Agreed but modern trams have full width cabs and still have a view out the front.
The cost still would have been prohibitive - you'd need to install a new desk and working system to replace the old one. Plus it means two less seats during the peak!
Agreed but modern trams have full width cabs and still have a view out the front.
surely it hasn't taken them 9 months to do that?
It only looks like its been repainted and had a new interior. going by the video it looks as if nothing has been done below the solebar. Its all still full of grime and brake dust?!
Do bear in mind the structure of the cars has received a great deal of attention and correction of corroded metalwork actually took longer than expected.
Not sure if they also received any mechanical attention, although I did hear that since traction equipment was deemed to be in good order it would be left in place.
Jon
I wonder because it took so long to do "the bits we don't see" - they decided not to mess around the front end and keep it more or less similar than what it is now?
Paul_10 said:I also wonder when will the metrocar be out on the system to do the testing, will they wait until the 2nd train has come back and do the testing whilst they are in a pair or will they just do the testing with the solo unit? You do get the feeling that the date the refurbished unit will be in PS will be getting pushed back and back.
Possibly. Some of those pictures that are on
Sure it will have to be when the other one is back, to make sure they both work together. So hopefully that means the next one will be arriving soonish. Hopefully before we get any bad weather. Can't see them trying to send one up/down when it has been snowing.
Its one of the reasons I asked on the Nexus forums would you take the cars down by rail as a back up plan incase of any adversed weather conditions during the winter but they are adament to take them down by road even though it risks the project falling further behind and am I right in saying, there would be a financial cost for DB if there are delays?
Did another unit come back last Friday?
Just out of interest, how many units are at Doncaster at any one time ?
Don't think so. Believe the next unit is due back at the start of Nov.
12CSVT said:Just out of interest, how many units are at Doncaster at any one time ?
AFAIK, NEXUS are actively working with East Coast to try and find a solution to the 'Central Station problem' as there have been complaints from Metro passengers about the fact toilets are inaccessible for them.Looks to be exact same size as standard ticket stock on National Rail. Also has the magnetic strip, which might mean you can use it through the barriers at Central. Of course the strip will be also used when the barriers are brought in on selected stations on the nework.
AFAIK, NEXUS are actively working with East Coast to try and find a solution to the 'Central Station problem' as there have been complaints from Metro passengers about the fact toilets are inaccessible for them.
AFAIK, NEXUS are actively working with East Coast to try and find a solution to the 'Central Station problem' as there have been complaints from Metro passengers about the fact toilets are inaccessible for them.
AFAIK, NEXUS are actively working with East Coast to try and find a solution to the 'Central Station problem' as there have been complaints from Metro passengers about the fact toilets are inaccessible for them.
Didnt there used to be a set of toilets down a corridor between burger king and the metro entrance
That sounds a reasonable timeframe from what I've heard.
Before 4041 came back it was 4, so now there are three. Can't send too many down or it would start affecting the timetable. That is one thing that is worrying me about winter - if we have another one like last year, with possibly 3 Metrocars down at Doncaster and 'x' number out for routine maintenance, the timetable will be threatened.
That sounds a reasonable timeframe from what I've heard.
Before 4041 came back it was 4, so now there are three. Can't send too many down or it would start affecting the timetable. That is one thing that is worrying me about winter - if we have another one like last year, with possibly 3 Metrocars down at Doncaster and 'x' number out for routine maintenance, the timetable will be threatened.
I guess you are referring to the toilets in the bar which operates out of the former (but still architecturally beautiful) glazed-tiled ticket hall?Attempting to use toilets on 3&4 when there are far more convenient facilities with in meters of the concourse is just stupid, especially when one set of toilets is in effect above the Metro concourse.
Mainly cosmetic - you'll notice there aren't any signs or notices up yet - so they'll need to be added.
--- old post above --- --- new post below ---
Took a trip up to Palmersville today to have a look at the new machines. Very similar to some of the Northern ones that are around, although there are two slots where the ticket is dispensed. Not sure if there is different stock for different types of ticket yet.
Looks to be exact same size as standard ticket stock on National Rail. Also has the magnetic strip, which might mean you can use it through the barriers at Central. Of course the strip will be also used when the barriers are brought in on selected stations on the nework.
the toilets are part of the mainline station though so if this was to happen it would give potential for someone to hop on a train without paying the proper fare
Any images of the new machines knocking around anywhere? Not had a chance to get to have a nose at any.
There is a video on You Tube, should be a link through the Nexus website. I'll have a look later to see if I can find it.
Was this what you were referring to?
http://www.youtube.com/watch?v=mxwntdC9UNY
Aye that's it. Only one on the system so far that I know of. Taken its time as well!