LeoJBH
Member
From what I heard arriva derby is withdrawing from Nottingham, so does this mean the 901 and the other hopper bises will be taken over bit like the 90 was in February, I don't know much about arriva and the hopper buses.
The Hopperbus is a contract which NCT supposedly have won from Arriva. The routes and timetables would transfer over, the vehicles and drivers won'tFrom what I heard arriva derby is withdrawing from Nottingham, so does this mean the 901 and the other hopper bises will be taken over bit like the 90 was in February, I don't know much about arriva and the hopper buses.
I’m speculating here, but in theory at least, if the drivers on the hopperbus are assigned primarily to that contract, they probably could transfer over under TUPE if they so desired.The Hopperbus is a contract which NCT supposedly have won from Arriva. The routes and timetables would transfer over, the vehicles and drivers won't
That was my thought, too.I’m speculating here, but in theory at least, if the drivers on the hopperbus are assigned primarily to that contract, they probably could transfer over under TUPE if they so desired.
I don't think that post you've screenshot means anything at allIdk if this is true but why would they put the green 11 and 12 together they barely overlap (just as much as the other green buses)
I think most of it is simply speculation. What does appear to have happened, though, is that 675 has been repainted after just five months in service!Idk if this is true but why would they put the green 11 and 12 together they barely overlap (just as much as the other green buses)
You would think they’d have repainted 2 of the lilac gas buses in reality given some of them will be displaced by the electroliners in the future anyway… seems odd!I think most of it is simply speculation. What does appear to have happened, though, is that 675 has been repainted after just five months in service!
Probably because they are the only E12s in green and the PVRs for the 11 and 12 individually wouldn't be big enough to have a dedicated fleet.Idk if this is true but why would they put the green 11 and 12 together they barely overlap (just as much as the other green buses)
The 11/12 and Bridgford bus are all Green E10s. But I agree with the base of your logic. The Bridgford bus E10s are decent sized pool already, while the 11 is just on its own, so I’d say it makes more sense for the 12 to join 11sProbably because they are the only E12s in green and the PVRs for the 11 and 12 individually wouldn't be big enough to have a dedicated fleet.
Hopper bus update
Tuesday, 14 July 2026
Following a comprehensive procurement exercise, Nottingham City Transport (NCT) have been appointed as the new operator of the hopper bus service.
NCT will be taking over the service from Saturday 1 August.
Hopper buses will continue to be free service, just show your university card to the driver when boarding the bus. If you do forget your card, just let the driver know that you don’t have it with you.
The 901, 903 and 906 hopper services will continue to operate on their current term-time and vacation timetables.
To receive hopper service updates, we recommend downloading the NCTX Buses app where you can favourite the hopper services to your account and receive personalised notifications about these services.
Travelling to Royal Derby Hospital
Due to teaching relocating from Derby Medical School to Nottingham, it has been decided to withdraw the 904-hopper service between University Park and Royal Derby Hospital Centre. The last day of service for the 904 will be Friday 31 July.
No 904 service after 31st July, when teaching is relocated to Nottingham.Just to add to previous comments about the Uni of Nottingham Hopper Bus, this has now been confirmed by the University.
Student news - Hopper bus update - University of Nottingham
Following a comprehensive procurement exercise, Nottingham City Transport (NCT) have been appointed as the new operator of the hopper bus service.www.nottingham.ac.uk
There seemed to be suggestion that they had potentially won the contract due to potential future availability of electrics, do we think this isn’t the case?Hopperbus will run with four spare biogas deckers plus 675/676 until some diesel buses are sourced
Imagine if NCT had six recently displaced, high-capacity diesel buses they could have used for ferrying students, perhaps with the numbers 907 and 925-9! If only they'd hung onto them a little longer, even just temporarily...Hopperbus will run with four spare biogas deckers plus 675/676 until some diesel buses are sourced
I guess they didn't meet age requirements, after all NCT would have known they at least had a chance of taking over the Hoppa when they were withdrawn.Imagine if NCT had six recently displaced, high-capacity diesel buses they could have used for ferrying students, perhaps with the numbers 907 and 925-9! If only they'd hung onto them a little longer, even just temporarily...
