• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by DimTim

  1. D

    Are TOCs obliged to state the reason for a delay?

    I noticed this in platform announcements on Wednesday, at Leeds, Carlisle & Doncaster. After announcing the xx.xx to yyyy is running 10 minutes late, this is due to zzz. I heard late running preceding train or unable to join (2 x 5car Azumas on Skipton train)
  2. D

    Direct rail connection between Mansfield and Sheffield

    Sheffield station is not ideally placed to suit shoppers or people looking for social meeting purposes (Other than The Tap!). I would think Shirebrook, Cresswell & Whitwell punters are likely more attracted to Meadowhall!
  3. D

    Class 810 for East Midlands Railway Construction/Introduction Updates

    Are we likely to see the introduction of class 810 before EMR is absorbed by GBR? You wonder if EMR senior management can‘t wait for the day to come soon enough!
  4. D

    Wigan to Bolton electric services

    Why is the power changeover remaining as the test trains were electric from Wigan NW?
  5. D

    Class 810 for East Midlands Railway Construction/Introduction Updates

    What is the total order. How many units have been completed by Aycliffe, how many delivered, how many accepted by EMR?
  6. D

    Azuma 800108 heading down to St Pancras

    Are we aware if the Azusa used the overhead south of Wigston at all? Either way?
  7. D

    Class 93 Tri-mode Loco

    There are paths both Monday & Tuesday nights for light engine runs to Carlisle & return 0Q06. 0Q42
  8. D

    HS2 trains - Interior design

    But these are not built as yet - there aren’t spare cab carriages that need storing.
  9. D

    HS2 trains - Interior design

    The original concept was that there would be 2 HS2 ‘sets‘ coupled together potentially splitting to serve 2 destinations. As no platforms have been constructed as yet on HS2 & most trains will now run on existing lines has any consideration been given to train lengths? I see press comment...
  10. D

    GBRf Class 99 - 30 locomotives now ordered

    There is also the need to be suitable for diversionary routes when electrified routes are ‘blocked’ eg Settle/Carlisle, Gainsborough/Lincoln/Spalding
  11. D

    Problems in the Sheffield area (30/05)

    Could Cross Country have run ’Old Road’ Masborough to Chesterfield? Do drivers sign this? Sheffield passengers could have detained Chesterfield & returned north.
  12. D

    Does the location of some depots detract from the running of the railway?

    Out of interest does the driver having worked from Nottingham then work the 0748 departure to Norwich after say 30 minutes break?
  13. D

    First Group Sheffield - London via Retford open access proposal

    For 2 return services per day & being faster than East Midlands Railway I.e. 2 hours then it’s only likely one unit will be required. One return journey AM, and another PM. Diesel to Retford & electric to Kings Cross, changeover in platform at Retford.
  14. D

    Class 66 and Felixstowe Intermodals.

    BBC tracked a container some years ago https://en.wikipedia.org/wiki/BBC_Box#:~:text=The%20Box%20or%20BBC%20Box,a%20special%20one%2Doff%20livery.
  15. D

    What if ULEZ applied to the railway?

    With the expansion of the ULEZ zone today, if this applied to the railway & diesel engines were banned within the ULEZ zone which services would be affected? I’m aware Marylebone is not electrified & there would be a big issue for freight but which other services would be affected & what...

Top