    Midlands Rail Hub 20m extra seats

    Reinstating Platform 4 at Snow Hill Reinstating Platform 2 & 3 at Kings Norton Four tracking and electrifying from Cofton jnc (near Longbridge) to Barnt Green
  2. C

    Midlands Rail Hub 20m extra seats

    https://mrhalliance.co.uk/consultation
  3. C

    Midlands Rail Hub 20m extra seats

    The rail systems and civils designs need doing first - Only an outline design has been produced. End of 2027 could be a good target date for installation or spring 2028, but that's just me speculating.
  4. C

    Northern stopping services Stoke on Trent to Manchester

    There is an ongoing study looking at introducing 4-car Class 350 trains into the bay platform. Moving the platform signal, 3m platform extension and squeezing the minimum stopping allowance.
  5. C

    Is there room for a "Platform 6" at Birmingham Moor Street?

    The bulk of the platform build-out will be to the east of Park Street. It's proposed that there'll be no platform B and A over the New Street approach.
  6. C

    Is there room for a "Platform 6" at Birmingham Moor Street?

    Yes - The platforms on the "Up" side / HS2 side of the station will be "B" and "A" Platform 5 will be reinstated and a siding will be installed where the OP thought (rightly) a Platform 6 would be too tight.
  7. C

    York 3rd Line Works

    On whose part? Network Rail has a budget for enhancements and if it is forecast to be an overspend then some projects will be paused. Other projects will be more developed so will be seen out to completion. 1729532724 Tens of new OLE structures have been installed to facilitate the third line...
  8. C

    York 3rd Line Works

    TOCs like the operational flexibility but Network Rail doesn't like the capital cost and ongoing maintenance liability of an extra pair of points in a tight spot. One principal aim was to remove the need for the Leeds via Harrogate service to run on the ECML Up & Down lines. 1729156986 Yeah -...
  9. C

    York 3rd Line Works

    A new deck on new abutments on the Siemens depot side of the road. It's a bit tight! 1729097356 Access will be provided for Platform 8. The P8 link to the York Down Fast line is currently proposed to be removed, but there are a few options for the link to be retained with a new alignment...
  10. C

    Ashley Down station construction updates

    Possibly this system is being used:
  11. C

    Heritage railway track and the two second rule?

    Is the two second rule the design standard that says (geometrical) element lengths should be no less than 2 seconds at line speed? A lot of the national network doesn't achieve that either and over point work it won't apply as you're constrained by S&C geometry. I've not heard a definitive...
  12. C

    HS2 High Salaries - Value?

    That's the headline-grabbing figure but what about all the other roles matacaster listed?
  13. C

    HS2 High Salaries - Value?

    Can you provide some figures for these roles? Otherwise it's a baseless argument.
  14. C

    Northampton to Milton Keynes closed in September

    An aerial view of the North connection works at the top of the page with the depot on the right.
  15. C

    Trivia: Platforms on one 'fast' line but not the other?

    Bedford (MML) has a platform on the Down Fast but not the Up.