Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
It may well be the case that turbos are failing through the day causing the lack of notice. They are stretched to the limit with limited spare sets meaning cancellations are inevitable. I guess we can thank the dft for their mismanagement since COVID.
Sadly,the reason for fencing nearly all stations from the main line is the far too regular suicides at these stations. If the fencing has saved one life it's paid for itself.
387s already go as far as Cardiff. Although capable of being 12 car the curvature at Newport means that they are 8 car length. As a rule, they match the pet timings.
The key issues are the lack of first class and catering, along with few spare sets being available.
Theale platform 3 is only used for terminating trains during engineering work. It is regularly used for both the cement and aggregate terminal and the fuel terminal.
Wiring the Devon banks seems a strange thing not to put in.
Makes a lot of sense as substantial amount of power is used (battery or diesel) climbing these, hence the extra generators on the 800s that head South West.
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.