• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by E6007

  1. E

    4O21 Trafford Park Euro Terminal to Soton W Docks

    4O21 does seem to have been diverted via Bletchley and Oxford. See https://www.realtimetrains.co.uk/service/gb-nr:H01095/2026-06-24/detailed
  2. E

    HS2 TBM Progress

    MBR is Material by Rail, a hang over from earlier in the project when we at TfL were putting pressure on HS2 to move material by rail (in and out) instead of putting it all of Euston's on the local roads
  3. E

    East-West Rail (EWR): Consultation updates [not speculation]

    Could somebody provide the link to the thread for bringing the Bicester - Bletchley section in to public service please?
  4. E

    HS2 Old Oak Common

    Opening of the GWR part of the station is dependent on the significant work to route the tracks through the new station platforms. As I understand it, there are two blockades programmed for Christmas 2026 and Christmas 2028 to achieve this.
  5. E

    Class 730 LNR & WMR Delivery/test Updates

    Started on the 16:34 to Tring having arrived from Bletchley at 15:41; returned empty to Euston as booked
  6. E

    Class 730 LNR & WMR Delivery/test Updates

    Who are the maps for? Passengers or enthusiasts?
  7. E

    East-West Rail (EWR) countdown to entry into service

    Blame it on DfT for not appointing the operator earlier. They should be looking at the overall programme and making things happen
  8. E

    Class 730 LNR & WMR Delivery/test Updates

    Will it run tomorrow? Apologies if this is posted elsewhere but tomorrow we have: https://www.realtimetrains.co.uk/service/gb-nr:S37704/2025-06-09/detailed 3W51 14:40 Bletchley TMD to Euston followed by https://www.realtimetrains.co.uk/service/gb-nr:L33507/2025-06-09/detailed 1W51 16:19 Euston...
  9. E

    HS2 Old Oak Common

    All very easy in normal operation but if either the main or relief lines are closed during maintenance or service perturbation, both would need to use the same platform if they are to call.
  10. E

    East-West Rail (EWR) countdown to entry into service

    The lack of urgency was at DfT in the time taken to appoint Chiltern as operator. Only then could they start to recruit staff etc as well do the physical fit out. While Bletchley High Level needed such work, West Midlands Trains operates the whole station. Winslow is the only new one.
  11. E

    East-West Rail (EWR) countdown to entry into service

    Had a presentation from a Chiltern Stakeholder Executive on Wednesday. Apparently fitting out of Winslow station is holding up service introduction
  12. E

    Unusual Avanti working at Cheddington today

    It was working 1S37 0603 Euston to Glasgow on Saturday morning when it became disabled. https://www.realtimetrains.co.uk/service/gb-nr:C49501/2024-12-28/detailed#allox_id=0 A rescue was attempted Saturday afternoon but failed. I don't know why.
  13. E

    Storm Bert Saturday 23rd November

    Watch latest Green Signals episode for some explanation if needed. Emergency signalling through Northampton until end of week. Therefore can't extract units from Northampton depot etc.
  14. E

    Euston overcrowding

    Believe it was London Underground that wanted the arrangement changes so they could close their station at times of disruption and overnight
  15. E

    East-West Rail (EWR): Oxford-Bletchley construction progress

    and 168323 and 168328 have been allocated to 5Z01 https://www.realtimetrains.co.uk/service/gb-nr:S79733/2024-10-21/detailed#allox_id=0

Top