You just put that in to make it harderThe bit about the concrete infill is probably a mistake. I think I may have got it from a comment by somebody on Robert Stenhouse's Flickr several months ago.
They might have wrongly thought it was a general use case in unused arches, I remember seeing it mentioned regarding the two unused arches at Colne Bridge Road, where they are down to infill them with foamed concrete hidden behind a matching stone facade.The bit about the concrete infill is probably a mistake. I think I may have got it from a comment by somebody on Robert Stenhouse's Flickr several months ago.
Stalybridge to Huddersfield will be the last bit of the jigsaw to complete the TRU job. The project plan is still out for consultation, so it won't start for a couple of years at least.Having watched many videos on TRU there seems to be no progress on any masts going up between Stalybridge and Huddersfield, is there any plans for this, also will the current Piccadilly to Leeds stopping service going to be converted to EMUs good use of 350s perhaps
Having watched many videos on TRU there seems to be no progress on any masts going up between Stalybridge and Huddersfield, is there any plans for this, also will the current Piccadilly to Leeds stopping service going to be converted to EMUs good use of 350s perhaps
In November 2025 Network Rail submitted an application to the DfT for an Order under the Transport and Works Act to authorise necessary works between Stalybridge and Diggle. NR's page on the application is here. It includes moving Mossley station and various works to bridges etc. In Stalybridge and Scout tunnels the tunnel floor will be lowered and slab track installed. Past the cottages at Mossley the wire over the up (=downhill) track will have a permanently earthed section.
There will also be an order for Standedge to Gledholt (Huddersfield) but it has not yet been formally submitted to the DfT. There has been a public consultation on it and NR's page on it is here. A third track will be reinstated between the east end of Standedge tunnel and the west end of the tunnels approaching Huddersfield.
I believe the tunnels approaching Huddersfield will be wired as part of the current works.
Do we know approximately when the Wakefield line junction will be shifted to run underneath the new structure, to allow the new fast line embankment down to the Calder Road bridge to be constructed?Just 24 hours after Demolition Saturday, we return to the TransPennine Route Upgrade to see what has changed across some of the most dramatic engineering sites in West Yorkshire.
This follow-up begins at the Baker Viaduct East Abutment, where embankment works continue to rise towards the new alignment. From there, we revisit Baker Viaduct itself, looking at the completed steel structure, ongoing concrete deck installation and the wider grade-separation works taking shape nearby.
Attention then turns to Calder Road Bridge, where the former structure has now been removed. With virtually no trace of the old bridge remaining, the space created for the future railway alignment is far clearer, and engineers can continue stabilising the embankment and preparing the route for the next stages of construction.
The final section revisits Colne Bridge Road Bridge, another structure removed during the previous day’s major possession. Its curved replacement is now fully visible, while the cleared railway formation shows how much additional space has been created for the future fast lines and overhead line equipment.
This video documents the immediate aftermath of one of the busiest demolition weekends on the TransPennine Route Upgrade and shows how quickly the landscape can change in just 24 hours.
Not one to start the rumour mill, but there are murmurings that this might move. Plenty of discussions ongoing within TRU at the moment.Neville Hill block is Summer 2028.
Brought forward or moved back?Not one to start the rumour mill, but there are murmurings that this might move. Plenty of discussions ongoing within TRU at the moment.
I suspect the resources (i.e. labour) for W2B/W2C may well be different to the current alliances on W3/W4 and E234.Brought forward or moved back?
I would be OK if it were moved back provided it was to focus resources on W2B and W2C. (Sorry - speculative)
Decision on Mossley station expected Spring 27 and if work is approved Summer 28 for works to start
Do we know approximately when the Wakefield line junction will be shifted to run underneath the new structure, to allow the new fast line embankment down to the Calder Road bridge to be constructed?
16 days at Gledholt Tunnel (immediately West of Huddersfield station) in September 2026
9 days at Common Lane (Church Fenton) in October 2026
37 days at Huddersfield ("Huddersfield #2") in January 2027 (from Xmas 2026)
37 days at Thornhill LNW Jn in June 2027
There are two sets of 9 days and lots of weekends at Mirfield in 2027
After Huddersfield #2 is finished in January, nothing really happens there (Stalybridge - Heaton Lodge Jn) until the following Christmas. Plenty of preparatory weekends happening in 2026 however.
