• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by swrailuser

  1. S

    Paddington station roof

    This would be best especially if they were to include bomb film in it too so that in the event of a break the glass stayed in place.
  2. S

    If a train is booked to stop, must it, in fact, physically do so?

    Try the Line to Barnstaple as an example it works as all but Crediton and Eggesford are request stops, unless the train is booked as a fast and does not stop for requests this makes about a 15 minute difference on the Journey
  3. S

    4 car Virgin Voyager ?

    We often have 4 car voyagers down in this neck of the woods especially the 1644 sardine can from Bristol Temple Meads to Plymouth/Penzance which get cancelled at Exeter when is a high tide with a stiff breeze
  4. S

    Inaudible onboard announcements

    Hopefully with the Refurb planned on the 159's from Exeter and Salisbury this problem will be fixed if enough of us have had our concerns noted in the hand over
  5. S

    Great Western Electrification Progress

    To prevent passengers being swept off the platform by the backdraft of a passing train as once occurred at harpenden when a small person was thrown across the tracks after a passing HST at speed had been through and the person was standing on the edge.
  6. S

    Great Western Electrification Progress

    never Temple Meads has been canned parkway is as close as you get
  7. S

    GWR Class 800

    yes great for an East coast rail user but not for a west country passenger where the train is in diesel mode for up to 80% of its journey
  8. S

    Rail electrification scrapped / 'suspended'?

    With the tripling costs of the complete cock up of the electrification on the GWML suddenly the bi-mode are the way forward, unfortunately these trains will be a much poorer replacement for the HST, so far none of the train companies have considered a replacement power plant such as the Methane...
  9. S

    GWR Class 800

    With The current position of the electrification of the GWML these new trains for the cardiff swansea route will spend about 50% of their time underperforming whilst in diesel mode ( a noisy 95 mph max) and those who will be on the 802's will have to suffer this for up to 80% of their journey as...
  10. S

    Private Sidings Department?

    From what I can see on various historical sources the Private sidings dept were a division of the LNWR that managed the interconnection of company sidings to the LNWR main lines.
  11. S

    Comparison of safety between overhead line vs third rail electrification systems

    max speed on third rail 110 if your lucky OHLE 325 KM in europe 140 mph here transformer 3rd rail 1 per mile ole 5 miles or more economics power transfer and speed
  12. S

    What are your fondest memories of the railway?

    Using the newspaper train from Exeter to Barnstaple with the lights out on a 110 or 101 DMU and seeing the countryside at night between naps on the wide bench seats:)
  13. S

    Websites which show how many coaches a train is formed of.

    you can get historical info on trains from the NR app for 24 hours ---- useful when needing proof of delays when filing claim online.
  14. S

    Great Western franchise to be broken up?

    WEll thats us down here on the SWML *uggered as we wil get more life expired kit while the GWML sector gets the AT800's 16X 397's etc and we end up with 143's 153's and worse with slow trains to the south west to replace the venrable HST's that have never been allowed to run properly over the...

Top