They were running W8 containers if they did, W10 aren't cleared.
The IDAs and IKAs used by DRS on these services are cleared for high cube containers & swapbodies over the GSW - either via Annbank, or via Kilmarnock with a reversal at Falkland Yard or Barassie, then via Kilwinning. This is classed as "special gauge" on the RT3973 paperwork, but effectively gives similar clearance to W9. This allows high cubes on the megafrets typically used for Tesco traffic and other domestic intermodal, but not on the standard flats used for most deep sea container flows, which would require the extra height of W10 gauge. IDAs are no problem since they were specifically designed to carry 9 foot 6 high, 45ft long swapbodys within W8 gauge.
Despite the adequate gauge clearance, the additional journey time and associated costs mean the
GSW route - made even longer since the trains have to use the Ayrshire Coast instead of running direct via Barrhead - is only really suitable for occasional planned diversions when the WCML is shut north of Carlisle; and even then the preferred diversionary route seems to be via Doncaster and the East Coast main line unless something is blocking that route too.
68004 seen on the GSW near Thornhill with 4S43 in March 2023 - the first container looks like a high cube, and a couple of others are seen further down the train, sticking up above the LCGB coded 8 foot 6 Tesco containers:
https://www.flickr.com/photos/goremirebob/52736449973/ (Photo: Bob Avery)
Just to recap this thread and give some context:
In post #12 Freightmaster says:
4S43 has alternated between being single and double headed for weeks at a time for the past couple of years and frequently comes to grief on Beattock when single headed in the Autumn/ Winter months
Back when this thread started, 4S43 already had a bit of a reputation as a troublesome train. Posts #44 and #45 give some examples:
28th June 2021
On 1110 Euston-Glasgow C which arrived at Central 245 minutes late due to the failure of 4S43 (which did not occur on Beattock Bank as we passed the failed train at Penrith).
13th September 2022
On 0643 Euston-Edinburgh which arrived at Carlisle 100 minutes late due to the failure of 4S43, clearly also not on Beattock Bank.
While I have been delayed on the WCML multiple times due to infrastructure failures, severe weather and other incidents, no single train has ever cost me as much time as 4S43.
Four more dates I can find from this year [i.e. 2025] where 4S43 has seriously affected the WCML are:
February 20th 2025, April 14th 2025, September 1st 2025 and December 17th 2025
The December 17th incident was the one that started the thread. A summary of the delay incidents mentioned since the thread started:
17/12/25 - 4S43 - 88009 came to a stand approaching Beattock Summit
20/01/26 - 4S43 lost 40 minutes in Oxenholme area (single 88)
09/02/26 - 4S43 brake issue Quintinshill, 125 mins late
11/06/26 - "4S43 appears to have caused widespread delays earlier today between Carlisle and Edinburgh/Glasgow" resolved in about 90 mins
12/07/26 - 4M82 blocked the line for just over an hour (south of Oxenholme). Loco fault. (This was a DRS train - confusingly Freightliner have also used a 4M82 headcode on this route)
28/07/26 - 4M27 failed on the southbound approach to Beattock. 88010 loco failure. Stood for 2 and a half hours.
28/07/26 - 4S45 failed on Beattock in the early hours. Loco 68007. Stood for 90 minutes
*
So with 4S43 specifically, there are 5 known incidents in the last 12 months - 2 of which appear to be related to adhesion. Taking the DRS intermodal services as a whole over the northern WCML, that rises to 8 incidents, of which all but one blocked the line for at least an hour. Of these, loco issues of one sort or another are the most common cause (3 failures and 2 slipped to a stand), with the cause unknown in 2 cases and the other a brake issue (which from what I can remember was not caused by a loco fault).
I think the adhesion issues with single 88s are largely mitigated by the existing practice of double-heading services in the autumn leaf-fall season, but the two incidents in December and January indicate there are still problems in bad weather extending beyond the traditional "sandite season." As I said in previous posts, I don't think single 88s are suited to these trains, and the recent class 93 trials on these services suggest replacement traction is under consideration.
It's hard to assess the other incidents since the exact details and loco type are unknown in some cases, but it certainly looks like these services - and the 88s in particular - have more than their fair share of problems on this route. In the short term DRS are stuck with the fleet they've got, but hopefully there is a plan to replace the 88s on these trains with more reliable traction. We'll have to wait and see, but without some prospect of improved reliability I would be surprised if the end customer (never mind Network Rail or delayed passengers) was happy with the status quo.