28th November this year gives us Paddington Closed, Kings Cross Closed and GEML terminating at Shenfield limited service out of Liverpool Street only on the West Anglia Lines.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,279
From the sounds of it, Chiltern's pulling trains from the Amersham line to strengthen Oxford services during the Paddington closure; is this the first time this has (will have) happened?

(Sorry if there's a different thread on GWR engineering works rather than specifically EWR diversions.)

Saturday 28th November 2026:

An amended timetable will be in operation, in respect of the following:

Paddington - Oxford (GWR) route closure.
An enhanced Chiltern Railways service will operate between Marylebone - High Wycombe - Bicester Village - Oxford, with lengthened and some additional trains.

In connection with the Paddington - Oxford route closure, no Chiltern Railways train services will operate between Marylebone and Aylesbury Vale Parkway (via Amersham). Rail replacement buses will operate as follows, connecting with London Underground Metropolitan Line services to/from Baker Street at Amersham.

Amersham - Great Missenden - Wendover - Stoke Mandeville - Aylesbury - Aylesbury Vale Parkway.
RTT had one seven-car Oxford to Marylebone service today, which I don't know if it actually ran or was a case of not deleting the original unit after a set swap; is that the maximum length?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,657
From the sounds of it, Chiltern's pulling trains from the Amersham line to strengthen Oxford services during the Paddington closure; is this the first time this has (will have) happened?

(Sorry if there's a different thread on GWR engineering works rather than specifically EWR diversions.)
No. Chiltern have been known to ask NR to do work on the Met side if the WCML is closed to do this.
 

800002

Member
Joined
19 Jun 2019
Messages
1,096
From the sounds of it, Chiltern's pulling trains from the Amersham line to strengthen Oxford services during the Paddington closure; is this the first time this has (will have) happened?
No. But one of the only times where there isnt any planned HS2 or 4LM work on the Met LUL line.

RTT had one seven-car Oxford to Marylebone service today, which I don't know if it actually ran or was a case of not deleting the original unit after a set swap; is that the maximum length?
It's a mis-form, should have been a pair of 4 cars. (8, total on 1Y10 - 0638 OXF - MYB).

No. Chiltern have been known to ask NR to do work on the Met side if the WCML is closed to do this.
Indeed, little more HS2 work left at this point in time I think
 

sammyg901

Member
Joined
24 Mar 2009
Messages
437
Chiltern often pulls some or all Met line trains to support mainline either for Euston closures or Wembley events, not particularly unusual
 

800002

Member
Joined
19 Jun 2019
Messages
1,096
Chiltern often pulls some or all Met line trains to support mainline either for Euston closures or Wembley events, not particularly unusual
However, previously, more often than not they were unable to run on the Met line due to possessions.
Wembley events tend to see an early shut down in the met in the mid- evening at weekends.
 

CR165022

Established Member
Joined
12 Nov 2019
Messages
1,376
Location
Buckinghamshire
RTT had one seven-car Oxford to Marylebone service today, which I don't know if it actually ran or was a case of not deleting the original unit after a set swap; is that the maximum length?
That's booked, and is actually booked as an 8 but was short formed today. Although that service has to use platform 3 at Oxford, the bay platforms can only hold 6 carriages.
Chiltern often pulls some or all Met line trains to support mainline either for Euston closures or Wembley events, not particularly unusual
As someone who lives on that line, I can say that they don't hesitate to completely pull the whole met line service at any opportunity!
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,118
Location
"Marston Vale mafia"
No. But one of the only times where there isnt any planned HS2 or 4LM work on the Met LUL line.

They do it all the time when there isn't engineering work. Any large Wembley event. It's sort of greater good, but it's also a bit naughty. I suppose comparable with Merseyrail cutting service on some routes to provide enhanced Grand National capacity.
 

800002

Member
Joined
19 Jun 2019
Messages
1,096
They do it all the time when there isn't engineering work. Any large Wembley event. It's sort of greater good, but it's also a bit naughty. I suppose comparable with Merseyrail cutting service on some routes to provide enhanced Grand National capacity.
It can't be naughty, as you say, of its agreed.
It's either supported or not supported by the purseholder.
If they do it, it's agreed.

== Doublepost prevention - post automatically merged: ==

As someone who lives on that line, I can say that they don't hesitate to completely pull the whole met line service at any opportunity!
Do you have to use the replacement busses?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,118
Location
"Marston Vale mafia"
It can't be naughty, as you say, of its agreed.
It's either supported or not supported by the purseholder.

It's naughty in that it leaves people without a proper service.

Do you have to use the replacement busses?

Those not wanting to use them and going actually to Aylesbury can use the service via Wycombe, but it is slow!
 

800002

Member
Joined
19 Jun 2019
Messages
1,096
Those not wanting to use them and going actually to Aylesbury can use the service via Wycombe, but it is slow!
Then they still have a train service (albeit, just not a fast).
I don't immediately see what the issue is.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,786
Location
Newport
They do it all the time when there isn't engineering work. Any large Wembley event. It's sort of greater good, but it's also a bit naughty. I suppose comparable with Merseyrail cutting service on some routes to provide enhanced Grand National capacity.
GWR (almost back on topic!) cuts services to resource special events such as Glastonbury.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,340
Location
Somerset
It's naughty in that it leaves people without a proper service.
But presumably still with a service that is a darn sight better than what is deemed sufficient for many other populous parts of the country (ie no trains at all). OK, I’m making the assumption that an Amersham - Aylesbury shuttle is maintained…
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,681
Location
SW London
They do it all the time when there isn't engineering work. Any large Wembley event. It's sort of greater good, but it's also a bit naughty. I suppose comparable with Merseyrail cutting service on some routes to provide enhanced Grand National capacity.
Or Shepperton services diverted via Twickenham instead of Kingston whenever the Rugby is on. OK, greater goid and all that, but thete is never any advance notice as there would be for maintenance work.
 

