Tobytrain10
Member
I just saw a lawley street freight has gone via coventry arena 4M93Some freight has already gone via Coventry from Nuneaton and v-v.
I just saw a lawley street freight has gone via coventry arena 4M93Some freight has already gone via Coventry from Nuneaton and v-v.
Feel for TOC controllers and NR controllers, never rains but it pours.It never rains but pours. OLE issues now reported in Kilsby Tunnel. Trains diverting via Northampton.
It never rains but pours. OLE issues now reported in Kilsby Tunnel. Trains diverting via Northampton.
This is idiotic. If a vehicle hits a beam at the height of the following bridge they were going to hit the bridge, NR will have done them a favour by reducing the damage they cause.A protection beam on free-standing supports in advance of a bridge can be considered as an obstruction to the highway contrary to Section 178 of the Highways Act 1980... [If a lorry hit the protection beam, I suppose the drivers insurers could then claim that Network Rail are then liable for the damage to the lorry!]
Contingency plans only ever in the main covered the thinning of services to enable a robust complete service to run via the West Mids, never any diversions via Nun/Cov for Avanti (or previous) due to crew route knowledge.Avanti have the 805s now.
Ah yes, of course. So usual route from northern based terminals down to Nuneaton. Would they then divert onto the Coventry line, before re-joining at Rugby, or would they turn off towards Leicester and Peterbrough, and go to eastern ports that way?They won't need to via Water Orton, there is a link off the WCML at Nuneaton.
Have Avanti or their predecessors ever used Bedworth for diversions? I don't think they have? So the trains haven't been cleared and they don't have any crew.Avanti have the 805s now.
Yes I agree, but cut them some slack, the person typing that will also have 20000 other jobs to deal with.Yes it's obvious, but bad information can be worse than no information.
Proof reading before posting is key.
Totally agree. A girder about 50 yards from the bridge stops it getting hit.This is idiotic. If a vehicle hits a beam at the height of the following bridge they were going to hit the bridge, NR will have done them a favour by reducing the damage they cause.
Imo free-standing advance beams are the most effective way to prevent strikes. These drivers are thinking they can get away with it and the only way they're going to stop is if they hit something. They don't know the height of their vehicle so additional signs or penalties are not going to help.
Thanks for this. We will of course have to wait until the bridge is inspected, as you say there is the chance that bridge as a whole has been weakened.If you count the concrete beams (on Streetview) there are 16 of them across the width of the bridge, which carries three tracks so an average of 5 beams per track. From the photo in the first post, it looks like it's probably only an outer beam that's been demolished - there's no track or sleeper ends visible hanging across the gap (just cables and a duct/pipe). There's still the potential issue of other beams being displaced or weakened, of course
CD366 sets out the requirements for collision protection beams, for anyone who enjoys technical reading.
A protection beam on free-standing supports in advance of a bridge can be considered as an obstruction to the highway contrary to Section 178 of the Highways Act 1980... [If a lorry hit the protection beam, I suppose the drivers insurers could then claim that Network Rail are then liable for the damage to the lorry!]
A protection beam fitted to the existing structure is acceptable, but it's difficult to do that in a way that provides meaningful protection to the bridge.
Most bridge strikes don't require repairs, but if you report that a bridge has been struck, then trains will be stopped or cautioned (depending on the bridge) until someone examines it. It's probably this disruption that drives most of the cost. Even if you go ahead and provide a protection beam, it's still likely that trains would be disrupted until safety checks were completed, so the costs do not go away... although you might be able to change the bridge from 'stop all trains until inspected by an engineer' to 'first train driver inspects track at caution and then further trains are speed limited until an engineer can visit'
I think you've got it spot on. If the beam was pushed off that easily it may even be possible to lift it back up and be reset on the abutments allowing the line to re-open with a severe speed restriction.With the truck facing away from the collapse and the gouge mark on the fallen beam in the original photo, I think it got part of the way under, realised they'd hit it, and tried to back out which pushed the beam off the abutments.
