possibly a misunderstanding on my part, from early press releases it looked like NR developing for own use but recent reports suggests its more of a land disposal from NR to developers for industrial estate...
slightly slow reply, but since this is the electrification thread -
Certainly for public networks it's a cost vs safety decision. Overhead lines are significantly cheaper to install. (easier to auger a few poles in than digging a long trench to the required spec & going under/over all the other...
True that it's extremely unlikely to re-used as a railwayviaduct, but it is now being maintained by a local friends group, the long term plan is to carry out some repairs and use it as a walking/cycling route. Having been up there a fww times on workdays the views are awesome.
Is the spoil on adjacent heaps suitable to build a robust embankment which will carry a loco without subsiding during torrential rain? are sheet piles or truck loads of stone required? Being in the bottom of a river valley I imagine it has quite a high proportion of fine sand/clay.
I would be interested to see a costing for this.
Working to UK health & safety law (CDM, manual handling regs, etc) means the navvies & barrows option for civil engineering on the scale of building a large embankment is a non starter even before we consider paying the navvies a living wage...
I suspect many people find the minimum connections times used on nationalrail are a bit overgenerous, especially if you're familar with the larger stations & which platforms serve which routes.
NationalRail allows shorter connections times to cross London but not for anywhere else.
Do any of...
True about the canal offering a similar route, though the steps off the A60 are a bit steep with a bike.
The embankment section is quite a wide corridor to accommodate a path, either way getting over the canal is the challenge.
Adding the walking/cycle route could unlock additional funds for the...
With regards the 1 vs 2 track Lboro central - Precispark discussion.
Whilst it is possible to walk or cycle between the two Loughborough stations, it's a convoluted route and not very pleasant following polluted narrow terraced streets. There's no bus route between them and no easy way to get to...
Indeed local and national administrations often make political capital boasting about projects conceived in the previous gov't such is the nature of long term infrastructure planning and short term political cycles.
Correct, except 'reasonably practicable' is only one type of statutory duty, the full list are ( I think)
Absolute
Qualified
Practicable
Reasonably practicable
RP, the lowest, allows the duty holder to argue a control measure would have been unreasonable on grounds of cost. It only...
From your mention of central support you're referring to the MML bridge not the canal bridge?
The route immediately south of the MML bridge site is constrained between a waterway/floodplain and a factory & it's carpark.
Between the two bridges, there is some Severn Trent infrastructure...