800002

Member
Joined
19 Jun 2019
Messages
1,096
Or Shepperton services diverted via Twickenham instead of Kingston whenever the Rugby is on. OK, greater goid and all that, but thete is never any advance notice as there would be for maintenance work.
Apart from when the rugby game is announced.

Some operators can be fairly poor at communicating this information, however.
 

servicedelayed

New Member
Joined
17 Jun 2018
Messages
2
Location
Hertfordshire
I wonder why GWR can't stop at MKC during diversions to allow passengers to board or alight here. It could operate an Avanti style service by having pick-up only and set down only basis. Is there a reason why this will not happen? It would make sense given it will take around 10 minutes for the changeover from electric to diesel and vice versa.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,288
I wonder why GWR can't stop at MKC during diversions to allow passengers to board or alight here. It could operate an Avanti style service by having pick-up only and set down only basis. Is there a reason why this will not happen? It would make sense given it will take around 10 minutes for the changeover from electric to diesel and vice versa.
There aren't any fares set for the route for a start, but they also just don't need to make open calls at Milton Keynes as the purpose of stopping there is operational, and the purpose of the train running is to get people from Swindon and points further west through to London. If passengers were carried from Milton Keynes it reduces capacity for other passengers.

GWR didn't have open calls at Banbury in previous diversionary situations, and indeed aren't having passenger calls at Oxford on these trains either.

Arguably, it would just confuse matters, for very little gain.
 
Last edited:

800002

Member
Joined
19 Jun 2019
Messages
1,096
It would make sense given it will take around 10 minutes for the changeover from electric to diesel and vice versa.
It'll take about 30 seconds for the changeover to occur, if indeed running of the OHLE is permitted. I wouldn't be surprised if it ran diesel into London.
What is required from the dwell in Milton Keynes is for the driver and any other required aide to change ends.
Im not sure if GWR need a driver in the cab all the way from Oxford to Euston or if they're being route conducted all the way. (I suspect the latter).
 

Ian Hardy

Member
Joined
18 Nov 2009
Messages
451
Brentford to Waterloo would be somewhat quicker than 29 minutes on the sleeper, as it wouldn't have to make eight intermediate stops.

Richmond to Waterloo is a similar distance and takes only twenty minutes, with two stops.

And if it was going to Waterloo it wouldn't have to go via Brentford anyway - the route via Twickenham is 2km shorter
It is likely that the UP service would go via the Hounslow loop as it would catch up the 2U04 0458 Staines to London Waterloo (an all stations stopper) between St Margarets and Barnes: https://www.realtimetrains.co.uk/service/gb-nr:L84485/2026-11-28/detailed and have to follow it until the 4 track section from Barnes onwards. Going via the Hounslow loop, there are no other UP services at that time in the morning. The 2U04 uses the UP Fast from Barnes so going via the Hounslow loop would mean that the sleeper could run on the UP Slow with no conflicts.
When the SWML is closed through Wimbledon, 2 diverted UP services an hour go via the Hounslow loop and not via Richmond, but in most cases all the DN services go via Richmond, probably due to conflicts at Barnes and Feltham Junctions to going via the Hounslow loop would cause.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,657
It'll take about 30 seconds for the changeover to occur, if indeed running of the OHLE is permitted. I wouldn't be surprised if it ran diesel into London.
What is required from the dwell in Milton Keynes is for the driver and any other required aide to change ends.
Im not sure if GWR need a driver in the cab all the way from Oxford to Euston or if they're being route conducted all the way. (I suspect the latter).
Route conducted from Oxford.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,744
Location
West of Andover
I wonder why GWR can't stop at MKC during diversions to allow passengers to board or alight here. It could operate an Avanti style service by having pick-up only and set down only basis. Is there a reason why this will not happen? It would make sense given it will take around 10 minutes for the changeover from electric to diesel and vice versa.
Also by not making Milton Keynes open calls it means the trains can go when ready, rather than having to wait for the correct departure time
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,893
Location
Fenny Stratford
Why would GWR even consider this? Milton Keynes is not on their network and they never run trains there, except on the very rare days of diversions such as these!
because I live there? Do they not know who i am ;)

You are quite correct there is no real gain for them and they would end up using the capacity intended for travellers to the west on a 45 minute journey to MK that is already served by 4/5 trains an hour. Would be nice to get a service train along E-W mind!
 

servicedelayed

New Member
Joined
17 Jun 2018
Messages
2
Location
Hertfordshire
Appreciate some of the replies.

I was looking at it in terms of onward connections from the West via MKC without the need of going into London and back out again but I'd imagine it would be complicated given it is not normally served by GWR.
 

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,507
Why would GWR even consider this? Milton Keynes is not on their network and they never run trains there, except on the very rare days of diversions such as these!
You could say the same about the weekend LNER diversions via Carlisle but most still call there AFAIK .
 

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,279
You could say the same about the weekend LNER diversions via Carlisle but most still call there AFAIK .
I was going to suggest that case was making up for displaced services, but as far as I can tell, the LNER services are on top of normal Tyne Valley and Euston / Manchester Airport – Edinburgh services anyway.
 

Top