• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

First Greater Glasgow

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

David M

Member
Joined
16 Jan 2018
Messages
244
First route to use the new bridge. I thought due to the waiting times for the bridge to lift, operators were not interested in any routes over the bridge.
I think it's more that the bridge opens and closes at very irregular times so a proper timetable is well nigh impossible.
 

92002

Established Member
Joined
27 Mar 2014
Messages
1,251
Location
Clydebank
I think it's more that the bridge opens and closes at very irregular times so a proper timetable is well nigh impossible.
If they get caught with an unexpected closure the alternative is to use the tunnel or Erskine Bridge.
Not to sit and wait.
Happens quite regularly in Europe and it's not a real problem if planned for the Day ahead.
 

Joerf21

Member
Joined
23 Jan 2022
Messages
151
Location
Clydebank
You would think that the port authority would let public service buses know in plenty of time of marine traffic for bridge closures
 

Buzby

Established Member
Joined
14 Apr 2023
Messages
1,651
Location
Glasgow, Scotland
You would think that the port authority would let public service buses know in plenty of time of marine traffic for bridge closures
Good intentions apart - what happens when the ship doesn’t appear at the pre-arranged/agreed opening time? Say ‘Sorry, you’ve missed your slot’? Anything could happen from a planned itinerary (just ask PS Waverley!) I’m sure as an active waterway, its traffic has a right of passage that the Council (who control the bridge swing) cannot override. Telepathy might be useful, but Sod’s Law will always surface.
 

92002

Established Member
Joined
27 Mar 2014
Messages
1,251
Location
Clydebank
Good intentions apart - what happens when the ship doesn’t appear at the pre-arranged/agreed opening time? Say ‘Sorry, you’ve missed your slot’? Anything could happen from a planned itinerary (just ask PS Waverley!) I’m sure as an active waterway, its traffic has a right of passage that the Council (who control the bridge swing) cannot override. Telepathy might be useful, but Sod’s Law will always surface.
The majority of closures are for PS Waverley. With an odd ship going on trials from BAE. Perhaps Waverley should consider another base if they are unhappy. If they think the majority of travellers come from Glasgow Area it could easily be solved by using road transport.
 

Spsf3232

Member
Joined
21 Apr 2016
Messages
406
Location
Glasgow
The majority of closures are for PS Waverley. With an odd ship going on trials from BAE. Perhaps Waverley should consider another base if they are unhappy. If they think the majority of travellers come from Glasgow Area it could easily be solved by using road transport.
Almost daily departures from KGV docks so it's not just the Waverly
 

Tom Gallacher

Member
Joined
19 Mar 2021
Messages
276
Location
Glasgow
The majority of closures are for PS Waverley. With an odd ship going on trials from BAE. Perhaps Waverley should consider another base if they are unhappy. If they think the majority of travellers come from Glasgow Area it could easily be solved by using road transport.
It closes at least 4 times a day, sometimes for 20 mins when presumably the staff have their break.

== Doublepost prevention - post automatically merged: ==

Good intentions apart - what happens when the ship doesn’t appear at the pre-arranged/agreed opening time? Say ‘Sorry, you’ve missed your slot’? Anything could happen from a planned itinerary (just ask PS Waverley!) I’m sure as an active waterway, its traffic has a right of passage that the Council (who control the bridge swing) cannot override. Telepathy might be useful, but Sod’s Law will always surface.
A lot of the ships that navigate the Clyde are dictated by the tidal flow, especially the bulk carriers. The bridge authority will have plenty of notice if a ship is behind schedule and will work with that. Marine tracker gives you a pretty accurate up to the moment ship positions and ETA's. The ships are not like buses, they don't just turn up. For most of them tugs are needed to get them up river. It's a well planned operation getting any ship of size into a harbour.

== Doublepost prevention - post automatically merged: ==

You would think that the port authority would let public service buses know in plenty of time of marine traffic for bridge closures
They will have plenty of notice but due to tidal constraints (the times of high and low tides varies on a daily basis) you can't open the bridge to a set timetable. The moon is responsible if you want to apportion any blame.
 
Last edited:

Buzby

Established Member
Joined
14 Apr 2023
Messages
1,651
Location
Glasgow, Scotland
For ‘bridge authority’ read Renfrewshire Council - it’s their staff. True, it’s not as busy as it once was but with KGV providing a destination and departure point such traffic needs to be managed and unlike many other ports there‘s no ability to allow ships to pass each other until Tail o’ the Bank.

