Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
This is not strictly true. If only 1 Train Manager then you are correct, but if a caterer is also provided they are in the front portion and the double set can run
Well in Summer 2014, the Network Rail West of Exeter resilience Study, stated the cost of an all singing, all dancing dual track Northern Route complete with brand new Meldon viaduct was £875m.
If you google West of Exeter Route Resilience Study (networkrail.co.uk) it will come up
There were...
First of all. It is Okehampton, not Oakhampton. Residents get quite annoyed by that as Okehampton is named after the river Okement! You are correct that the emergency connection was only ever single track. The SR had its own way into Plymouth built by the grandiosely named Plymouth, Devonport &...
I don't refute your logic in any way with Bere Alston. When I personally calculated possible speeds, the curvature slows the speed, as does the fact a platform is there. I got the equation from a friend of mine at Network Rail. Max non stop speed through Bere Alston in theory is 50 mph. Better...
True. The same West of England report showed a non stop speed of 49 minutes via Dawlish and I have travelled between Plymouth and Exeter on a non stop Voyager in that time. 4 minutes less than via Okehampton. The current route is the quickest but my point is there is not much in it
Of course...
True. But the 90 minutes quoted up the thread is also too slow. The longest straight in Devon is on this line and despite a check of 60mph through Crediton and Coleford (due to 20 chain curve) unless Coleford realigned. The line between Sampford Courtenay and Exeter St Davids is capable of this...
Just a quick point, it is not 9 miles longer at all. Its half of that but with potentially higher ruling speeds. Network Rail 'West of Exeter' study compared times on current route non stop between Exeter and Plymouth as 49 minutes for a Voyager and Northern route was 53 minutes.
Fastest...
The LSWR line was in fact used some 9 months after it closed. On 19th/20th February 1969 the line had a snow plough pass over it and a freight train ran on the 20th from Plymouth to Exeter.
Zealous was the loco and it failed. The crew had to go to a house to seek help and the occupants could...
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.