Paddington-Reading blocked due to OLE isolation and lineside fire (5/9)

Status
Not open for further replies.

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,276
The supply can be configured to feed from somewhere else if a particular supply is

Presuming it's here: https://www.bing.com/maps/search?style=a&q=kensal+green&cp=51.526086~-0.226039&lvl=19.4
Yes, that’s exactly what I was trying to describe, using Google satellite view I was able to find the exact arrangement where they change between single and double track cantilevers. But I’m not so sure there are redundant routes between the ATFS and the eventual trackside connections, they may be in a completely different area, eg as in the 6 taller devices in the background of the picture in post#4.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,599
There seems to be remarkably little disruption today considering the impact yesterday and how dramatic those photos look.
 

John Webb

Established Member
Joined
5 Jun 2010
Messages
3,774
Location
St Albans
My initial thoughts on seeing that were, but it was only a grass fire. However after a quick google grass fires can get to between 400-800c so now understand why such a mess. As others have said good job getting a service running.
While the London Underground has used cables with low smoke emission and more resistant to ignition for some while, I suspect this is not true of the surface lines, so their cables probably are more susceptible to fire.
 

MarlowDonkey

Established Member
Joined
4 Apr 2013
Messages
1,865
There seems to be remarkably little disruption today considering the impact yesterday and how dramatic those photos look.
It's a less intensive service on a Sunday, but checking Maidenhead to London, both Elizabeth and semi fast GWR services appear to be running normally.
 
Joined
5 Aug 2015
Messages
911
Location
Norfolk
The compound where the chaps in orange are standing is the switching area for the main Kensal Green autotransformer feeder station (ATFS) for the east end of the GWML. I wonder how badly the control and communications cabling has been damaged. Also, do they use trackside cabling to distribute the AC to the 25kV system in that area, there seems very little visible overhead?
As you can kinda see on the Google Earth 3d view, I think these cable runs likely carry all the circuits between Kensal Green substation ("A") and the point at which they connect to the OLE ("B") which is not a very long distance at all, so a very unfortunately located fire. I'd imagine at least 8 +25kV circuits (4 for the lines to Paddington, 4 for the lines going west) and maybe 2x -25kV AT feeder lines. There may also be dedicated circuits that go to Old Oak Common depot as well which is also unfortunate. The tracks immediately against the feeder station are actually the approach tracks for the XR depot. I know there is also a 50kV cable from Kensal Green to Westbourne Park substation (which only feeds the XR core tracks) which may also have been damaged depending on how Kensal Green ATFS organises its cables. This interconnector is not often used as the XR core is normally fed from the eastern end

Telecoms cables for SCADA would of course be damaged but they probably have backups for those coming from the east to the substation, so they can withstand one connection going down without losing any function.
1788699044389.png
You can also see in this cabride video what the OLE connection are looks like from the ground
1788699352615.png
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,001
Location
London
There seems to be remarkably little disruption today considering the impact yesterday and how dramatic those photos look.

Quite convenient - if you can call it that - that it led into a Sunday morning where considerably fewer unit diagrams (for both GWR and Elizabeth line) are in service, meaning the stock displacement hasn't had such a major impact other than very first trains.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,009
Location
Surrey
Not exactly a fair or true post mortem though is it...
Of course but highly unlikely we will ever get to know. Also what was the source of ignition? Potentially a overheating cable/failed joint although more likely a discarded cigarette on the adjacent canal path.
The track was closed while the fire service dealt with the fire, no diesel services ran until the very late evening, there was only about a gap of 2 hours from about 11 when diesel could run and electric couldn't.
This location is well clear of the main lines and even accepting the supposition that all these cables provide power to the OLE that wouldn't have prevented the movement of diesel powered trains along the fast lines. GWR though ran a very scant service maybe that was more to do with crew displacement but even so with an all bimode IET fleet they had the opportunity to do better. The net impact was severe overloading on SWR and Chiltern which is creating the potential for another catastrophe elsewhere. GBR has plenty to do but it would be wise if it took up some medium term challenges like how we manage and recover from such incidents.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,001
Location
London
There's still cabling damage to the two depot lines to Old Oak Common which remain unavailable - the alternative route via the E&C line is still available.

1788704042922.png
 

nctd2306

Member
Joined
2 Jan 2024
Messages
364
Location
Berkshire
I don't know if it's related but I've just seen two London bound IETs arrive at Reading on electric mode and switch to diesel before carrying on. I can't say whether or not every train has done this but maybe it's to try and reduce the amount of electric trains through the area.
 

