Scenario 1, with the fewest additional services, would results in a capacity utilisation at Wigston North Junction of 90% in the Down direction (towards Leicester) due to the large number of conflicting moves. This is in excess of the desired level to run a reliable, punctual network and is likely to create timetabling difficulties. As Scenario 2 and 3 led to a utilisation of over 100%, interventions are recommended across all scenarios at this junction. The capacity analysis found that north of Leicester Station currently planned services through to the 2030s could be accommodated with existing infrastructure, primarily due to the low number of trains using the chord towards Syston East Junction