Trainman40083
Established Member
These skip lorries sure cause some damage at speed.
Around here, if a road vehicle driver saw a light suddenly turn red in front of them they'd accelerate!if you’re 50m from the bridge you might as well string a thin wire across (or a laser) and if it’s broken a standard traffic light in front of the bridge changes to red, with an accompanying illuminated sign saying vehicle overheight. Using a regular traffic light will be something a driver would react to almost automatically by habit.
All well and good till it doesn't work. There was an overheight vehicle detector on my commute last year, it was detecting an overheight vehicle every time I went past it!if you’re 50m from the bridge you might as well string a thin wire across (or a laser) and if it’s broken a standard traffic light in front of the bridge changes to red, with an accompanying illuminated sign saying vehicle overheight. Using a regular traffic light will be something a driver would react to almost automatically by habit.
Part of the signage is visible in post #2, where the yellow L and O of the LOW BRIDGE warning panel can be seen almost edge on, lying on the ground before the main structural beam with the yellow chevron markings.I think the signage is on the chunk of bridge that's directly on the road surface, so hidden from view now
There has been vast amounts of money spent over the past 15 years or so on installing miles and miles
of palisade fencing along the entire WCML, even in remote areas, to try and reduce delays and disruption
caused by trespass, so it seems strange that measures to protect a handful of low bridges from being
damaged like this cannot be justified on cost grounds...
As others have said, it’s not cost per se. There are significant legal issues.
I personally think that one was overkill, around bridges etc yes, middle of nowhere? Not so sure.There has been vast amounts of money spent over the past 15 years or so on installing miles and miles
of palisade fencing along the entire WCML, even in remote areas, to try and reduce delays and disruption
caused by trespass, so it seems strange that measures to protect a handful of low bridges from being
damaged like this cannot be justified on cost grounds...
Exactly, even the cost of inspection and disruption from a bridge strike that causes no damage probably outweighs the cost of said preventative measure...
== Doublepost prevention - post automatically merged: ==
I personally think that one was overkill, around bridges etc yes, middle of nowhere? Not so sure.
What happens when/if the driver doesn't stop?You’re missing my point. I’m talking about something that alerts the driver to what he’s about to do, so that he can stop, not something that by itself will stop him
Except that, even where there are bridge protection beams, any reported strike still rewuires the same response as the site has to be inspected to be sure it is just the protection beam damaged, and not the structure itself. Which causes disruprion, obviously.
Tbey have overheight detection and warning signs with flashing lights on the A606 bridge at Tollerton, just outside Nottingham, and it still gets hit regularly.You’re missing my point. I’m talking about something that alerts the driver to what he’s about to do, so that he can stop, not something that by itself will stop him
I have no idea of exactly what happened here, but if the driver of the offending vehicle has driven off without reporting it, with the damage as it is, I think he (or she) will be lucky to avoid a spell at His Majesty’s pleasure. It would be a special kind of stupid to leave a decent chunk of what is obviously railway on the ground and drive off without telling anyone. Now of course he (of she) may well have reported it and been advised by the authorities to head off. I guess the police investigation will ascertain the facts.But those penalties would have to be extremely severe, we're talking loss of driving licence for life & custodial sentences.
I agree, and I suspect the traffic commissioner may well be having their licence entitlement away (assuming they have one) for quite a while.I have no idea of exactly what happened here, but if the driver of the offending vehicle has driven off without reporting it, with the damage as it is, I think he (or she) will be lucky to avoid a spell at His Majesty’s pleasure. It would be a special kind of stupid to leave a decent chunk of what is obviously railway on the ground and drive off without telling anyone. Now of course he (of she) may well have reported it and been advised by the authorities to head off. I guess the police investigation will ascertain the facts.
If the beam is free standing a distance from the bridge then surely no inspection would be necessary. I appreciate that's apparently not currently legal, but imo changing that would be worth it for the reduction in disruption.Except that, even where there are bridge protection beams, any reported strike still requires the same response as the site has to be inspected to be sure it is just the protection beam damaged, and not the structure itself. Which causes disruption, obviously.
I agree, and I suspect the traffic commissioner may well be having their licence entitlement away (assuming they have one) for quite a while.
Contingency plans only ever in the main covered the thinning of services to enable a robust complete service to run via the West Mids, never any diversions via Nun/Cov for Avanti (or previous) due to crew route knowledge.
Regardless it will be chaos for as long as it takes as services will be thinned yet not retimed which will knock on to later services, crews will have to part diagrams cancelled and not be able to get to their next starting location.
Case in point the recent Bourne End dewirement, following morning right time from Lichfield, 45” late Euston and that is just with a slow line diversion
If the beam is free standing a distance from the bridge then surely no inspection would be necessary. I appreciate that's apparently not currently legal, but imo changing that would be worth it for the reduction in disruption.
Concrete is a ceramic. No way in hell is it going to be reused.Obviously not permanently but it seems from the images that it is a pretty chunky beam and would survive a fall.
That has to be the worst consequences of a bridge bash to ever grace the pages of this forum.
If the rest of the bridge beams haven't been disturbed looks like they should be able to get two tracks back as long as no damge to the signalling cables that are hanging in the air.
Yes even a 20 mph TSR would not be vastly restrictive.Yep, two track (with restrictions) tomorrow, subject to overnight tests, would be my half educated guess.
Surely they have to cancel the engineering work in Coventry on Sunday if this isn't fixed by then.
If as indicated the vehicle got trapped and then dislodged the bridge beam by reversing back the rest of the beams should be secure.However, if that is what happened i find it somewhat surprising skip lorry can exert sufficent force to dislodge a beam.Yep, but I suspect that won’t be necessary.
Far earlier than that, 4L17 was sent down the T.V. from Stafford and is electrically hauled so can’t go via Leicester.Well it looks like we’ll findout soon, 4M58 has just been routed down the Trent Valley from Rugby…
Far earlier than that, 4L17 was sent down the T.V. from Stafford and is electrically hauled so can’t go via Leicester.