on some occasions you’d get a RHTT working around the same time too.

GBRF trains are in the timetable today but not running. There have been days previously where both company’s trains ran on the same day, which I think is when the DB early train first appeared, to fit around the late morning path GBRf had started using.
 
Joined
20 May 2013
Messages
236
The train arrived as 6G54 (22:45 WO) from Liverpool EMR at Alexandra Docks, and returned as 6F56 17:01 Handsworth to Liverpool EMR, with 24 wagons.
...
Shunting appears to be quite complicated here, with the train having to reverse into Queen's head sidings to run round before splitting the train and propelling each portion in turn into the EMR siding for loading. The Trackmaps book shows that there was previously another rail-connected scrapyard for Sims Metals on the opposite side of the line to EMR, the disused remains of which can be seen in the photo of the route learner. Looking at old photos of the Handsworth scrap trains, I don't think any services have run since October 2015.

Have trains always had to be cut into two before being shunted into Coopers Metals? From aerial photos, it looks like there are 3 sidings at the location?

Weren't Queen's Head sidings formerly a Cement terminal before being a scrap loading site?
 

172007

Member
Joined
2 Jan 2021
Messages
1,161
Location
West Mids
Have trains always had to be cut into two before being shunted into Coopers Metals? From aerial photos, it looks like there are 3 sidings at the location?

Weren't Queen's Head sidings formerly a Cement terminal before being a scrap loading site?
Yes, trains previously were cut into two for shunting. And reversed out to go towardd Snow hill which caused delays to passenger services often.
Yes cement works were previously located on Queens Head sdgs.

Scrap metal out of Handsworth is also scheuled to run this coming week 26th October.

Thursday is Handsworth to Alexandra Dock on that day only

https://www.realtimetrains.co.uk/service/gb-nr:H01222/2026-10-01/detailed

Friday

Handsworth to Worcester Firdays 2/10/26 to 11/12/26
Nothing as yet as to activity after worcester.

https://www.realtimetrains.co.uk/service/gb-nr:H01223/2026-10-02/detailed

Both the above are set as "Petroleum Products" so i immagine there is some tinkering to come in Trust.
 

172007

Member
Joined
2 Jan 2021
Messages
1,161
Location
West Mids
A new 6V45 Brierley Hill-Cardiff train has also appeared: https://www.realtimetrains.co.uk/service/gb-nr:H01224/2026-10-05/detailed. Unsure if this is linked to the above or something separate.
And also on the 1st and 2nd Oct but no inbounds.

Brierly Hill has occasionaly had aggregate deliveries over the years, mostly by what was then Freightliner Heavy Haul. Co-incedently with scrap out of Handaworth i think the last time that ran was sometime 2012-2017.
 
Last edited:

SomeTrainboy

Member
Joined
30 Aug 2024
Messages
46
Location
NE Lincs
The photo of Immingham Sorting Sidings states they have been “sold and now owned by ABP”. Does anybody know if this is for rail use, or redevelopment?
I believe they're building a container terminal near to (what was) the engine sheds, although unfortunately, I don't think they'll be using rail..
 

JKF

Established Member
Joined
29 May 2019
Messages
1,313
I would expect the tunnel heads to go via sea given they can be huge, but tunnel segments by rail. The sea route is rather long!

Would this run on east-west rail? Might suit bimode haulage given the distance running under wires.
 

waverley47

Member
Joined
17 Apr 2015
Messages
845
Would this run on east-west rail?

Either way, it needs to be facing north at Ipswich, but they're using Harwich yard to spin various workings around and shove them out of the way for the time being.

Sending it via E-W and the Marston Vale, thence Corby, you're facing the wrong way at Manton Jn to head back down towards Peterborough. Sending it via Leicester would mean threading it through a constrained section of track, and either way you're hitting capacity issues at Ely and Haughley Junctions.

Sending it via London you run into capacity issues on the GWML and the GEML, and threading it through North London sounds like a pain. Either way it will be interesting to see it, and hopefully we get some good daytime shots of it.
 

JKF

Established Member
Joined
29 May 2019
Messages
1,313
Sending it via London you run into capacity issues on the GWML and the GEML, and threading it through North London sounds like a pain. Either way it will be interesting to see it, and hopefully we get some good daytime shots of it.
There must be some capacity on the GWML as far as Didcot as they used to have all that coal traffic running on the exact route. Perhaps they can quadruple some of the GWML bottle neck east of Swindon and put the expense on the Sizewell tab where it would just be a rounding error on the overall cost?
 

Top