• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by Adlee Turner

  1. A

    Door operations across passenger trains

    231/756s are, at the moment, guard open/ guard close. 398s are DDO (Driver Door Operation) unless in degraded, then it’s FCDO (Full Conductor Door Operation). The door protocol for the 398s will then pass onto the 231s & 756s in the future.
  2. A

    Transport for Wales Class 231 / 756 Stadler FLIRTs

    Yeah, in the end 5Q02 was just 231001 on its own. It was in the platform at Rhymney ready to couple up but unfortunately, 231003 didn’t have enough power to shunt from the sidings so was left there. Luckily, a technician came later and fixed a part and it ended up travelling down later that day...
  3. A

    Transport for Wales Class 231 / 756 Stadler FLIRTs

    For anyone interested, there will be an 8-car 231 tomorrow from Rhymney sidings to Cardiff Canton (231001 + 231003) due to leave at 13:17 on 5Q02. Usually it is normally 1x 231 but due to 231003 failing during morning prep in Rhymney sidings Saturday morning, it requires rescuing...
  4. A

    Different Guard Depot, Route and Traction cards

    We have both conductors and drivers based at Taffs Well. Conductors based at Taffs Well right now, book on there and travel to Cardiff to collect their equipment.
  5. A

    Transport for Wales Class 231 / 756 Stadler FLIRTs

    No timescale at the moment unfortunately. All depending on how the 398s will do. The test runs tonight were with both a mainline and valleys driver and guard.
  6. A

    TfW class 398 Stadler Citylink tram trains

    All valley crews (Cardiff, Treherbert, Barry, Taffs Well & Rhymney) are all trained on 756s so it’s just waiting for testing of the 756s on the Rhymney line to be complete and authorisation of them into passenger use on Rhymney & Bargoed services.
  7. A

    Transport for Wales Class 231 / 756 Stadler FLIRTs

    Apparently 231002 and 756108 are both currently working to Pontypridd on 5Q40 from Cardiff Canton then back to Central and to later return from Central on 5Q41 and return back to Cardiff Canton. Not sure how true it is for both of these to be operating together but according to internal...
  8. A

    Transport for Wales Class 231 / 756 Stadler FLIRTs

    There’s a BTET in place on the Coryton line due to engineering works on the Rhymney line and unfortunately, the 756s were losing time as the signaller had to inform each driver to ban the pantographs before they entered the Coryton line
  9. A

    TfW withdrawals (Now just 150/158s to go)

    I believe the issue with 231s on the VOG is they are too big for the bay platform at Bridgend hence the reason for the 3 car 756s being used. At the moment, it’s still up the air in terms of who’s going to be doing the VOG going forwards whether it be valleys or remain mainline or mixture of...
  10. A

    TfW withdrawals (Now just 150/158s to go)

    The 231s will be operating to Maesteg, Cheltenham and Ebbw Vale. Only the 3 car 756s will operate to the Bridgend via the VOG. 1766111693 150251 was back out last night working 2R60 to Rhymney where it stabled overnight. 1766111888 Unfortunately, we’ve had an internal brief stating that we can...
  11. A

    Transport for Wales Class 231 / 756 Stadler FLIRTs

    231005 aka Gavin and Stacey is back in service today
  12. A

    South Wales 'Metro' updates

    It is mainline crew that operate the VOG services. Although, it is still up in the air at the moment on who’s going to be doing what in terms of valley line crews doing the VOG services alongside mainline crews or just solely valley crews or if mainline crew will get trained up on the 756s.
  13. A

    Transport for Wales Class 231 / 756 Stadler FLIRTs

    As far as we know, it was going to be early December for 756 testing up to Rhymney
  14. A

    South Wales 'Metro' updates

    Where platform 2 at Rhymney is supposed to go is where the current crew depot is so there is plenty of room for the OLE
  15. A

    South Wales 'Metro' updates

    At the moment, it’s all gone quiet in terms of the second platform at Rhymney

Top