East of Leeds weekends happening throughout 2026 and 2027 also.
Moved back.Brought forward or moved back?
I would be OK if it were moved back provided it was to focus resources on W2B and W2C. (Sorry - speculative)
Rumour has it TPE will announce their preferred manufacturer in the next two weeksStalybridge to Huddersfield will be the last bit of the jigsaw to complete the TRU job. The project plan is still out for consultation, so it won't start for a couple of years at least.
They have resignalled the route (and removed the box at Diggle).
Rolling stock other than the 802s is still to be decided (was intended to be new build).
So I'm presuming June 2027 ?? And all in one go? As the current middle line pointwork is basically under calder road bridge.
Does anybody know if this means the the new Ravensthorpe station will be one of the last things?
I HAVE PARTIALLY QUOTED A BRIEF SUMMARY:Not really a practical document to quote
Amey’s work has helped TRU West maintain momentum across a demanding electrification programme. By combining early integration, practical design input, efficient logistics and progressive assurance, the OLE team made strong use of a limited 28-day access window and supported the wider programme objective of a more reliable, higher-capacity and lower-carbon railway.
- Achieved around £18 million of accrued efficiency to date across the OLE contribution and wider Rail Systems / Alliance activity.
- Delivered a £5 million saving through value engineering and selection of more time- and cost-efficient foundation types.
- Progressed installation activity across more than 1,000 OLE foundations, fabricated steelwork, fixings, viaduct and tunnel attachments, and route-wide bonding and immunisation requirements.
- Supported future installation of approximately 140,000 metres of main line and auxiliary wiring.
- Helped enable electric trains that can reduce carbon emissions and improve air quality, supporting the programme’s aim to save up to 87,000 tonnes of carbon emissions each year.
- Contributed to proposals that could support up to 15 more freight trains per day and remove more than 1,000 lorries from roads each day.
Oh wow aren't they wonderful? The usual self serving, self congratulatory corporate crapI HAVE PARTIALLY QUOTED A BRIEF SUMMARY:
I think Amey are entitled to promote their contribution to the TRU project, but it does need Network Rail to confirm the project is now running early and under budget as a result.Oh wow aren't they wonderful? The usual self serving, self congratulatory corporate crap
I totally agree. NR being upfront especially with positive news would be really good and not do them any harm.NR has been having difficulty with electrification estimates and costs since they got the go-ahead (nationally) 17 years ago.
If I were NR I would not make too much noise on this, at least externally, until the project is much closer to completion. Especially if you already know there could be doubts on keeping to the timing for Neville Hill workI totally agree. NR being upfront especially with positive news would be really good and not do them any harm.
I totally agree. NR being upfront especially with positive news would be really good and not do them any harm.
I think that if you live near Whitacre Street, you might have a different opinion on how well things are going.If I were NR I would not make too much noise on this, at least externally, until the project is much closer to completion. Especially if you already know there could be doubts on keeping to the timing for Neville Hill work
Possibly, but that is a very small number of people in the scheme of things and they don't get to arbitrate on the delivery of the overall programme. And it is not as though that is the only route either.I think that if you live near Whitacre Street, you might have a different opinion on how well things are going.
I have to say I am very glad I don’t live there and I am sure you are too!Possibly, but that is a very small number of people in the scheme of things and they don't get to arbitrate on the delivery of the overall programme. And it is not as though that is the only route either.
Yes. Of course it will have been much worse when the railway was built, but with less perceived impact because people weren't making constant 'vitally important' 1/2 mile trips in SUVs.I have to say I am very glad I don’t live there and I am sure you are too!
I didn't mention car travel, SUVs or otherwise. The worksite is on people's doorsteps. I had the inconvenience of noise during the construction of P0 at Leeds, this is much worse for much longer.Yes. Of course it will have been much worse when the railway was built, but with less perceived impact because people weren't making constant 'vitally important' 1/2 mile trips in SUVs.