Should be self financing, they just extend an existing service which terminates in Rochdale rather than an additional service.
Should be self financing, they just extend an existing service which terminates in Rochdale rather than an additional service.
Could add a couple more to the diagram to balance out, they should be able to scrounge up a couple of diesels, especielly once electric stock comes in to free them up. Its cheaper than adding a whole new service.
From where exactly?
Centro's masses of stock?
I agree with WatcherZero - it is far to early to even consider services. There will be many timetable recasts before the first works are even started.
Is it double tracked? I guess it's signalling, rather than actual trackwork and labour costs.
And of course, consultancy, legal fees, contingency and contractor margins if applicable, I guess. Stupid country.
Signalling is the main one.
Even so £8.8 million does seem to be like talking telephone numbers. As a lay member of the public, I cannot grasp why signalling 500m of track has to be so expensive.
At prices like this one understands why so little improvement seems to be perceived by the public for all the money that is invested in the railways.
McNulty is demanding that Network Rail acts more efficiently. Attempting to bring this project in way under budget would be a good start. It is really only a minor project and one that NR should be able to get a good grip on.
I'd rather see regular extensions of the Victoria - Clitheroe service to Lancaster or Carlisle before SELRAP.
A lot of money is spent and some of it is wasted. I would need the breakdown but certainly £1 million goes on consultancy fees from birth to completion. /QUOTE]
I'm not surprised to read that £1 million will go on consultancy fees, but then I also have the reaction "What consultancy fees ?"
Why does Network Rail employ consultants at all ? Why can't they design all this with their own staff ? Surely they are up to doing that or was all that expertise sold off years ago. Very very sad if it was. We are paying a high price for that decision now.
double track until it was ripped up in the early 1970's prior to resignalling under the Preston scheme.Was the previous align single or double track?
Unlike many "armchair" theoretical forum users, I am quite prepared to go and see some of the possible alternatives available between Preston and Burnley, for those who do not use the train.
With this in mind, I have travelled BOTH ways during the Monday to Friday period on service 152 from Preston Bus Station which passes through Blackburn, Rishton, Padiham , arriving at Burnley Bus Station.
Many users were short-route users, e.g. Blackburn to Rishton, Rishton to Padiham, etc. Unlike the existing Preston to Colne rail service, this bus runs every 30 minutes. Together, in conjunction with the train, this service provides a good transport link on the section from Preston to Burnley, with the added incentive of numerous bus stops that make bus travel for workpeople, shoppers and schoolchildren so attractive.
Finally, there are many connectional buses to outlying areas at both Blackburn and Burnley bus stations.
I think if I had a choice between going on the train to Manchester using the link or going on the X41 Blackburn-Accrington to Manchester I would choose the train as the buses on the X41 route are old crates and should have been replaced years ago