Presumably they're looking for 2nd hand diesels or dealer stock, rather than buying brand new?
But it's not like they couldn't have been used as spares elsewhere on the network to allow newer spares to be used on the Hopper Bus networkI guess they didn't meet age requirements, after all NCT would have known they at least had a chance of taking over the Hoppa when they were withdrawn.
It mentions "low emission" buses, not electric, for 2027. Does this mean more diesels have been ordered? I thought only electrics were on the way.
It also says:NCT placing an order for a fleet of brand-new low emission buses to enter service in the first half of 2027.
The contract term is eight years. This suggests they are ordering new non-electric buses for next year and intending to replace them with electrics later in the contract. Not sure why they should be doing this two-stage process considering they are already ordering electric double deckers for other routes anyway.As part of the contract, NCT will work in partnership with the University of Nottingham to transition services 903 and 906 to zero-emission electric buses.
Could it be to do with depot charging capacity? Might need extra work doing before they can cope with Hoppa. I doubt shareholder would be too happy if the recently ordered electrics for city work were diverted to the contract.The actual text:
It also says:
The contract term is eight years. This suggests they are ordering new non-electric buses for next year and intending to replace them with electrics later in the contract. Not sure why they should be doing this two-stage process considering they are already ordering electric double deckers for other routes anyway.
I think the line ‘with NCT placing an order for a fleet of brand-new low emission buses to enter service in the first half of 2027’ is quite clear on what the plan is.Apologies if this is obvious but I don't know the fleet well.
Are the incoming electrics going to display any existing buses which could be classed as low emission which, in turn, could be moved on to these routes?
With the longer term shift to electric, surely they won't order anything specifically for this route that isn't electric?
Interesting observation - I’d argue that NCT has followed Trent Barton’s lead in that matter. NCT was a very traditional operation pre Mark Fowles leadership.Spent a few days in Nottingham to explore the city and around it. Have to say I'm very impressed with NCT, very frequent services on modern buses. Colours for each corridor made it very easy for someone like me who is completely unfamiliar with Nottingham and all the buses I saw were on the correct routes. Was really great to be somewhere where I can walk to a bus stop, a bus turns up in moments, quickly gets to another part of the city, I change and within minutes can go further up the road on another. Found the 25 very useful for Arnold from Carlton Hill, avoiding the need to go back to the centre first. Impressed by the speed of the services too. Loved how easy it was to get a network map and a timetable as there's a travel shop, something that just doesn't exist anywhere in London or Herts/ Essex. Very decent late evening/ night time service too which I'm jealous of. If an area is urban, buses should be readily available at 8/ 9/ 10/ 11pm, minimum every half hour by default. Also impressed by the punctuality of the 90 to Newark, which got a lot busier than I expected. Saw a full bus going to Nottingham on route (around Midday, so not rush hour), suggesting single deckers is not enough if that's a regular occurrence!
I only really have 2 complaints on NCT, the next stop announcement says the stop too quietly and finding buses on Upper Parliament Street and surrounding streets was really difficult. There should be information at city centre stops saying where to get all buses from with a map to make wayfinding easier. Got confused with the 1 and Rainbow 1 and initially waited at the wrong stop! Would've just walked to Victoria had I knew it would be that confusing.
Also found because the standards were so high, seemed to push up standards on the private operators, especially Trent Barton. Again very modern and frequent all day. And I thought their services complimented the city ones really well. Only problems I had with Trent Barton were the window in the ceiling of the bus made it feel very hot inside and my disabled bus pass for some reason wouldn't scan but the staff were fine about it.
I can see why the East Midlands Mayor doesn't want to touch the buses if they already work so well in her region. Many parts of the country aren't so lucky.
Many city centre stops have a map with an index of all the suburbs, showing the routes and stops for each one, but it may not be up to date. I can't find this online.I only really have 2 complaints on NCT, the next stop announcement says the stop too quietly and finding buses on Upper Parliament Street and surrounding streets was really difficult. There should be information at city centre stops saying where to get all buses from with a map to make wayfinding easier. Got confused with the 1 and Rainbow 1 and initially waited at the wrong stop! Would've just walked to Victoria had I knew it would be that confusing.