GingerRH

Member
Joined
21 Apr 2015
Messages
185
I don't know if it's related but I've just seen two London bound IETs arrive at Reading on electric mode and switch to diesel before carrying on. I can't say whether or not every train has done this but maybe it's to try and reduce the amount of electric trains through the area.

Almost as if there’s a notice up saying diesel mode only between Reading and Pad in the late notice board
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,276
This location is well clear of the main lines and even accepting the supposition that all these cables provide power to the OLE that wouldn't have prevented the movement of diesel powered trains along the fast lines.
Someone mentioned last night that the mains were already under possession yesterday?
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,303
Location
Bath
This location is well clear of the main lines and even accepting the supposition that all these cables provide power to the OLE that wouldn't have prevented the movement of diesel powered trains along the fast lines. GWR though ran a very scant service maybe that was more to do with crew displacement but even so with an all bimode IET fleet they had the opportunity to do better. The net impact was severe overloading on SWR and Chiltern which is creating the potential for another catastrophe elsewhere. GBR has plenty to do but it would be wise if it took up some medium term challenges like how we manage and recover from such incidents.
The entire line was clearly blocked for the emergency services to respond. It isn’t that far away. There was nothing blocking the lines towards Reading at any point, and nothing towards London after around an hour. There were two stranded trains but they were in the 6 track section and easy to work round.

It is therefore clear that the lack of electricity was not the ‘single’ point of failure.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,668
Location
Nottingham
Yes, that’s exactly what I was trying to describe, using Google satellite view I was able to find the exact arrangement where they change between single and double track cantilevers. But I’m not so sure there are redundant routes between the ATFS and the eventual trackside connections, they may be in a completely different area, eg as in the 6 taller devices in the background of the picture in post#4.
I don't think there are redundant cable routes. But what I was trying to explain is that they will have alternative feeding arrangements so the OLE can be supplied from feeders elsewhere on the network, even if this feeder is completely out of use.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,009
Location
Surrey
The entire line was clearly blocked for the emergency services to respond. It isn’t that far away. There was nothing blocking the lines towards Reading at any point, and nothing towards London after around an hour. There were two stranded trains but they were in the 6 track section and easy to work round.

It is therefore clear that the lack of electricity was not the ‘single’ point of failure.
1788711758801.png
Fire was located where the Orange wavy line is the Fasts are well clear. However, with fire in and around the 25kV feeder cable troughing routes an area wide emergency isolation was required and thus all stop. Once a rail incident officer was able to ascertain how London Fire Brigade intended to deal with the fire then the Fasts could have been opened to diesel only working which they did do after several hours. Getting power back on would need a full isolation of the affected feeder circuits and they should have line switches at the structure end.

This is potentially an N-2 condition as its possible that Kensal Green Feeder Station can provide no infeed but depends if all the track feeders either side of the neutral section ran along this section which would be a bit foolish. Thus im surmising the feeds towards Paddington are available and so they are feeding upto the neutrals section from the Reading side.
 
Joined
5 Aug 2015
Messages
911
Location
Norfolk
I don't think there are redundant cable routes. But what I was trying to explain is that they will have alternative feeding arrangements so the OLE can be supplied from feeders elsewhere on the network, even if this feeder is completely out of use.
Yeah most likely Didcot ATFS extended past it's usual boundary at Maidenhead to feed as far east as you could go (does anyone know how much was switched back on?). It might theoretically be possible to pull some switches around the Westbourne Park portal to feed Paddington from the XR core but I doubt that would ever be considered, especially in the short term.
as its possible that Kensal Green Feeder Station can provide no infeed but depends if all the track feeders either side of the neutral section ran along this section which would be a bit foolish.
No way of me properly knowing this but I'd imagine all the OLE circuits for GWML, OOC depot are within that cable route apart from the interconnector to Westbourne Park
Thus im surmising the feeds towards Paddington are available and so they are feeding upto the neutrals section from the Reading side.
There's no neutral section at Kensal Green. Paddington to Maidenhead is one feeding section. There are 2 grid supplies at Kensal Green but one of them just does nothing and either fills in for the other in N-2, or can be a backup for the XR core if Pudding Mill Lane is in N-2.
1788714473948.png
1788714524636.png
 

GingerRH

Member
Joined
21 Apr 2015
Messages
185
Yeah most likely Didcot ATFS extended past it's usual boundary at Maidenhead to feed as far east as you could go (does anyone know how much was switched back on?). It might theoretically be possible to pull some switches around the Westbourne Park portal to feed Paddington from the XR core but I doubt that would ever be considered, especially in the short term.

