swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,284
So why does the earlier correspondence from NXEA to NR refer specifically to their proposal to use the class from Ipswich to Norwich from Dec 2010?

It seems to me from the set of three letters on NR's site that NXEA applied, and NR agreed - there's no other explanation of the wording used...
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,058
Location
Reston City Centre
One of the proposals from the Manchester Hub project would see the Liverpool - Manchester Airport diverted via Warrington Central, and some TPE sevices to Liverpool running via the Chat Moss. So, the first phase of electrification would need only 2 EMU's for Liverpool - Manchester Victoria, plus 2 more for Liverpool to Warrington Bank Quay (or Manchester) . Say 6 EMUs including spares.

Liverpool to Wigan / Blackpool will be completed later, and with present service levels would need about another 7 EMUs plus another spare or two. More EMU's would be needed when Manchester - Blackpool electrification is completed.

You may well be right - the slow build of the Lancashire routes means only a handful of EMUs will be needed in the short term
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
So why does the earlier correspondence from NXEA to NR refer specifically to their proposal to use the class from Ipswich to Norwich from Dec 2010?
There are enough restrictions on 360s north of Ipswich, well Stowmarket, to make their use not worthwhile. The 1702/1930 has always been planned to be 321s then 317s since Plan A.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,842
Vehicle Change is a contractual process that alters the 'specified equipment' that an operator wants to use on a given route. Other operators can object.

But just because the operator wants to run a certain type of train, and everyone agrees they can, doesn't mean it is comaptible with the infrastrcture. So the operator then has to make it fit, either through proving it does through various studies, or by paying Network Rail to make the infrastructure compatible.

The route was certainly not clear to Norwich for Class 360s at the start of the Dec 2010 TT. There were some gauging issues, and under certain electrical feeding scenarios having 2 x 12 car 360s in section would cause the lights to go out in deepest Norfolk. So back then the signallers at Colchester were under direct instructions not to clear signals for them to go north of Stowmarket.
 

SprinterMan

Established Member
Joined
20 Sep 2010
Messages
2,341
Location
Hertford
It seems someone knows what is going on.....

http://railwayeye.blogspot.com/

Railway Eye - the railway blog said:
Of course an initial fleet of 9 x 4-car Class 317/7 sets is due to become available in February 2012, released by Abellio Greater Anglia. Once these have been put through a heavy overhaul to make them PRM-TSI compliant they will be ready to start work in 2014 for Northern Rail.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
There were some gauging issues, and under certain electrical feeding scenarios having 2 x 12 car 360s in section would cause the lights to go out in deepest Norfolk.

Wht would a train drawing power affect oil lamps and tallow candles? :lol::lol:
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
One of the proposals from the Manchester Hub project would see the Liverpool - Manchester Airport diverted via Warrington Central, and some TPE sevices to Liverpool running via the Chat Moss. So, the first phase of electrification would need only 2 EMU's for Liverpool - Manchester Victoria, plus 2 more for Liverpool to Warrington Bank Quay (or Manchester) . Say 6 EMUs including spares.

Those changes aren't simultaneous ones though.

From 2014 the following can be EMU operated:
* Victoria - Lime Street 2tph (the Bank Quay service is being diverted/extended to Victoria)
* Airport - Lime Street 1tph
* Wigan - Lime Street 2tph

From 2016 when other routes are electrified and the Ordsall Chord is opened the Airport service will be diverted via Warrington and TPE services will go in to Victoria, freeing up the EMUs on Airport services. However, the freed up ones can be redeployed on the Liverpool/Manchester to Preston/Blackpool services.
 

hairyhandedfool

Established Member
Joined
14 Apr 2008
Messages
8,837
Very interesting, but will it really take two years to refurbish these EMUs? Surely you could either build new EMUs in that time (allowing the 317s to remain in revenue earning service) or reserrect a 508 in that timescale!

Well, if they are completed inside six months they'll be surplus to requirements for around 18 months!
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,284
Very interesting, but will it really take two years to refurbish these EMUs? Surely you could either build new EMUs in that time (allowing the 317s to remain in revenue earning service) or reserrect a 508 in that timescale!

18 months to write a spec, issue an ITT, select a bidder, then a short pause while someone organises a massive protest because Bombardier don't win (even though they don't bother bidding.)

Yeah, 2 yrs is probably just about enough... :roll:
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Rumour going round does seem to be these will be going to Northern as an interim due to delays in the 319's.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
and if the rumour's repeated enough in one thread, it might even become "fact"
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,058
Location
Reston City Centre
Well, if they are completed inside six months they'll be surplus to requirements for around 18 months!

...in which case it makes more sense to keep them on the GEML for at least another year, surely?

This is a serious point, because there are quite a few units that will need a fair bit of work done on them to comply with regulations post 31 December 2019.It'll be bad enough for the overall network to be without a dozen 150s at a time whilst they are converted, but if it's going to take eighteen months... we might as well give up now

18 months to write a spec, issue an ITT, select a bidder, then a short pause while someone organises a massive protest because Bombardier don't win (even though they don't bother bidding.)

Yeah, 2 yrs is probably just about enough... :roll:

Its funny because its true...
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
...in which case it makes more sense to keep them on the GEML for at least another year, surely?

The problem is a lack of funds. When Northern got the extra 158s they took 12x142s out of service and put them in to warm storage, which FGW later took on. I think it would have been very easy to find 12 peak time Northern services that needed extra capacity but there weren't the funds to keep them in use so the passengers continued to suffer.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,058
Location
Reston City Centre
The problem is a lack of funds. When Northern got the extra 158s they took 12x142s out of service and put them in to warm storage, which FGW later took on. I think it would have been very easy to find 12 peak time Northern services that needed extra capacity but there weren't the funds to keep them in use so the passengers continued to suffer.

I don't know the maths, I don't think anyone on here does (or can divulge this kind of commercially sensitive information), but if the GEML is as busy as is being said by many on here then it seems strange that they don't want to get use out of them for another year or so (since they won't be needed in Lancashire for a couple of years and surely only need a couple of months work to modify them).
 