My initial theory was that one pilot may have operated them instead of the landing gear lever (muscle memory and all that). You’ll be amazed how many times flaps have been retracted instead of the gear! However, there were no call outs from the pilots (as far as we know anyway) that would’ve precluded a gear up selection. But that could just be because of poor standards.
I’m a licensed engineer on the 787 and have never known the fuel switches to be ‘sticky’ and be at risk of jumping out of their positions, despite countless engine runs.
I personally think a malfunction is out of the question. One pilot asked the other ‘why did you do the cutoff?’. That says to me the switches physically moved. If the switches didn’t move, that question wouldn’t have been asked. These switches cannot move on their own and would take a substantial whack to get them to move (which the CVR would easily pick up)
For me, this was either pilot suicide or a monumental balls up from one of the pilots.
I just don’t think, from the snippet of CVR transcript we’ve been allowed to see, which is as far as I’m aware literally what you’ve posted plus the mayday call 9 seconds after the switch(es) are set to RUN, that we can adequately deduce anything here at all.
The click of the switches should be audible on the CVR - they may be available on the Dreamliner DFDR as a
discrete parameter within the frame layout too, or they may be
derived from another sensor upstream - I’m not sure on that without access to the ARINC 429 (767 in the case of the Dreamliner?) layout/configuration documentation for that particular aircraft*. Even so, the data can be compromised in the event of electrical surge/unusual state rendering it, at that specific moment, invalid.
It is plausible that the switches themselves never moved at all, but the system believed they did downstream and the sensors picked this up and the derived switch positions established that they were at CUTOFF purely because of this. Because the full CVR transcript hasn’t been released, we do not know whether this is the case or not - however if it’s confirmed that the RAT deployed
before cutoff, as some accounts suggest, then a downstream failure is more plausible than simply human error/input. ELMS/FADEC/fire logic can change the commanded state without physical movement of the switches. Indeed I believe these considerations have been one of the reasons for the delay in publishing the final draft report, whilst Boeing and GE do a deep technical dive.
As far as ICAO ANNEX 13 is concerned the investigations follow an interrelated pattern of technical, human and organisational because they are often consequential and can identify systemic failures that require all the holes in the ‘Swiss Cheese’ to line up before they identify a risk. Sadly sometimes it can take catastrophic events to manifest and become apparent subsequently!
It could of course be intentional human interference, but as I continue to caution it is by no means nailed on and there is zero evidence of a cover up at this time. Accidents such as these often have countless avenues for investigation and given the time they’re putting into it I would suggest it may not be a simple case of intent or even ‘monumental balls up’.
I find it interesting, with reference to the BBC article linked to slightly up thread, that the one ‘commentator’ who is apparently involved in Canadian air safety ‘chose’ to remain anonymous. I’m always skeptical when a ‘source said’, because often times that source is either not credible or simply made up. In the case of the BBC I’m tending towards the former. Having been involved peripherally in numerous air safety investigations (internally, thankfully usually events that no external party would ever read - certainly [touch wood] no fatal events!) the caution is always that it’s human nature to jump to the conclusion and make the root cause fit the event. Investigators are trained not to do that. This goes for the Indian investigators too.
*on further research it would appear the switches do record as a discrete parameter.