• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by Jack Hay

  1. J

    Progress on Avanti West Coast's 805/807s Hitachi AT300 sets

    How are the 807s being pathed? With a top speed of 110mph on WCML they cannot match Pendolino journey times. There is some misleading marketing being put out to the general public saying that with their better acceleration than older trains, the 807s can keep up - but examination of the...
  2. J

    25kv Cheshire Stations

    I also commuted into Manchester 1971-77, on one of the diesel routes that had two trains per hour, and I can scarcely remember any cancellations in those six years. Indeed I can remember attempts to keep the service going that would never happen nowadays; running through freight loops to avoid...
  3. J

    June 2024 reopening of the line between Clitheroe and Hellifield for passenger trains

    Has anybody travelled on Northern's new service more than once? I was on the first train on opening day and I am tempted to return for another visit before the clocks go back. But I am a rail enthusiast. If the service is to continue to be viable, I think it will need some regular 'normal'...
  4. J

    HS2 Colne Valley Viaduct construction updates

    I always thought the longest bridge was the viaduct in Manchester that starts south of Piccadilly station and continues north, then west, through Oxford Road and Deansgate stations as far as Dawson Street. (And it may now be even longer, if measured from south of Piccadilly, round the Ordsall...
  5. J

    Freight derailment in Tameside (Greater Manchester), with one minor injury (06/09/24)

    It's ECS that Northern use that route for, but there is quite a lot of it. They've got to get stock for the south side diesel lines to/from Newton Heath at the start and end of each day.
  6. J

    Freight derailment in Tameside (Greater Manchester), with one minor injury (06/09/24)

    The line is the principal route for Northern to get DMUs from Newton Heath to the south side lines - the Mid Cheshire, Buxton, Marple, and so on. So it is well used for ECS. Presumably Network Rail will have to find paths for these via the Ordsall Curve instead.
  7. J

    ROSCOs and nationalisation: any ideas?

    Why have ROSCOs? Because somebody has to raise the millions of pounds required upfront to buy new trains. The government could borrow on behalf of the TOCs (most of which it controls already and will fully own eventually) but that adds to public sector borrowing which is already uncomfortably...
  8. J

    Four-tracking Crewe to Weaver Junction

    I think we should assume that if greater use is going to be made of the Middlewich line, the line speed will have to be raised as part of the project.
  9. J

    Progress on Avanti West Coast's 805/807s Hitachi AT300 sets

    I share your opinion that Avanti Voyagers ride (rode) better than XC ones and I wonder whether it is because XC turned off tilt on theirs. Voyagers were designed for tilt and the tilt mechanism provides an extra degree of freedom in the suspension. It may be that it makes them more compliant...
  10. J

    June 2024 reopening of the line between Clitheroe and Hellifield for passenger trains

    I thought so too, and I understand from a contact in Northern that they check the weather forecast a day or two beforehand to decide whether to send two coaches or four on these services.
  11. J

    Four-tracking Crewe to Weaver Junction

    There is room on railway land, I understand, to construct a flyover for the down CLC connection at Hartford LNW junction to bring it to the down (west) side of the formation, if that is a cheaper solution.
  12. J

    Four-tracking Crewe to Weaver Junction

    I agree with your general sentiment here, but if it's really £1M per point end that's installed or moved, then it's time that Network Rail's processes were re-engineered. That is getting absurd and feels like the cost base of a monopoly - no competition to allow a proper cost comparison, no...
  13. J

    London Northwestern Railway announces "Destination Manchester"

    Those are mostly very slow options that don't serve all the places the LNR London to Crewe service presently serves. It has been noticeable how the current service has been busier since it stopped running via the Stoke loop and the Northampton loop, which cost about 30 minutes added together...
  14. J

    Merseyrail Expansion

    I think the reason that the overhead option isn't being used is that means Network Rail having to do some work to install catenary and power supplies, whereas the battery option transfers most of the cost and risk to the train operator. So either DfT or NR (whoever is really making the...
  15. J

    Progress on Avanti West Coast's 805/807s Hitachi AT300 sets

    Quite right, but just see the number of local passengers doing the Warrington-Wigan hop. It can be standing room only between those two stops.

Top