• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by 47296lastduff

  1. 4

    Padiham Power Station C More Details

    Looking at the area on a 1960s OS map, the site looks somewhat hemmed in, and there may simply have not been enough space to create an MGR loop. These need a very large chunk of land to fit in.
  2. 4

    Padiham Power Station C More Details

    Run round loop-loco detaches from train and runs forward to headshunt. Points are changed and loco runs past train on adjacent line. Points are changed again, loco reverses onto rear of train.
  3. 4

    Dalston Junc to Hackney closure

    The official closure date was 04/07/66, but the connection had already been severed 02/01/66, and the last use of the curve was on 01/03/65.
  4. 4

    Old London Underground trains

    Thanks for the replies. As I remember it, when I first saw these trains there were no signs by the doors, and that was why I wondered what was allowed or prohibited. This was well before the first health and safety laws of 1974.
  5. 4

    Old London Underground trains

    Recently I read a crime novel set in the 1950s, where a suspect was pursued by police on an LU train. He opened the door at the end of car and the door to the next car to enter it as part of his attempt to evade them. This reminded to me of being on such trains in the 1960s, and seeing some...
  6. 4

    Manchester area steam sheds

    I think Agecroft was mainly/entirely goods work. Patricroft did North Wales and Liverpool from Man Exchange (not Vic), also things like the portion to Wigan for the overnight Liv to Glasgow..
  7. 4

    Confusing departure board at Crewe

    I was caught out at crewe last month, wanted a train to Chester. Departures board included a train to Shrewsbury, no interest to me. It turned out that the train was for Shrewsbury via Chester as I found out too late.
  8. 4

    Steam loco 65033

    Many people define the identity of a steam loco as being in its mainframes. Because this loco's frames were condemned as beyond repair a while ago, new frames have been obtained. Does this make 65033 a new-build replica as opposed to an an actual restoration? To assist in thinking this...
  9. 4

    Funny - but clearly not correct train lengths

    I remember being at Crewe one afternoon about 3 years ago, and hearing the announcement that the next train for Chester would leave from platform 9, formed of 22 coaches. It was actually a 2-car set, which fitted comfortably in bay platform 9.
  10. 4

    CrossCountry Voyager Has Toilet Door Cut Off

    It's not just toilet doors. Last year I left my seat in a class 67 hauled Mark IV in plenty of time to reach the vestibule, to leave the train. I few others got through the door to that area, then it closed in front of me. The push button did nothing, so I tried to slide the door open manually...
  11. 4

    What are the advantages and disadvantages of Diesel v Electric?

    Southern Railway managed massive electrification without the problems of overhead wires. The system still seems to work very well.
  12. 4

    Trivia: Unusual or Amusing Messages to Passengers

    A few years ago at Crewe it was announced by an automated voice that the (xxxx) to Chester will depart from platform 9. This train has 22 carriages.
  13. 4

    Farewell to the Kings Railtour, 28/04/63

    I can see now that 6018 doing the tour, and going into Works are two different stories, so it must have been taken out of storage with minimal attention needed. I understand that some of the class had full general overhauls early in 1962, then all withdrawn within months, so they must have been...
  14. 4

    Farewell to the Kings Railtour, 28/04/63

    Thanks Harvester, that makes it clear, the repair and repaint being done already for Butlins, so no significant further cost prior to the tour.

Top