No way of me properly knowing this but I'd imagine all the OLE circuits for GWML, OOC depot are within that cable route apart from the interconnector to Westbourne Park

There's no neutral section at Kensal Green. Paddington to Maidenhead is one feeding section. There are 2 grid supplies at Kensal Green but one of them just does nothing and either fills in for the other in N-2, or can be a backup for the XR core if Pudding Mill Lane is in N-2.
View attachment 211130
View attachment 211131

Finally some speculation from someone with actual and logical knowledge.

Foxhall is indeed feeding all the way to Paddington, hence the drivers notice to GWR drivers to drive in diesel to reduce the load on the feed. One tripping would take out everything from Paddington to Didcot.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,009
Location
Surrey
Yeah most likely Didcot ATFS extended past it's usual boundary at Maidenhead to feed as far east as you could go (does anyone know how much was switched back on?). It might theoretically be possible to pull some switches around the Westbourne Park portal to feed Paddington from the XR core but I doubt that would ever be considered, especially in the short term.

No way of me properly knowing this but I'd imagine all the OLE circuits for GWML, OOC depot are within that cable route apart from the interconnector to Westbourne Park
Given comment from @GingerRH it appears that this was the case which is rathers goes against basic electrical principle of providing diversity.
There's no neutral section at Kensal Green. Paddington to Maidenhead is one feeding section. There are 2 grid supplies at Kensal Green but one of them just does nothing and either fills in for the other in N-2, or can be a backup for the XR core if Pudding Mill Lane is in N-2.
Thanks for clarity too grounded on classic 25kV from my ECML days!
 

GingerRH

Member
Joined
21 Apr 2015
Messages
185
Given comment from @GingerRH it appears that this was the case which is rathers goes against basic electrical principle of providing diversity.

Thanks for clarity too grounded on classic 25kV from my ECML days!

It was either that or nothing unfortunately.

The fire damaged and destroyed pretty much everything you can imagine, leading to having no control.

A larger isolation section was needed to apply earthing straps to allow emergency services access.
 

The Prisoner

Member
Joined
22 Aug 2012
Messages
421
Interested as to what GWR do when the last long distance services of the day are cancelled by things like this.

For example the 1745 from Penzance didn’t run - what do they do with punters who turn up at Penzance for that service? 1745 Penzance to Paddington

Similar stories from Hereford, Cheltenham etc but they may have had other routes such as via Birmingham.

To be fair to Avanti where last trains get canned they usually sort a bus out, so what happened last night for GWR pax?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,276
The fire damaged and destroyed pretty much everything you can imagine, leading to having no control.

A larger isolation section was needed to apply earthing straps to allow emergency services access.
Well, that’s what I was cautiously thinking, but based solely on the pictures as they appeared. But NR & TOCs seem to play down the risk to infrastructure, and we get news items in the mainstream media referring to it as a ‘grass fire’.
 

marshlinker

Member
Joined
18 May 2026
Messages
171
Location
Romney Marsh
No idea what happened yesterday but there's normally a connection off the 18.15 Cross Country Service at Bristol temple Meads Mon to Sat
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,009
Location
Surrey
It was either that or nothing unfortunately
The Distribution operators and National Grid would insist on a lot more separation
The fire damaged and destroyed pretty much everything you can imagine, leading to having no control.
No control of the circuit breakers in Kensal Green FS?
A larger isolation section was needed to apply earthing straps to allow emergency services access.
So the fire cant be tackled until earths are up?
 

800301

Member
Joined
29 Dec 2022
Messages
537
Location
Essex
The entire line was clearly blocked for the emergency services to respond. It isn’t that far away. There was nothing blocking the lines towards Reading at any point, and nothing towards London after around an hour. There were two stranded trains but they were in the 6 track section and easy to work round.

It is therefore clear that the lack of electricity was not the ‘single’ point of failure.

Item 10 was blocking the mains from Dolphin Jn to Taplow, while the only stranded trains were luckily just outside Paddington and Ladbroke Grove, there were Lizzy lines trains stuck at stations after the power went out for the last time, luckily there was very limited 387 services running between Pad and Reading Yesterday due to engineering works or it would have been a different story until they had all been rescued
 

alistairlees

Established Member
Joined
29 Dec 2016
Messages
4,409
Interested as to what GWR do when the last long distance services of the day are cancelled by things like this.

For example the 1745 from Penzance didn’t run - what do they do with punters who turn up at Penzance for that service? 1745 Penzance to Paddington

Similar stories from Hereford, Cheltenham etc but they may have had other routes such as via Birmingham.

