The track around Clipstone box has been lifted, isolating it from the open railway it controls but the branches to Wellbeck Colliery and Thoresby Colliery are still in situ but oou
The area I work in for NR have a contractor who collects most animals after reports of something being killed. We will initially remove from the track and get it to a location where it can be recovered. If the dog has a tag on we will contact the owner.
As for the roads reportable animal...
There are two workstation now in York ROC covering the 5 Panels from the PSb.
All that happened was the panels were unplugged from the relay room. The connections from the relay rooms into the box were also disconnected and the functions transferred to York
The panels in the PSB are now disconnected and have already had parts removed. They will be removed from the box next month. The panels were decommissioned around 0030 on Sunday morning by telephone to the fringe boxes. If you were to stand in the control room as I was a few minutes ago you'd...
Sheffield PSB will remain as it's still the relay room for the area, oh and my office is in it, Brightside box is still standing and another couple from my area retained for local control of their crossings are Dodworth and Shireoaks Station.
The grey boxes are our traction gel applicators, installed for the leaf fall season to assist DBS's trains up to Stocksbridge.
The other works taking place has been to repair a retaining wall.
All the track between Barrow Hill/foxlow Junction and Seymour has or is in the process of being removed. A small amount of track was moved to Barrow Hill Yard to make the new 4th reception road on the Up side.
All plans seem to have been put on the back burner for now, there was even supposed to be plans to run the 'Bin Liner' trains down to Bolsover to replace the service to Roxby. All track from where the box used to stand towards Oxcroft and over to Creswell has been removed by contractors with a...
Along with two of my colleagues we recently completed a book for the 40th anniversary of Sheffield PSB opening, we looked at the 60 boxes closed as a result of this. It was a fascinating excercise and really enjoyed it, its certainly a great feeling when you get a copy of the completed book.
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.