What you say makes sense. As I said, the railway has seen changes in the past like when the normal workweek shifted from 6 days to 5. But actually, before it changed to a shorter day on a Saturday (with a lunchtime peak for travel home), it was a full day on Saturdays at one time. So what you are saying is more of the change from a full Saturday to half day Saturday, is now taking place on Fridays - not quite the same, but a social shift in working times.It would be messy on GN.
Pre last December when there were the Letchworth-King’s Cross fast peak services it would have been quite easy to remove these. Now the peak stopping service originates from Letchworth it leaves a fundamentally different service on Mondays to Thursdays. Meanwhile on the Peterborough route the Saturday extras are timed to suit days out in London rather than work travel, as are 12-car lengthenings on the Fen Line.
This whole situation is a mess. If anything it would be better to run a full morning peak on Friday and trim out some evening peak services, as it seems to be more the evening peak which has reduced demand compared to other days.
I did think about what they would do with the peak extras from Peterborough, as there are some peak extras on Saturdays for the leisure peak, so the treatment of these (weekday or Saturday timings - or perhaps something more tailor made for just a Friday?!) will be interesting.