Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Probablly not as part of normal service patterns, but I could see it getting used in disruption or perhaps for stabling. IIRC the signalling was already there so may as well have the stop board to go with it.
While that is a useful approach in many cases, I don't think it works in the case of Manchester/Liverpool.
1. There are two roughtly-equal in time/distance but largely disjoint routes between manchester and liverpool. The "chat moss" route via earlstwon and the "clc" route via warrnington...
My understanding
magstripe tickets have very limited data storage capacity, there is a "ticket number" but IIRC it's not big enough to uniquely identify a ticket across the whole country. Some ticket barriers will write back to a ticket to mark it as "used", this being far more common on TFL...
I don't think you can read the "participating operators" section and yet ignore the actual description of the ticket (emphasis mine).
I do think it's a bit crappy though that you have to go to a seperate "trams" page to find out which trams plusbus is accepted on, rather than it being...
I'm pretty sure the 9 headcode for thameslink predates ATO. I can see two advantages to using it.
1. The regular headcode system is simply not designed to accomodate the massive numbers of inter-region trains that thameslink (and crossrail) entail. AIUI the first number if a regular headcode is...
TPE operate quite a bit from 13/14 which are primerally accessed via
Also the current gates at picadilly are operated by Avanti and TPE. Maybe they decided it was easier to avoid introducing a third gate operator to the mix.
There are also many cases where ticket acceptance is arranged on busses not managed by the railway, I highly doubt these are ever loaded into railway timetabling systems.
Seen that sort of thing in a few places, not just on the railway.
I presume that when the screen is unable to correctly establish a network connection and talk to it's master server the it drops into a mode where it displays troubleshooting information.
Regardless of what they are doing next, eveyone enters/leaves the station via connections to the south terminal of Gatwick airport
Cross-referencing different maps, it seems there are essentially 3 options for pedestrians from there.
1. Exit onto the footpaths and service roads between the...