Syston to Sheet Stores/Trent East is now cleared for W10, restricted to slow lines only Syston to Ratcliffe due to the fast line bridge at Loughborough. Bridge 94, the next brick bridge north of this one (which is 88) is restricted to 25mph for W10 trains.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
Trying not to get sidetracked but as soon as things go slightly wrong, the Leicester area becomes a big bottleneck.

I’ve noticed that the additional freight services have to manoeuvre the extremely slow 10mph curve at Syston North(?) Jn.

This causes delays if there is an XC service behind it, or if there is an XC or another freight waiting to cross over from the MML, from the Leicester direction, towards Peterborough.

This then has a knock on effect to the northbound EMR services.

There’s definitely a capacity issue between Wigston and Syston.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
There’s definitely a capacity issue between Wigston and Syston.
One Network Rail were aware of at least 6 years ago:
[Link to Leicester Area Strategic Advice, authored in 2020]

Scenario 1, with the fewest additional services, would results in a capacity utilisation at Wigston North Junction of 90% in the Down direction (towards Leicester) due to the large number of conflicting moves. This is in excess of the desired level to run a reliable, punctual network and is likely to create timetabling difficulties. As Scenario 2 and 3 led to a utilisation of over 100%, interventions are recommended across all scenarios at this junction. The capacity analysis found that north of Leicester Station currently planned services through to the 2030s could be accommodated with existing infrastructure, primarily due to the low number of trains using the chord towards Syston East Junction
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,590
Location
Nottingham
On the grand scale of things a slow curve at Syston North is a win compared with the previous route over to the West Midlands and back, including passing through the Syston-Wigston bottleneck.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
On the grand scale of things a slow curve at Syston North is a win compared with the previous route over to the West Midlands and back, including passing through the Syston-Wigston bottleneck.
Especially as the Syston North curve is double track, as opposed to the single-line south curve, and joins the MML once it's back to 4 tracks so freight doesn't have to hit a gap in the Intercity traffic.
 