The wheel/rail interface is dynamic and both are reliant upon one another.So it is said, but no one really ever explains why, other than with a mixture of nostalgia and dissatisfaction with present arrangements. The fact is that any business model can work - you could make track the responsibility of local primary schools if you wanted - so long as the responsibilities, relationships, regulations and interfaces are clearly defined and legally implemented. .
The present system is far from being fine by any standards, and is only popular with those who do not have to manage within the vagaries of the system, by those who hold some nostalgic view for BR and those who have a naive political view that somehow we are almost back to a form of BR.
The cost of even the simplest renewals is driven up to astroniomic proportions by the insistence of Network Rail micro-managing everything. This is made worse by some of the most appalling tenders and contracts you would ever wish to see, which are so woolly and badly written that the result is that even NR Procurement and Contracts staff do not understand what the Contract actually is - how therefore is the Contractor to perform properly ?.
Most issued Tenders are in no way representative of the actual work to be carried out, and Contract award processes are biased towards headline price rather than taking a more inclusive view of competence and quality, that is why so many small Companies and labour agencies are doing so well. Anyone can take a man and put him through a training course (which he of course pays for) and demonstrate "competence". What they cannot do is to demonstrate experience and knowledge, and this is seen when things start to go wrong.
I have heard a tale about one small Contractor who used NR approved labour agency staff to carry out a track renewal and physically forced the pandrol clips into the housings not realising that the new rail was UIC 60 rather 113lb - and worst of all they handed the track back. When the person who told me the story later challenged this pointing out that NR had supplied the wrong sleepers, he was threatened with removal from the job and being blacklisted by the Company.
The NR representative themselves were unable to identify that the wrong sleepers had been used.
Next lets look at rolling stock approvals. This process is an absolute joke, it is costly and smacks very much of the not invented here syndrome. The outcome is that it costs a fortune for anyone to introduce new rolling stock, and the transfer of rolling stock between lines is similarly impeded.
People here suggest that private companies would reduce maintenance to an absolute minimum. Well they need to open their eyes, read a few RAIB Reports and go and do some checking to find that NR have reduced maintenance staff numbers to save money and have reduced maintenance levels for the same reason. Based on track quality and normalised it now costs more for NR to maintain the track at a lower Standard than under the previous Railtrack system. Cost reductions have been spun as arising from the removal of Contractors but in actual fact were and are achieved by reductions in maintenance, the extension of renewals periods and the cancellation of renewals works. Cost savings are also being made by forcing the major Infrastructure Contractors to continue with extended recertification training courses at approved centres which can take 1, 2 or 3 days whilst at the same time allowing their own staff to be re-certified during a cup of coffee and a chat.
The use of Contractors has not reduced, in fact it has increased as former employed staff have been replaced by cheaper labour agencies. These make the men pay for their own training courses and give them the cheapest of the cheap PPE. In most cases they also have to pay the costs of the tools they use.
Other arguments are about safety which are so naive as to not even justify a response.
Lets now look at track access. Why is it cheaper for DBS to operate practically all their freight using diesels even when it is hauled completely under the wires ?
The track maintenance current regime is stilted towards performance over safety, and the perverse incentive that recompenses TOCs/FOCs for route closures even when there will be no affect on train services. In a properly vertically integrated system this would be sorted out between the Engineers and the Operations department, and I have given examples of this perverseness many times on here before.
I have now worked under BR, under Railtrack, under Network Rail, on systems fully franchised out (ops and engineering), and on systems which are fully privately owned and operated, some of which have shared running and exchange arrangements with other Companies and some which operate passenger services as well. Taking all of this experience, it is clear to me that the only way to get things to some form of normality is the vertical integration model which has no State inteference, other than for the setting of strategy, and the overview and enforcement of safety standards.
Arguments about Companies not working together are ridiculous, one only has to look at North America for example where trains run with traction units from various Railroads, and Railroads have all sorts of co-operation even to the extent of providing diversionary routes, traction (if necessary) and traincrew.
There are various groupings where common train operation standards and research is carried out, and where track, and signalling standards are co-ordinated.
Similar but slightly different arrangements apply in South America, and those who travel to Europe will be well aware of the inter-Country trains and freight services that operate without problems.