I'm frequently messing around with Excell spreadsheet timetables for various parts of Wales (particularly the south, but also other parts), largely just out of interest to see if certain enhanced frequencies would be possible given infinite rolling stock. However, to be sure what I come up with would really work I'd need more information on the headways available.
One major example is the South Wales Main Line portion of the GWML. I found something here which says "On the basis of 4-6 minute headways we can identify at least 6 fast (20 minute) and 4 slow (30 minute) all stations or freight paths between Bridgend and Cardiff." The scenario I've made up from that is four fast passenger trains per hour (calling at Bridgend and Port Talbot) between Cardiff and Bridgend and two all-stations, with the remaining four paths (2 fast 2 slow) reserved for frieght. Of the passenger services, 3 fasts (one each from London, Bristol and Manchester) would continue to Swansea (calling at Neath also) and one to Carmarthen/Fishguard/Milford Haven via the Swansea District Line. One slow would be the Maesteg service, the other an hourly Cardiff - Swansea all stations 'Swanline' service.
The thing is, the Swanline takes 1hr 13min and the faster Swansea services 54min. This means I don't seem to be able to timetable the fasts without them overtaking the stoppers somewhere. Assuming the link above is correct in saying there are 10 paths per hour, where are the passing loops to permit that (I know I've seen a loop in the middle of nowhere while traveling on the line, but can't say exactly where)? Certainly, I've never noticed a loop at a station for stoppers to wait in to be overtaken. That link also only covers Cardiff - Bridgend, so maybe the headways further west are less capable.
Thanks in advance for any information on the capability of the rail infrastructure in this, and other parts of Wales, you can provide me with.
One major example is the South Wales Main Line portion of the GWML. I found something here which says "On the basis of 4-6 minute headways we can identify at least 6 fast (20 minute) and 4 slow (30 minute) all stations or freight paths between Bridgend and Cardiff." The scenario I've made up from that is four fast passenger trains per hour (calling at Bridgend and Port Talbot) between Cardiff and Bridgend and two all-stations, with the remaining four paths (2 fast 2 slow) reserved for frieght. Of the passenger services, 3 fasts (one each from London, Bristol and Manchester) would continue to Swansea (calling at Neath also) and one to Carmarthen/Fishguard/Milford Haven via the Swansea District Line. One slow would be the Maesteg service, the other an hourly Cardiff - Swansea all stations 'Swanline' service.
The thing is, the Swanline takes 1hr 13min and the faster Swansea services 54min. This means I don't seem to be able to timetable the fasts without them overtaking the stoppers somewhere. Assuming the link above is correct in saying there are 10 paths per hour, where are the passing loops to permit that (I know I've seen a loop in the middle of nowhere while traveling on the line, but can't say exactly where)? Certainly, I've never noticed a loop at a station for stoppers to wait in to be overtaken. That link also only covers Cardiff - Bridgend, so maybe the headways further west are less capable.
Thanks in advance for any information on the capability of the rail infrastructure in this, and other parts of Wales, you can provide me with.