• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by eldomtom2

  1. E

    Trivia - Most dangerous railway company.

    ...all of which were true of the pre-nationalisation companies, except more so, often significantly more so the further back you go. The OP's question is pretty much impossible to answer since for starters it'll vary depending on the time period, traffic levels, location, etc. A "fair"...
  2. E

    What I think is wrong with current OHLE electrification practice

    However, pretty much any infrastructure project in the UK costs more than it does in other European countries. The railways share some blame, of course, but it's clear that there are other factors outside of their control here.
  3. E

    Getting the most out of the new Alstom units for TPE?

    If we're talking about the UK as a whole there's quite a lot - electrifying 100mph or above lines would mean doing the GWML (via both routes) up to about Starcross, the MML, and the Cross Country Route. Of course if we're talking about TPE specifically there isn't much, but it could benefit...
  4. E

    Getting the most out of the new Alstom units for TPE?

    "High power draw sections" would also include sections of high (100mph+) speed, am I right in assuming that?
  5. E

    What I think is wrong with current OHLE electrification practice

    Well, this isn't evidence that batteries are going to get us out of electrifying the remaining unelectrified main lines, though. As you say, BEMUs are pretty much entirely used on secondary routes. GBR's rolling and infrastructure strategy recognises this, and says that about 25% of the...
  6. E

    What I think is wrong with current OHLE electrification practice

    Well, when you compare it to other countries, somehow I suspect the cost in the UK for battery trains and charging equipment will also be grossly expensive compared to what it should be. The causes of high electrification costs in the UK are not electrification-specific.
  7. E

    Batteries and the Geopolitical Situation

    The new GBR rolling stock and infrastructure strategy reaffirms a focus on battery-electric and electric trains as the future, planning primarily for batteries with around 25% of the currently unelectrified network being electrified. It is noted that full electrification will remain the...
  8. E

    What efficiencies could GBR bring?

    According to @hwl, who seems knowledgable on the topic, there is now a local charging standard specifying OHLE or third rail, so one would hope that will be used for the TPE charging facilities - if nothing else, it would ensure compatibility with potential other models of BEMU:
  9. E

    Meaning of "ES in rr" service type abbreviation in early 1950 London Midland engine diagram

    The final column is the crew turn, i.e. (8A/266) means it was worked by an Edge Hill crew on turn 266.
  10. E

    Meaning of "ES in rr" service type abbreviation in early 1950 London Midland engine diagram

    I have recently purchased facsimiles of Crewe North and Crewe South Engine Working booklets from the early 1950s. Most of the abbreviations for train types are fairly obvious, but "ES in rr." has completely stumped me. "ES" on its own is definitely empty stock. I have asked RMweb and haven't...
  11. E

    What efficiencies could GBR bring?

    Is it? I don't believe that's officially planned, or at least I can't find anything saying so.
  12. E

    What efficiencies could GBR bring?

    There's a big asterisk there and that's that they're only intended to go 45 miles off-wire between charges to not strain the batteries. A return journey on a line of 45 miles is evidently considered too long for a BEMU to make on its own without charging at the end.
  13. E

    What efficiencies could GBR bring?

    I see them on regular UK-focussed pages, not railway-focussed at all!
  14. E

    Brightline reported close to bankruptcy

    Most Shinkansen services are operationally profitable.
  15. E

    What efficiencies could GBR bring?

    I invariably see complaints about the continued existence of the ROSCOs on any social media post about GBR...

Top