GWR Diversions over East West Rail - Nov 2026

Mike99

Member
Joined
4 Mar 2011
Messages
853
Location
G E M L
28th November this year gives us Paddington Closed, Kings Cross Closed and GEML terminating at Shenfield limited service out of Liverpool Street only on the West Anglia Lines.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,267
From the sounds of it, Chiltern's pulling trains from the Amersham line to strengthen Oxford services during the Paddington closure; is this the first time this has (will have) happened?

(Sorry if there's a different thread on GWR engineering works rather than specifically EWR diversions.)

Saturday 28th November 2026:

An amended timetable will be in operation, in respect of the following:

Paddington - Oxford (GWR) route closure.
An enhanced Chiltern Railways service will operate between Marylebone - High Wycombe - Bicester Village - Oxford, with lengthened and some additional trains.

In connection with the Paddington - Oxford route closure, no Chiltern Railways train services will operate between Marylebone and Aylesbury Vale Parkway (via Amersham). Rail replacement buses will operate as follows, connecting with London Underground Metropolitan Line services to/from Baker Street at Amersham.

Amersham - Great Missenden - Wendover - Stoke Mandeville - Aylesbury - Aylesbury Vale Parkway.
RTT had one seven-car Oxford to Marylebone service today, which I don't know if it actually ran or was a case of not deleting the original unit after a set swap; is that the maximum length?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,641
From the sounds of it, Chiltern's pulling trains from the Amersham line to strengthen Oxford services during the Paddington closure; is this the first time this has (will have) happened?

(Sorry if there's a different thread on GWR engineering works rather than specifically EWR diversions.)
No. Chiltern have been known to ask NR to do work on the Met side if the WCML is closed to do this.
 

800002

Member
Joined
19 Jun 2019
Messages
1,086
From the sounds of it, Chiltern's pulling trains from the Amersham line to strengthen Oxford services during the Paddington closure; is this the first time this has (will have) happened?
No. But one of the only times where there isnt any planned HS2 or 4LM work on the Met LUL line.

RTT had one seven-car Oxford to Marylebone service today, which I don't know if it actually ran or was a case of not deleting the original unit after a set swap; is that the maximum length?
It's a mis-form, should have been a pair of 4 cars. (8, total on 1Y10 - 0638 OXF - MYB).

No. Chiltern have been known to ask NR to do work on the Met side if the WCML is closed to do this.
Indeed, little more HS2 work left at this point in time I think
 

sammyg901

Member
Joined
24 Mar 2009
Messages
436
Chiltern often pulls some or all Met line trains to support mainline either for Euston closures or Wembley events, not particularly unusual
 

800002

Member
Joined
19 Jun 2019
Messages
1,086
Chiltern often pulls some or all Met line trains to support mainline either for Euston closures or Wembley events, not particularly unusual
However, previously, more often than not they were unable to run on the Met line due to possessions.
Wembley events tend to see an early shut down in the met in the mid- evening at weekends.
 

CR165022

Established Member
Joined
12 Nov 2019
Messages
1,361
Location
Buckinghamshire
RTT had one seven-car Oxford to Marylebone service today, which I don't know if it actually ran or was a case of not deleting the original unit after a set swap; is that the maximum length?
That's booked, and is actually booked as an 8 but was short formed today. Although that service has to use platform 3 at Oxford, the bay platforms can only hold 6 carriages.
Chiltern often pulls some or all Met line trains to support mainline either for Euston closures or Wembley events, not particularly unusual
As someone who lives on that line, I can say that they don't hesitate to completely pull the whole met line service at any opportunity!
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,026
Location
"Marston Vale mafia"
No. But one of the only times where there isnt any planned HS2 or 4LM work on the Met LUL line.

They do it all the time when there isn't engineering work. Any large Wembley event. It's sort of greater good, but it's also a bit naughty. I suppose comparable with Merseyrail cutting service on some routes to provide enhanced Grand National capacity.
 

800002

Member
Joined
19 Jun 2019
Messages
1,086
They do it all the time when there isn't engineering work. Any large Wembley event. It's sort of greater good, but it's also a bit naughty. I suppose comparable with Merseyrail cutting service on some routes to provide enhanced Grand National capacity.
It can't be naughty, as you say, of its agreed.
It's either supported or not supported by the purseholder.
If they do it, it's agreed.

== Doublepost prevention - post automatically merged: ==

As someone who lives on that line, I can say that they don't hesitate to completely pull the whole met line service at any opportunity!
Do you have to use the replacement busses?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,026
Location
"Marston Vale mafia"
It can't be naughty, as you say, of its agreed.
It's either supported or not supported by the purseholder.

It's naughty in that it leaves people without a proper service.

Do you have to use the replacement busses?

Those not wanting to use them and going actually to Aylesbury can use the service via Wycombe, but it is slow!
 

800002

Member
Joined
19 Jun 2019
Messages
1,086
Those not wanting to use them and going actually to Aylesbury can use the service via Wycombe, but it is slow!
Then they still have a train service (albeit, just not a fast).
I don't immediately see what the issue is.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,754
Location
Newport
They do it all the time when there isn't engineering work. Any large Wembley event. It's sort of greater good, but it's also a bit naughty. I suppose comparable with Merseyrail cutting service on some routes to provide enhanced Grand National capacity.
GWR (almost back on topic!) cuts services to resource special events such as Glastonbury.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,311
Location
Somerset
It's naughty in that it leaves people without a proper service.
But presumably still with a service that is a darn sight better than what is deemed sufficient for many other populous parts of the country (ie no trains at all). OK, I’m making the assumption that an Amersham - Aylesbury shuttle is maintained…
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,664
Location
SW London
They do it all the time when there isn't engineering work. Any large Wembley event. It's sort of greater good, but it's also a bit naughty. I suppose comparable with Merseyrail cutting service on some routes to provide enhanced Grand National capacity.
Or Shepperton services diverted via Twickenham instead of Kingston whenever the Rugby is on. OK, greater goid and all that, but thete is never any advance notice as there would be for maintenance work.
 

800002

Member
Joined
19 Jun 2019
Messages
1,086
Or Shepperton services diverted via Twickenham instead of Kingston whenever the Rugby is on. OK, greater goid and all that, but thete is never any advance notice as there would be for maintenance work.
Apart from when the rugby game is announced.

Some operators can be fairly poor at communicating this information, however.
 