They will do the minimum necessary to get the railway operational again. Trying to lower the road would involve doing a design, identifying and relocating any utilities under it, probably installing drainage in the new dip, and would extend the closure from I guess a week or more into months.
Could be either to be fair. London Gateway is likely to be via Cov.Ah yes, of course. So usual route from northern based terminals down to Nuneaton. Would they then divert onto the Coventry line, before re-joining at Rugby, or would they turn off towards Leicester and Peterbrough, and go to eastern ports that way?
I think you've got it spot on. If the beam was pushed off that easily it may even be possible to lift it back up and be reset on the abutments allowing the line to re-open with a severe speed restriction.
Obviously not permanently but it seems from the images that it is a pretty chunky beam and would survive a fall.Can't imagine a piece of 1960s concrete that has been hit and fell nearly 4 meters onto the ground will be reused!
Seems odd to me given how risk averse the railway has become over the last few years.
Its money.
There has been vast amounts of money spent over the past 15 years or so on installing miles and miles
of palisade fencing along the entire WCML, even in remote areas, to try and reduce delays and disruption
caused by trespass, so it seems strange that measures to protect a handful of low bridges from being
damaged like this cannot be justified on cost grounds...
A long time ago. InterCity yes on drags, loads. Virgin Trains, very infrequently and only with Voyagers. Last time I can say (having worked the box at Coundon Road), I've got a video of a Voyager passing the box in 2007 in Virgin livery. CrossCountry sometimes have an odd one go that way when Stafford - Wolves - Brum is knackered and just run Stafford straight to Coventry up the Trent.Have Avanti or their predecessors ever used Bedworth for diversions? I don't think they have? So the trains haven't been cleared and they don't have any crew.
They did go via Nuneaton Abbey Jn with Voyagers right until the end, although that'd be no particular help here.
The photos are from reviews that people have posted - on the Google Maps profile, Reviews tab, sort by Newest.
Hmm seems like a lot of workIt looks to me like one concrete beam (of a total of about 15 which I’ve only estimated from Streetview), and the non-load bearing parapet on that side, has been pushed off the abutments. As there’s only small amount of ballast on the ground all the tracks might still be in their correct position. I’m no civil engineer but I suspect it’s fixable with a replacement beam. Could they even fit a temporary steel replacement?
if you’re 50m from the bridge you might as well string a thin wire across (or a laser) and if it’s broken a standard traffic light in front of the bridge changes to red, with an accompanying illuminated sign saying vehicle overheight. Using a regular traffic light will be something a driver would react to almost automatically by habit.Totally agree. A girder about 50 yards from the bridge stops it getting hit.
Depends how urgent the work is, I'd be veey surprised they even postpone that especially if its been advertised to the general public for weeks and the necessary things put in place to facilitate it.I’m guessing that the Coventry engineering works will be postponed as I can’t see this operating by then
They also have the line via Coventry and the Stour Valley avoiding New Street, assuming the crews have route knowledge. So many more alternatives available than if it was (for example) south of Roade.I would imagine they could get two of the three lines back up and running fairly quickly, with a speed limit. How disruptive would that be?
They'd have to structurally check it, be happy that it doesnt slide or become compromised any more than it currently is under dynamic load aka train movements up to X speed for the load of traffic it handles. Its definitely a waiting game.I would imagine they could get two of the three lines back up and running fairly quickly, with a speed limit. How disruptive would that be?
I disagree. A sign is something a driver can easily ignore ("they're just being overcautious"). Hitting a bar is something that cannot be ignored. Unless they're running from the police or something they will stop.if you’re 50m from the bridge you might as well string a thin wire across (or a laser) and if it’s broken a standard traffic light in front of the bridge changes to red, with an accompanying illuminated sign saying vehicle overheight. Using a regular traffic light will be something a driver would react to almost automatically by habit.