  1. B

    What does 6 and 3 stub platforms at Euston mean for hs2?

    25 minutes to clear, clean, check and board a 400m long train is not long
  2. B

    What does 6 and 3 stub platforms at Euston mean for hs2?

    So that’s really three trains every two hours not two trains an hour
  3. B

    What does 6 and 3 stub platforms at Euston mean for hs2?

    Is that 30 minutes for doors open to doors closed or is that 30 mins for the entire platform section occupied to entire platform section cleared. If anyone could provide a minute by minute breakdown to help me understand I’d be grateful.
  4. B

    What does 6 and 3 stub platforms at Euston mean for hs2?

    My concern is that it will only take one train with some vomit requiring a deep clean or a computer fault requiring a full reset and we’ll still have the same resilience or near the same resilience just because we didn’t spend enough on Euston
  5. B

    What does 6 and 3 stub platforms at Euston mean for hs2?

    But isn’t the experience from Spain and elsewhere that once one major city has it, then the demand becomes overwhelming. Also, isn’t it cheaper to build passive capacity at Euston now rather than building an east coast mainline bypass in thirty years and the whole point of the y route was to...
  6. B

    What does 6 and 3 stub platforms at Euston mean for hs2?

    Yes but the powers that be be might want to build an eastern leg in forty years time and they’ll be livid if we haven’t built enough platforms now
  7. B

    What does 6 and 3 stub platforms at Euston mean for hs2?

    But wasn’t the whole point of hs2 meant to be a game changer in that not only would the network be resilient and recover there was a leaf on the line but also if a train is out of sequence because of a passenger falling sick etc.
  8. B

    What does 6 and 3 stub platforms at Euston mean for hs2?

    What I’m trying to understand is what is now impossible given that Euston was once going to be 11 full length hs platforms but now it is going to be 6 full length plus 3 250m “stubs”. The correspondence says that is going to allow for 16tph but my understanding was that the original was designed...
  9. B

    What does 6 and 3 stub platforms at Euston mean for hs2?

    Now that we know that Euston is going to probably be 6 full platforms plus 3 250m stubs. What are the long term implications for further extensions and the length of those services?
  10. B

    Guardian reporting potential NPR "formal revival"

    So this really is “government maintains current policy of maybe doing something in the future” announcement
  11. B

    Guardian reporting potential NPR "formal revival"

    In terms of urgent decisions rather than mere aspirations, what does this mean for platforms for Euston and the scope of the rebuild. Is Peter Hendy furiously lobbying for a proper rebuild?
  12. B

    Guardian reporting potential NPR "formal revival"

    So unless the government says it’s putting up the funding, this is all bread and circuses? 1755151497 So not a through station?
  13. B

    Guardian reporting potential NPR "formal revival"

    Will it be npr light going through huddesfield or npr proper with an underground station at Manchester and a route via Bradford? Or have they even decided
  14. B

    GB should have a national clockface timetable

    Separate dedicated freight lines!
  15. B

    GWR Advance tickets down to Cornwall mystery

    Dear All, Does anyone know why GWR are not releasing tickets down to Cornwall between Wednesday 9 August until Monday 14 August inclusive https://www.gwr.com/your-tickets/choosing-your-ticket/advance-tickets With best wishes, JC