Whether passengers like it or not, river traffic will always take priority until navigation rights are extinguished and I don’t see that happening. The Renfrew and Erskine chain ferries worked because their timetable allowed flexibility (and they could nip behind any approaching vessel as soon as it passed). That’s not easily done with two sides of a swinging bridge.
 

JumpinTrainz

Established Member
Joined
30 Jul 2018
Messages
1,929
With more repowers due I’m wondering if the intention is to start replacing the E300s with deckers instead of singles as the oldest buses will be about 15 by then. It certainly would be a sensible option.
 

Volvodart

Established Member
Joined
12 Jun 2010
Messages
2,929
With more repowers due I’m wondering if the intention is to start replacing the E300s with deckers instead of singles as the oldest buses will be about 15 by then. It certainly would be a sensible option.
There are still quite a lot of Geminis to replace and of course the low height E400s first.
 

92002

Established Member
Joined
27 Mar 2014
Messages
1,251
Location
Clydebank
There are still quite a lot of Geminis to replace and of course the low height E400s first.
Read something somewhere that the next repowers would be the low height E400s. This time being done by ADL. Better than nothing, but new E400s would be much more of an expectation.
 

JumpinTrainz

Established Member
Joined
30 Jul 2018
Messages
1,929
Read something somewhere that the next repowers would be the low height E400s. This time being done by ADL. Better than nothing, but new E400s would be much more of an expectation.
I’d be surprised to see them repower 15 year old buses which will be even older by the time this is rolled out.
 

92002

Established Member
Joined
27 Mar 2014
Messages
1,251
Location
Clydebank
I’d be surprised to see them repower 15 year old buses which will be even older by the time this is rolled out.
Guess the way they look at it is if they spend and repower and get another 10 years out of them, it will be cheaper than buying new. By then they could afford to buy new.

It it were me I would just buy new or lease new. The current repowers are not really that much older. Hence the personal registrations.
 

route101

Veteran Member
Joined
16 May 2010
Messages
12,243
Knowing First Glasgow, expect 100 single decker's to come!

I expect the low height E400s to be retired and no replacement.
 

JumpinTrainz

Established Member
Joined
30 Jul 2018
Messages
1,929
Knowing First Glasgow, expect 100 single decker's to come!

I expect the low height E400s to be retired and no replacement.
I’m inlined to think the same. I don’t imagine buses that old will be repowered and fully refurbished inside. That version of the E400 isn’t even produced anymore.
 

Metal Mickey

Member
Joined
9 Nov 2021
Messages
365
Location
Scotland
Knowing First Glasgow, expect 100 single decker's to come!
They’ll be told what buses they are getting from Group HQ.

With more repowers due I’m wondering if the intention is to start replacing the E300s with deckers instead of singles as the oldest buses will be about 15 by then. It certainly would be a sensible option.
This is First we’re talking about and there will be resistance from the powers that be with regards to replacing singles with doubles.
 

Jordan Adam

Established Member
Joined
12 Sep 2017
Messages
5,654
Location
Aberdeen
I doubt they’d get another 5 years out of the E400s with the condition the chassis is in on most of them nevermind 10 years. In contrast the Streetdecks are a lot tidier underneath.

I think the idea of the 11/61 plate E400s getting repowered is highly unlikely.
 

route101

Veteran Member
Joined
16 May 2010
Messages
12,243
I doubt they’d get another 5 years out of the E400s with the condition the chassis is in on most of them nevermind 10 years. In contrast the Streetdecks are a lot tidier underneath.

I think the idea of the 11/61 plate E400s getting repowered is highly unlikely.
Perhaps confusion with the 61 plate hybrids that were supposed to be converted to diesel.
 

TheGrandWazoo

Veteran Member
Joined
18 Feb 2013
Messages
22,843
Location
Somerset with international travel (e.g. across th
I doubt they’d get another 5 years out of the E400s with the condition the chassis is in on most of them nevermind 10 years. In contrast the Streetdecks are a lot tidier underneath.

I think the idea of the 11/61 plate E400s getting repowered is highly unlikely.
Perhaps confusion with the 61 plate hybrids that were supposed to be converted to diesel.
Whatever the "confusion", @Jordan Adam is right to say that 15 year old vehicles aren't going to be repowered.
 

sannox

Member
Joined
1 Mar 2016
Messages
649
What do you do with the 6? Arguably it struggles with the lower frequency and single deckers- upping the frequency is a lot more resource and cost. Deckers are simple but nothing made to fit...
 

Top