To be fair to Avanti where last trains get canned they usually sort a bus out, so what happened last night for GWR pax?
XC to Bristol TM, then GWR to Paddington arrive 01:15. At least, that's what I assume happened.
 

Cornish Pasty

Member
Joined
11 Apr 2023
Messages
37
Location
Cornwall
I was at Paddington today and every IET left running on diesel.
I went on the delayed 1155 to Penzance. We were moved from the fast lines just East of Slough ( Dolphin Junction?)returning at Twyford West.
All traffic was on those lines between those points.
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,303
Location
Bath
I went on the delayed 1155 to Penzance. We were moved from the fast lines just East of Slough ( Dolphin Junction?)returning at Twyford West.
All traffic was on those lines between those points.
This part is planned engineering work, unrelated to yesterday's fire.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,001
Location
London
The Distribution operators and National Grid would insist on a lot more separation

It is a surprisingly long section. Any tripping tends to take out Paddington - Maidenhead, as does an emergency switch off.
 
Joined
5 Aug 2015
Messages
911
Location
Norfolk
It is a surprisingly long section. Any tripping tends to take out Paddington - Maidenhead, as does an emergency switch off.
Longer feeding distances is both an advantage and an disadvantage of the AT system, neutral sections are normally considered a hindrance for all sorts of reasons, but in the case of emergency isolations you suddenly want more of them. I think in some niche cases, neutral sections have been put in purely to allow for strategic isolation.

The amount of route affected by a switch off the other side of Reading also feels problematic. Referring to the above map, everything from Maidenhead to Didcot and down to Newbury is all one feeding area.
Given comment from @GingerRH it appears that this was the case which is rathers goes against basic electrical principle of providing diversity.
Diversity of feeding doesn't ever seem to be considered at this low of a level since we're talking about at most a 200m long cable route. I think even under BR practice in a similar situation the cables would likely be grouped together as well. But BR schemes tend to put substations directly at the OLE connection site as often as possible. Equally though, the fire could equally happen within the substation which would have a similar result. I wonder if best practice might change from this, maybe having two different cable routes, but you'd have to choose which circuits get which routes: perhaps all the Down lines on one and the Ups on another meaning you could throw alt feed switches on the OLE structures to group down and ups together.
Thanks for clarity too grounded on classic 25kV from my ECML days!
The platonic ideal written in textbooks of an uninterrupted run of dual supply feeder stations and midpoint TSCs almost never happens in practice anywhere, there's always something more confusing going on. MML is the closest to consistency. Feeder stations with no neutral sections was sometimes a move made on BR era systems, sometimes but not always because they only had one grid supply incoming. That latter point is never repeated in post BR systems interestingly. For ECML: Nene, Newark, Benton and Ulgham Crossing come to mind - although the latter has 2 grid supplies, they're just in phase! (Even more strange!).

Sometimes, I've noticed, they went for the system of having two nearby feeder stations each with only one connection from a different grid site. And they operate in pairs where each can cover for the other in an N-2 situation. This especially seems to have been the way of doing things in the 1990s. So you see it in the Manchester area with Heald Green and Edgeley, and for Birmingham CrossCity with Winson Green and Galton Jnc. This kind of methodology is actually quite smart and is resilient to more situations. But it's not always going to be an option and is likely more expensive.
leading to having no control.
This is much more damming in my opinion. On older systems, ECRs operated their own pilot line networks that ran within S&T cable routes. But nowadays, and I'd assume anything GWEP follows this practice, SCADA communications are handled by the general use FTN network, so it's surprising to me that all the fibre lines to the substation were within that cable route.
 

mickey

Member
Joined
11 Mar 2010
Messages
699
Even if it was off all the way to Maidenhead, it doesn’t explain why they didn’t at any point set up a shuttle between there and Reading. There were units around Reading, and enough staff they could have used. I’m aware this is bordering on speculative discussion so will keep it very brief, but there’s a huge amount more they could do in terms of getting people moving and giving out information on alternative routes during major meltdowns, what they have is awful.

Still, despite everything credit should go to control staff (both NR and GWR) who clearly made huge efforts to get a skeleton ‘last train’ moving very late at night on several routes, including sending a 165 to serve XR stations where presumably IETs aren’t cleared to stop.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,001
Location
London
There’s still going to be disruption for the coming week to reduce the load on the OLE - as a huge section is currently being fed by Foxhall. Repairs for both the affected track and the actual power supply are extensive.

Got away with it today because it was a Sunday. A full peak service can reportedly not be supported.
 