Also how come the trains between Hebburn and Pelaw did not run yesterday? I assume it was too dangerous to run trains or something with engineers near by?
I think there was a failed train as well between Pelaw and Hebburn, which was lumped in with the larger problem on the Sunderland extension. A Nexus employee I know was stuck on one of the trains which was sent back to Hebburn and everyone told to get off
Paul_10 said:On the refurbs, its been reported that 4072 was seen yesterday on the system heading through the tunnels in Newcastle towards Gateshead so the rumour that the air con was too big for the powerlines was false - Of course Huw rubbished this on the Nexus forums.
I'm not sure which eejit came up with this but they musn't realise there is something much larger on the top of the car - i.e. the pan. Although the air con unit looks hideous, it is quite clear that it fits within the former kinetic envelope before.
swt_passenger said:Surprisingly, the electrical control room that covers the section is in York.
Not totally sure but I would expect it would be at Tyneside IECC, although South Gosforth control has a direct emergency line to Tyneside. All radio comms are definitely Tyneside.