It is a surprisingly long section. Any tripping tends to take out Paddington - Maidenhead, as does an emergency switch off.
Longer feeding distances is both an advantage and an disadvantage of the AT system, neutral sections are normally considered a hindrance for all sorts of reasons, but in the case of emergency isolations you suddenly want more of them. I think in some niche cases, neutral sections have been put in purely to allow for strategic isolation.
The amount of route affected by a switch off the other side of Reading also feels problematic. Referring to the above map, everything from Maidenhead to Didcot and down to Newbury is all one feeding area.
Given comment from
@GingerRH it appears that this was the case which is rathers goes against basic electrical principle of providing diversity.
Diversity of feeding doesn't ever seem to be considered at this low of a level since we're talking about at most a 200m long cable route. I think even under BR practice in a similar situation the cables would likely be grouped together as well. But BR schemes tend to put substations directly at the OLE connection site as often as possible. Equally though, the fire could equally happen within the substation which would have a similar result. I wonder if best practice might change from this, maybe having two different cable routes, but you'd have to choose which circuits get which routes: perhaps all the Down lines on one and the Ups on another meaning you could throw alt feed switches on the OLE structures to group down and ups together.
Thanks for clarity too grounded on classic 25kV from my ECML days!
The platonic ideal written in textbooks of an uninterrupted run of dual supply feeder stations and midpoint TSCs almost never happens in practice anywhere, there's always something more confusing going on. MML is the closest to consistency. Feeder stations with no neutral sections was sometimes a move made on BR era systems, sometimes but not always because they only had one grid supply incoming. That latter point is never repeated in post BR systems interestingly. For ECML: Nene, Newark, Benton and Ulgham Crossing come to mind - although the latter has 2 grid supplies, they're just in phase! (Even more strange!).
Sometimes, I've noticed, they went for the system of having two nearby feeder stations each with only one connection from a different grid site. And they operate in pairs where each can cover for the other in an N-2 situation. This especially seems to have been the way of doing things in the 1990s. So you see it in the Manchester area with Heald Green and Edgeley, and for Birmingham CrossCity with Winson Green and Galton Jnc. This kind of methodology is actually quite smart and is resilient to more situations. But it's not always going to be an option and is likely more expensive.
leading to having no control.
This is much more damming in my opinion. On older systems, ECRs operated their own pilot line networks that ran within S&T cable routes. But nowadays, and I'd assume anything GWEP follows this practice, SCADA communications are handled by the general use FTN network, so it's surprising to me that all the fibre lines to the substation were within that cable route.